Free sample paper for OL 324 Module 7
Building Quality In: A Quality Management Plan for Nashoba Precision Molding
[Student Name]
Southern New Hampshire University
OL 324: Managing Quality
Final Project: Quality Management Plan
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Building Quality In: A Quality Management Plan for Nashoba Precision Molding
Introduction
For thirty years this molder has managed quality by inspecting finished parts. The course milestones showed what that costs: about $4.2 million a year, roughly 9 percent of sales, with 70 percent spent on failures and under 8 percent on prevention, and a medical device customer that has placed the plant on conditional status. This plan sets a new strategy, prevention first, and lays out how the plant will build quality into its processes, its supply chain and its daily habits.
How the Plan Changed After Feedback
Comments on the cost of quality paper asked how the estimate of failure savings was reached; the plan now bases savings on the Press 23 pilot's measured results. Comments on Milestone Two asked whether technicians had time for project work; the plan now funds four hours a week of improvement time per technician on project teams. Comments on the supplier paper asked about the colorant supplier's response; the plan now names a replacement supplier if corrective action fails.
Quality Defined by Customer
Dean and Bowen (1994) placed customer focus first among the principles of total quality. The plan defines quality the way each major customer does. For the medical device customer, it means zero defects reaching the dock, full lot traceability and a scorecard above 85. For the consumer products customer, it means on-time delivery above 97 percent and no cosmetic rejects. For the industrial customer, it means consistent fit at a competitive price, measured by assembly rejects at the customer's plant.
Prevention First
The plan moves spending upstream. Scientific molding training for technicians on all shifts, sensors and scheduled maintenance on the molds that run the most parts, drying and testing resin before it reaches each machine and statistical process control run by operators add about $405,000 a year. As process control proves itself, end-of-line inspection will fall from nine inspectors to six, with the three moving into process audit and lab roles rather than leaving. Ittner (1996) found that plants raising prevention and appraisal spending saw failure costs fall afterward and keep falling, the pattern this plan expects.
Improvement Projects
The Press 23 project cut defects on the diagnostic housing mold from 7.9 percent to 1.6 percent during its pilot and held them below 2 percent for eight weeks afterward. The plan applies the same structured method to the two next highest-scrap molds in the first year and four more in the second. Zu et al. (2008) found that Six Sigma's structured roles, procedure and metrics complemented broader quality management; here each project team will include technicians from every shift, a maintenance lead and a quality engineer, with an owner who sponsors it and clears obstacles.
Suppliers and Certification
Medical-grade resin will be tested on arrival for melt flow and moisture, every key supplier will receive a quarterly scorecard and the plant will run a joint project with its main resin supplier on lot variation. Krause et al. (2007) found that supplier development backed by the buyer's commitment and relationship building improved supplier performance. The colorant supplier has ninety days to resolve contamination before the plant switches. ISO 13485 certification will proceed on an eighteen-month timeline at about $145,000, the price of keeping a customer worth about $6 million a year.
From Blame to Problem Solving
Repenning and Sterman (2002) found that managers who blame workers for problems built into processes push for more output and starve improvement, trapping their organizations in firefighting. The write-ups after the Press 23 rejections were an example. Under the plan, every significant defect or complaint triggers a short problem-solving review with the people who run the process, not a disciplinary meeting. Supervisors will be trained to lead these reviews, and the number of reviews completed, not the number of people written up, will be reported.
Training and Skills
The plan's success depends on skills the plant has not had to build before. Process technicians on all three shifts will complete scientific molding training, which teaches how to set and hold a process window based on how the plastic fills the mold rather than on trial and error. Operators at presses running control charts will learn to read them and follow the reaction plan. Supervisors will learn to lead short problem-solving reviews. And two engineers and two senior technicians will be trained to lead improvement projects, so the plant does not depend on one quality engineer. Training will be scheduled during shift overlap and paid at regular rates, and each course will be followed by practice on a real press within two weeks.
Communication With Customers
The medical customer will receive a quarterly report on the plan's progress, including Press 23's control charts, the status of corrective actions and the certification timeline, along with an invitation to visit the plant. The consumer and industrial customers will receive a shorter report on defect and delivery measures. Sharing data openly is meant to show customers that quality is being managed, not just promised.
Governance
A quality council of the plant manager, the operations and maintenance managers, the quality engineer and two technicians elected by their peers will meet monthly to review measures, choose projects and remove obstacles. The owners will receive the cost of quality and customer scorecards each month alongside sales and margin.
Measures
Quality measures and first-year targets
| Measure | Now | Target |
|---|---|---|
| Cost of quality as share of sales | 9.1% | 7.0% |
| Plant scrap rate | 6.8% | 4.5% |
| Medical customer scorecard | 78 | 85 or higher |
| Customer complaints per year | 37 | Under 20 |
| Presses with operator-run control charts | 1 | 20 |
| Problem-solving reviews completed | 0 | One for every significant defect |
Budget and Return
First-year costs total about $730,000: $405,000 for prevention, $82,000 for each of two new improvement projects, $145,000 for certification work spread over eighteen months, of which about $95,000 falls in the first year, $28,000 for incoming testing equipment and about $40,000 for supervisor training and technicians' improvement time beyond project budgets. Expected first-year savings are about $1.2 million in lower scrap, sorting, downtime, inspection and customer charges, and the plan protects the medical account.
Conclusion
The owners must approve the prevention budget, support the shift from inspection to process control, back the end of disciplinary responses to system problems and commit to certification. In return, the plant can expect lower costs within a year, a stronger position with its most demanding customer and a way of improving that does not depend on any one engineer.
References
Dean, J. W., Jr., & Bowen, D. E. (1994). Management theory and total quality: Improving research and practice through theory development. Academy of Management Review, 19(3), 392-418. https://doi.org/10.5465/amr.1994.9412271803
Ittner, C. D. (1996). Exploratory evidence on the behavior of quality costs. Operations Research, 44(1), 114-130. https://doi.org/10.1287/opre.44.1.114
Krause, D. R., Handfield, R. B., & Tyler, B. B. (2007). The relationships between supplier development, commitment, social capital accumulation and performance improvement. Journal of Operations Management, 25(2), 528-545. https://doi.org/10.1016/j.jom.2006.05.007
Repenning, N. P., & Sterman, J. D. (2002). Capability traps and self-confirming attribution errors in the dynamics of process improvement. Administrative Science Quarterly, 47(2), 265-295. https://doi.org/10.2307/3094806
Zu, X., Fredendall, L. D., & Douglas, T. J. (2008). The evolving theory of quality management: The role of Six Sigma. Journal of Operations Management, 26(5), 630-650. https://doi.org/10.1016/j.jom.2008.02.001
What the OL 324 Module 7 instructions ask for
In the OL 324 final project, students present a quality management plan that brings together their analysis of an organization's quality, its costs and causes, improvement methods, suppliers and culture. Expect to restate the quality problem with evidence, set a quality strategy, recommend improvement projects, supplier and certification steps and changes in how problems are handled, then explain governance, measures and costs. OL 324 plans that score well show how each element addresses a finding from earlier work, balance immediate fixes with lasting systems, address the people side of quality as seriously as the technical side, quantify costs and savings and show where instructor comments changed the plan.
How this OL 324 Module 7 final project example is built
The sample plan addresses Nashoba Precision Molding, a composite injection molder in Leominster, Massachusetts, with about $4.2 million a year in quality costs and conditional status with its medical device customer. It defines quality by customer, adopts a prevention-first strategy that moves spending from end-of-line inspection to process control, extends the Press 23 project method to the next highest-scrap molds, launches a supplier quality program and ISO 13485 certification, replaces blame with structured problem solving and sets a quality council, monthly measures and a first-year budget of about $730,000 against expected savings of about $1.2 million. Research by Dean and Bowen, Ittner, Zu and colleagues, Krause and colleagues and Repenning and Sterman supports the plan. Training, customer communication and governance complete the plan.
Where the OL 324 Module 7 rubric puts the points
Grading for the OL 324 final project usually weighs a well-evidenced statement of the quality problem, a coherent quality strategy, improvement projects tied to root causes, attention to suppliers and certification, a realistic approach to culture and people, governance and measures, costs and savings, use of milestone comments and research and polished writing. Standout OL 324 plans show how the plant will keep improving after the first projects end. Plans lose marks for listing tools without a strategy, relying on more inspection, ignoring how problems are handled day to day, omitting costs or measures or simply stacking milestones without revision.
OL 324 Module 7 help: the mistakes that cost points
Revise each OL 324 milestone with your instructor's comments, then open the plan with the quality problem, its cost and why it matters now. State a quality strategy in a sentence or two, such as prevention first. Organize recommendations so each answers a finding: projects for the biggest causes, supplier steps, certification if needed and changes in how people respond to problems. Explain who will govern the effort and how progress will be reviewed. Set measures that cover cost, defects, customer ratings and process stability. Estimate costs and savings with the reasoning shown. Finish with the choices OL 324 leaders must make and what results to expect in the first year. Plan the training people will need to carry the plan out.
Get OL 324 Module 7 written to your instructions
Share your OL 324 Module 7 instructions with the milestone papers you have so far, and we will combine them into one quality management plan covering customer requirements, cost of quality, improvement projects, supplier quality, culture, measures and budget, revised with your instructor's comments. The first OL 324 final project is free, with a draft about two days after you ask. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 324 papers and related BS Business Administration samples
- OL 324 Module 1 Discussion: What Quality Means
- OL 324 Module 2 Cost of Quality Assignment: Measuring the Cost of Quality
- OL 324 Module 3 Milestone One: Quality Problem Analysis
- OL 324 Module 4 Discussion: Blaming Workers or Fixing the System
- OL 324 Module 5 Milestone Two: Quality Improvement Project Plan
- OL 324 Module 6 Supplier Quality Assignment: Supplier Quality and Certification
- OL 324 Module 8 Discussion: Sustaining a Quality Culture
- MKT 432 Module 1 Discussion: Why Plan Marketing Strategically
- ACC 318 Module 1 Discussion: A Lawsuit, a Fine and the Contingency Rules
- ACC 405 Module 1 Discussion: When Control Means One Set of Statements
- MKT 205 Module 5 Milestone Two: The Marketing Mix Strategy
OL 324 Module 7 questions, answered
Where can I find a free OL 324 Module 7 Final Project sample?
The complete OL 324 final project is here: a prevention-first quality management plan for a composite injection molder.
What goes in a quality management plan?
The quality problem and its cost, a quality strategy, improvement projects, supplier and certification steps, changes in culture and problem handling, governance, measures and a budget.
What does prevention-first mean in quality management?
Spending effort on keeping defects from occurring, through process control, maintenance, training and design, rather than on finding them after they happen.
How should a quality effort be governed?
Through a small council of leaders and front-line representatives that sets priorities, reviews measures monthly and removes obstacles for improvement teams.
How do you show a quality plan pays off?
By measuring the cost of quality before and after, along with defect rates and customer ratings, and comparing savings with the plan's costs.