Free sample paper for QSO 349 Module 5
The Low Bid Came Third: Scoring Three Shipyard Proposals to Build the Casco Narrows Ferry
[Student Name]
Southern New Hampshire University
QSO 349: Project Contracting and Procurement
Source Selection Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Low Bid Came Third: Scoring Three Shipyard Proposals to Build the Casco Narrows Ferry
Introduction
The Casco Narrows Ferry District issued its request for proposals for a 149-passenger hybrid-electric ferry in February 2028, with the approved contract design attached and a firm fixed price with a battery price adjustment as the contract type. Three shipyards submitted proposals by the April deadline. This assignment evaluates them using the criteria and weights announced in the request, explains every score, tests whether the ranking is sensitive to the weights and recommends a yard for negotiation. The district's vessel budget is $11.2 million.
Criteria, Weights and Scale
The request announced five criteria: technical approach, 30 percent; relevant experience with aluminum passenger vessels and hybrid or electric propulsion, 20 percent; schedule, 15 percent; past performance, 10 percent; and price, 25 percent. Each non-price criterion is scored from one to ten, where ten means the proposal fully meets the requirement with strengths that reduce the district's risk, seven means it meets the requirement with minor weaknesses, five means it meets it with weaknesses that need discussion and three or below means significant deficiencies. Price is scored by dividing the lowest price by each bidder's price and multiplying by 25.
Holt (1998), reviewing methods for selecting contractors, found that multi-attribute methods that weigh several criteria together give buyers a more rounded view of a contractor's ability to deliver than lowest-price selection, provided the criteria and weights are set in advance and applied consistently. Watt et al. (2010), in a choice experiment with experienced decision makers on public and private projects, found that the technical proposal and past project performance weighed more heavily than price in their tender evaluations. Thai (2001) stresses that a public buyer must be able to show how it reached a decision, not only what it decided, which is why the scale's definitions were written before any proposal arrived. The district's weights are consistent with the selection research, and three evaluators scored each proposal separately before agreeing on consensus scores.
The Proposals
Bayhead Marine, a Maine yard, proposed $11.4 million and delivery in eleven months. Its technical approach is sound: it adopts the contract design without exceptions, shows a battery installation sequence that keeps the battery room clear until the hull is complete and proposes a quality plan with hold points for the owner's representative. It earned eight. It has built nine aluminum passenger ferries but only one hybrid, a smaller harbor boat, so experience earned seven. Its schedule is detailed and orders cells within 30 days, earning eight. Three ferry operators rated its past work highly, with one late delivery of six weeks, earning nine.
Tern Harbor Shipbuilding, a Washington yard, proposed $12.1 million and delivery in twelve months. Its technical approach is equally strong, earning eight. It has delivered four hybrid ferries, the most of any bidder, earning nine for experience. Its twelve-month schedule misses the district's May 2029 target by about a month unless the work is accelerated, earning six. Its references were good, with one dispute over change orders, earning eight. Delivery from the West Coast also requires a long ocean or overland transit, which its proposal prices in.
Gulfline Boatworks, a Louisiana yard, proposed $10.3 million and delivery in eight months. It has built two hybrid workboats and many passenger vessels, earning eight for experience. But its technical approach relocates the battery room to save weight in a way that conflicts with the approved fire separation in the contract design, which would require a new review by the Coast Guard, so it earned six. Its eight-month schedule assumes cells arrive in five months, two months faster than any supplier quoted, and was judged not credible, earning six. Two references described late deliveries and disputes, earning six for past performance.
Scores
Weighted scores
| Criterion | Weight | Bayhead Marine | Tern Harbor | Gulfline Boatworks |
|---|---|---|---|---|
| Technical approach | 30 | 24.0 | 24.0 | 18.0 |
| Relevant experience | 20 | 14.0 | 18.0 | 16.0 |
| Schedule | 15 | 12.0 | 9.0 | 9.0 |
| Past performance | 10 | 9.0 | 8.0 | 6.0 |
| Price | 25 | 22.6 | 21.3 | 25.0 |
| Total | 100 | 81.6 | 80.3 | 74.0 |
Bayhead ranks first with 81.6, Tern Harbor second with 80.3 and Gulfline third with 74.0. Gulfline's price advantage of $1.1 million over Bayhead earns it only 2.4 more points on price, while its technical, schedule and past performance weaknesses cost it far more. That outcome is what the district intended by weighting price at 25 percent: a lower price cannot buy back a design change that needs a new Coast Guard review or a schedule the battery supplier cannot meet.
Sensitivity
Bayhead and Tern Harbor are only 1.3 points apart, so the ranking was tested. Moving five points of weight from price to experience narrows the gap to 0.1 point, with Bayhead still ahead. Tern Harbor overtakes only if experience is weighted at 30 percent and both technical approach and price lose five points, giving Tern Harbor 81.0 and Bayhead 80.1. Raising Bayhead's experience score from seven to eight, or lowering Tern Harbor's schedule score by one, also leaves the order unchanged. The ranking therefore depends on the announced weights rather than on any one close judgment, and the weights cannot be changed after proposals have been opened without treating the bidders unfairly. Gulfline remains third under every test.
Price Realism and Affordability
Bayhead's $11.4 million is close to the naval architect's estimate of $11.0 million to $11.5 million, so it is realistic. It is, however, $200,000 above the district's vessel budget. The district's contingency could cover it, but using contingency before construction begins would leave little for change orders. Bayhead's proposal includes $260,000 for spare parts above the district's list and a premium seating package, both of which could be reduced in negotiation.
Recommendation
The district should open negotiations with Bayhead Marine and hold Tern Harbor's proposal in reserve. The negotiation should aim to bring the price within the $11.2 million budget by reviewing the spare parts and seating packages, confirm the battery order date and the price adjustment index, set payment milestones and liquidated damages for late delivery and agree on the owner's representative's hold points. If negotiation fails, the district can turn to Tern Harbor, with acceleration to meet the delivery date as a negotiation point. Each evaluator's score sheets and the consensus record will go into the procurement file before the board's award.
References
Holt, G. D. (1998). Which contractor selection methodology? International Journal of Project Management, 16(3), 153-164. https://doi.org/10.1016/S0263-7863(97)00035-5
Thai, K. V. (2001). Public procurement re-examined. Journal of Public Procurement, 1(1), 9-50. https://doi.org/10.1108/JOPP-01-01-2001-B001
Watt, D. J., Kayis, B., & Willey, K. (2010). The relative importance of tender evaluation and contractor selection criteria. International Journal of Project Management, 28(1), 51-60. https://doi.org/10.1016/j.ijproman.2009.04.003
What the QSO 349 Module 5 instructions ask for
The QSO 349 Module 5 assignment generally asks students to evaluate seller responses and select a seller. Expect to apply evaluation criteria and weights, often supplied or announced in a solicitation; score each proposal on technical, management, experience and past performance factors; score or compare price; combine the scores; and recommend a seller, sometimes after deciding which proposals fall in the competitive range. Strong evaluations explain each score with evidence from the proposals, use a stated formula for price, test whether the ranking holds when weights or scores change, check that the winner's price is realistic and affordable and identify what must be resolved in negotiation. Evaluators should stick to the criteria the sellers were told about.
How this QSO 349 Module 5 source selection assignment example is built
The assignment evaluates three proposals for the Casco Narrows Ferry District's hybrid-electric ferry, a fictional purchase by a Maine operator. Bayhead Marine bids $11.4 million, Tern Harbor Shipbuilding $12.1 million and Gulfline Boatworks $10.3 million. Using the announced weights, Bayhead scores 81.6, Tern Harbor 80.3 and Gulfline 74.0; Gulfline's battery room layout raises fire safety questions and its eight-month schedule is not credible. A sensitivity test shows Tern Harbor overtakes Bayhead only if the weights for experience and price are changed after the fact. The recommendation is to negotiate with Bayhead, whose price is $200,000 over budget. Holt and Watt, Kayis and Willey support the method.
Where the QSO 349 Module 5 rubric puts the points
The QSO 349 source selection assignment is commonly graded on applying the stated criteria and weights consistently, explaining each score with evidence, scoring price with a clear formula, combining scores correctly, testing sensitivity, checking price realism and affordability and making a justified recommendation with negotiation points. The strongest evaluations show the full scoring table and explain why the lowest price did or did not win. Credit drops when scores are unexplained, criteria change during evaluation, price is scored inconsistently, the sensitivity of a close result is ignored or the recommendation skips affordability. Tables, clear writing and APA citations complete the grade.
QSO 349 Module 5 help: the mistakes that cost points
Start with the criteria and weights the sellers were told about, and do not change them. Define a scoring scale, such as one to ten, with a description of what earns each score. Score each proposal on each criterion and write one or two sentences of evidence for every score. Score price with a formula, such as the lowest price divided by each bidder's price times the price weight. Multiply, add and rank. If the top scores are close, test whether small changes in weights or scores change the ranking. Then check that the leading price is realistic and affordable and list what must be negotiated. A common mistake is scoring on impressions; another is letting the lowest price win without reading whether the proposal can be delivered.
Get QSO 349 Module 5 written to your instructions
Share the QSO 349 Module 5 instructions and the proposals or scenario you were given. A writer builds the evaluation: criteria and weights, a scoring scale, a reasoned score for each proposal, a price-scoring formula, a sensitivity test and a recommendation with the points to negotiate, citing source selection research. Your first QSO 349 evaluation is free, delivered in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 349 papers and related BS Operations Management samples
- QSO 349 Module 1 Discussion: Why Buying the Ferry Is Most of the Project
- QSO 349 Module 2 Make-or-Buy Assignment: Designing the Ferry In-House or With a Naval Architect
- QSO 349 Module 3 Project One: The Procurement Management Plan
- QSO 349 Module 4 Discussion: Fixed Price or Cost-Plus for a First-of-Its-Kind Boat?
- QSO 349 Module 6 Discussion: Negotiating With the Winning Shipyard
- QSO 349 Module 7 Project Two: Changes, a Battery Delay and Closeout
- QSO 349 Module 8 Discussion: A Losing Shipyard's Protest
- QSO 328 Module 3 Project One: The Tile's Life Cycle and the Plant's Place in It
- ACC 318 Module 5 Stockholders' Equity Assignment: Preferred Stock, Treasury Shares and Dividends
- ACC 330 Module 6 Discussion: Why This Family No Longer Itemizes
- OL 324 Module 3 Milestone One: Quality Problem Analysis
QSO 349 Module 5 questions, answered
Where can I find a free QSO 349 Module 5 Source Selection Assignment sample?
The complete QSO 349 Module 5 assignment is on this page: weighted scoring of three shipyard proposals for an invented ferry district.
What is weighted scoring in source selection?
A method in which each proposal is scored on several criteria, each score is multiplied by the criterion's weight and the results are added to rank proposals.
How is price scored in a best-value evaluation?
Often by dividing the lowest price by each bidder's price and multiplying by the price weight, so the lowest price earns the full weight.
What is the competitive range?
The group of proposals that have a reasonable chance of award, with which the buyer may hold discussions or negotiations before final selection.
What is a sensitivity analysis in proposal evaluation?
A test of whether the ranking changes when weights or scores change, showing whether a close result depends on judgments that could reasonably differ.