OL 324 Module 3 Milestone One Example

Reviewed by Portia Lambrick, MBA

This OL 324 Module 3 Milestone One sample analyzes a quality problem with data and quality tools to find its root causes before anyone tries to fix it. SNHU OL 324 (OL-324) sets this diagnosis before any fixes for its BS Business Administration students. The problem is a 7.9 percent defect rate on a 40-cavity mold for diagnostic test cartridge housings at Nashoba Precision Molding, a composite injection molder in Leominster, Massachusetts. A Pareto chart, a cause-and-effect diagram and control charts of shot weight trace short shots and flash to wet resin, a worn check ring, clogged vents and startups that differ by shift, ending with a problem statement and project goals.

CourseOL 324 Managing Quality
ModuleModule 3
Paper typeundergraduate milestone analyzing a quality problem with data and quality tools to identify its root causes
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 324 Module 3

1

Short Shots, Flash and the 40-Cavity Mold: A Quality Problem Analysis for Nashoba Precision Molding

[Student Name]

Southern New Hampshire University

OL 324: Managing Quality

Milestone One: Quality Problem Analysis

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingDefect counts, control chart data and causes are fictional, prepared only for this OL 324 milestone.
2

Short Shots, Flash and the 40-Cavity Mold: A Quality Problem Analysis for Nashoba Precision Molding

Introduction

The cost of quality analysis found that Nashoba Precision Molding spends about $2.2 million a year on internal failures and $765,000 on external ones. The most urgent source is the medical device customer, which rejected three lots this year and moved the plant to conditional status. Those lots all came from one tool: a 40-cavity mold producing housings for single-use diagnostic test cartridges, running around the clock on Press 23. This milestone analyzes defects on that mold to find their root causes.

What this page is doingNarrows the problem.
3

The Problem and Its Impact

Over the past six months, Press 23 produced about 2.4 million housings, of which 7.9 percent were rejected at inspection, against the plant's average of 6.8 percent and the customer's expectation of under 1 percent reaching its dock. The scrap alone cost about $155,000 in resin and press time over those six months, inspectors spend more hours on this part than on any other, and the three rejected lots cost $140,000 in sorting charges and nearly cost the plant the account.

What this page is doingStates the size of the problem.
4

What the Customer Sees

The three rejected lots tell the story from the customer's side. In each, the customer's incoming inspection found housings with incomplete edges, short shots, that would not seal against the cartridge lid, and housings with thin fins of excess plastic, flash, that could break off inside a test. Either defect could cause a diagnostic test to fail in a clinic. The customer quarantined each lot, sorted it at Nashoba's expense and filed a corrective action request asking for root causes and evidence of a fix within thirty days. Two of those requests are still open.

What this page is doingDescribes the rejected lots.
5

Approach

In the account of Schroeder et al. (2008), Six Sigma organizes improvement around trained experts, a fixed sequence of steps and hard numbers, aimed at cutting variation and defects. Linderman et al. (2003), viewing Six Sigma through goal theory, argued that its specific, challenging goals and structured method help improvement teams perform. This analysis follows the measure and analyze steps of that structured method. For four weeks, inspectors recorded every rejected part by defect type, cavity, shift and time on a check sheet. The team, a process technician from each shift, the mold maintenance lead and the quality engineer, met weekly to review the data.

What this page is doingExplains the method.
6

Which Defects Matter

Defects on Press 23, four weeks (31,600 rejected parts)

DefectCountShareCumulative
Short shot (incomplete fill)12,00038%38%
Flash (excess plastic at parting line)7,60024%62%
Sink marks4,40014%76%
Black specks (contamination)3,50011%87%
Warp2,5008%95%
Other1,6005%100%

Short shots and flash account for nearly two-thirds of defects, and both relate to how plastic fills the mold. Of the short shots, 70 percent came from six cavities at the far end of the mold, a sign of uneven filling.

What this page is doingPresents the Pareto analysis.
7

Possible Causes

The team sketched a fishbone diagram and sorted possible causes into six groups. Under materials: resin moisture, lot-to-lot variation in melt flow. Under machine: barrel temperature drift, a worn check ring that lets material slip back, inconsistent injection pressure. Under mold: clogged vents, worn parting line surfaces, uneven cooling. Under method: startup procedures, setpoint changes between shifts. Under measurement: inconsistent visual standards among inspectors. Under people: training of night-shift technicians. The diagram generated fourteen possible causes, too many to fix at once, so the team turned to process data to narrow them.

What this page is doingOrganizes causes by category.
8

What the Control Charts Show

Shot weight, the mass of plastic injected each cycle, is a good indicator of fill. The team sampled five shots every two hours and plotted average and range charts over four weeks. Woodall (2000) cautioned that control charts should be used to understand and stabilize a process rather than treated simply as statistical tests, and that charts built from an unstable initial period can mislead. The charts show the process is not stable. Points fall below the lower control limit in three clusters: within six hours after each change to a new resin lot, during the first two hours after night-shift startups and during the last week of the study, when the range chart also widened. Between these clusters, shot weight varies only within its normal range.

What this page is doingSeparates common from special causes.
9

Testing the Likely Causes

Each cluster pointed to a cause, which the team then checked. Resin moisture readings taken after lot changes averaged 0.04 percent, twice the resin maker's maximum of 0.02 percent, because new lots went from the warehouse straight into a dryer that had not reached temperature. Night-shift startups used a different sequence of heats and purges than day shift, recorded in a technician's notebook rather than a written procedure. The widening range in the final week matched wear on the check ring, which maintenance found worn beyond its limit when they pulled the screw. And the six problem cavities had partly clogged vents, found during a mold inspection, which trapped air and caused short shots and, when technicians raised pressure to compensate, flash elsewhere.

What this page is doingConfirms root causes with evidence.
10

Root Causes

Most of the short shots and flash come down to four causes: resin that was still damp after a new lot arrived, each shift starting the press its own way, a worn check ring and clogged vents in six cavities. A fifth factor makes them worse: when parts begin to short, technicians raise injection pressure, which causes flash in other cavities, a pattern that turns one problem into two.

What this page is doingSummarizes what the analysis found.
11

What the Analysis Rules Out

The data also ruled some explanations out. Operator carelessness, the plant manager's first explanation, does not fit the pattern: defects cluster after lot changes, at startups and with the worn check ring, regardless of who is running the press. Mold temperature, another suspect, stayed within its range throughout. And inspector inconsistency, while real, affects which defects are counted, not whether parts are made correctly. Ruling these out keeps the improvement project focused.

What this page is doingNotes causes not supported.
12

Problem Statement and Goals

Press 23's 40-cavity diagnostic housing mold produces 7.9 percent defects, mostly short shots and flash, because of wet resin after lot changes, inconsistent startups, a worn check ring and clogged vents, costing about $310,000 a year in scrap and threatening the medical device account. The improvement project's goals are to reduce defects on this mold below 2 percent within four months, bring shot weight into statistical control and lift the customer's scorecard above 85 within two quarters.

What this page is doingSets up the improvement project.
13

References

Linderman, K., Schroeder, R. G., Zaheer, S., & Choo, A. S. (2003). Six Sigma: A goal-theoretic perspective. Journal of Operations Management, 21(2), 193-203. https://doi.org/10.1016/S0272-6963(02)00087-6

Schroeder, R. G., Linderman, K., Liedtke, C., & Choo, A. S. (2008). Six Sigma: Definition and underlying theory. Journal of Operations Management, 26(4), 536-554. https://doi.org/10.1016/j.jom.2007.06.007

Woodall, W. H. (2000). Controversies and contradictions in statistical process control. Journal of Quality Technology, 32(4), 341-350. https://doi.org/10.1080/00224065.2000.11980013

What the OL 324 Module 3 instructions ask for

Milestone One in OL 324 centers on analyzing a specific quality problem using data and quality tools. You will define the problem and its impact, collect data on defects or errors, use tools such as check sheets, Pareto charts, cause-and-effect diagrams and control charts to understand it and identify likely root causes. OL 324 milestones that score well narrow the problem to a process and product, show the data behind each conclusion, use control charts to separate ordinary variation from special causes, test possible causes against evidence rather than opinion and end with a measurable problem statement and goals. They avoid jumping to solutions before the causes are understood.

How this OL 324 Module 3 milestone one example is built

The sample analyzes defects on a 40-cavity mold for diagnostic test cartridge housings running on Press 23 at Nashoba Precision Molding, a composite injection molder in Leominster, Massachusetts. The defect rate is 7.9 percent, and the medical device customer has rejected three lots. A Pareto chart shows short shots and flash make up 62 percent of defects. A cause-and-effect diagram organizes possible causes, and control charts of shot weight show special-cause signals after resin lot changes and at night-shift startups. Checks confirm wet resin, a worn check ring, clogged vents and startup procedures that differ by shift. Schroeder and colleagues on Six Sigma, Linderman and colleagues' goal-theoretic view and Woodall on control charts support the analysis. The customer's view of the rejected lots frames the analysis.

Where the OL 324 Module 3 rubric puts the points

Grading for this OL 324 milestone generally weighs a well-defined problem with its impact, appropriate data collection, correct use of quality tools, sound reasoning from data to root causes, a measurable problem statement and goals, use of research and a tidy layout. The best OL 324 analyses show each tool's result and what it rules in or out. Milestones lose marks for vague problem statements, tools drawn without data, treating every point outside a line as a crisis or every pattern as random, listing possible causes without testing them, blaming operators without evidence or proposing solutions before causes are confirmed.

OL 324 Module 3 help: the mistakes that cost points

Narrow the problem to one product, process or service where the data show trouble, and state its impact in numbers. Collect data on the types and frequency of defects; a check sheet kept for a few weeks is often enough. Build a Pareto chart to find the few defect types that matter most. Brainstorm possible causes with the people who do the work and organize them in a cause-and-effect diagram. Use a control chart on a key measurement to see whether variation is stable or shows special causes, and look at when the signals occur. Test the most likely causes with evidence. Close with a measurable problem statement and project goals. Start from what the customer actually found.

Get OL 324 Module 3 written to your instructions

Send the brief for Milestone One in OL 324 and the quality data you can gather. We define the problem, build a Pareto chart, a cause-and-effect diagram and control charts from your data, trace defects to root causes and write a problem statement with project goals, with research behind the method. Your first OL 324 milestone is free and ready about two days after you send it. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 324 papers and related BS Business Administration samples

OL 324 Module 3 questions, answered

Where can I find a free OL 324 Module 3 Milestone One sample?

The full OL 324 Milestone One appears on this page: Pareto, cause-and-effect and control chart analysis of short shots and flash at a composite molder.

What is a Pareto chart used for?

To rank causes or defect types by frequency or cost, showing the few that account for most of the problem so effort goes where it matters.

What does a control chart show?

Whether a process measurement varies only within its normal range or shows special-cause signals that point to something specific changing.

What is a root cause?

The underlying reason a problem occurs, which, if removed, prevents the problem from recurring, as opposed to a symptom.

What is Six Sigma's approach to problem solving?

A structured method, often define, measure, analyze, improve and control, led by trained specialists and driven by data and measurable goals.