OL 324 Module 6 Supplier Quality Assignment Example

Reviewed by Portia Lambrick, MBA

This OL 324 Module 6 Supplier Quality sample examines how an organization manages quality across its supply chain, as a buyer of materials and as a supplier to its own customers. SNHU OL 324 (OL-324) has BS Business Administration students apply supplier quality and certification concepts to a real case. The organization is Nashoba Precision Molding, a composite injection molder whose resin lots vary and whose medical device customer wants ISO 13485 certification within eighteen months. The paper reviews supplier performance and incoming testing, plans supplier development, weighs the evidence on certification and recommends a supplier quality program and pursuing ISO 13485.

CourseOL 324 Managing Quality
ModuleModule 6
Paper typeundergraduate assignment examining supplier quality management and whether an organization should pursue a quality certification
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 324 Module 6

1

Resin Lots, a Scorecard and ISO 13485: Supplier Quality at Nashoba Precision Molding

[Student Name]

Southern New Hampshire University

OL 324: Managing Quality

Supplier Quality Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingSuppliers, scorecards and certification costs are fictional, invented to illustrate OL 324 concepts.
2

Resin Lots, a Scorecard and ISO 13485: Supplier Quality at Nashoba Precision Molding

Introduction

The improvement project on Press 23 addressed causes inside the plant. But two of the defects in the Pareto analysis, black specks and part of the short-shot problem, trace back to materials the plant buys, and the plant's future with its largest customer depends on how it performs as a supplier. This paper examines quality on both sides of Nashoba Precision Molding's supply chain and recommends a supplier quality program and a decision on certification.

What this page is doingFrames quality across the supply chain.
3

Upstream: The Plant's Suppliers

Key supplier performance, past 12 months

SupplierMaterialLots receivedLots with problemsMain problem
Resin supplier AMedical-grade polycarbonate649Melt flow at the edge of specification; moisture on arrival
Resin supplier BPolypropylene for consumer parts884Occasional moisture
Colorant supplierColor concentrate416Black specks from contaminated batches
Mold steel and componentsInserts and vents22 orders2Late delivery

Today the plant accepts resin on the supplier's certificate of analysis, without its own testing. The lots with problems all carried certificates showing results within specification. Resin supplier A's melt flow variation, within specification but at its upper and lower edges, explains why shot weight shifted after lot changes even when moisture was controlled.

What this page is doingAssesses supplier performance.
4

Monitoring Versus Developing Suppliers

There are two ways to improve supplier quality: watch suppliers more closely or help them improve. Krause et al. (2007), surveying buying firms, found that supplier development, when backed by the buyer's commitment and by building relationships and shared knowledge with suppliers, was associated with improvements in supplier performance. Monitoring alone tells the plant when a lot is bad; development can make fewer lots bad. Resin supplier A is the obvious candidate for development: it supplies the medical housing, it is large enough to have process engineers and it has expressed interest in keeping the business.

What this page is doingApplies supplier development research.
5

A Supplier Quality Program

Supplier quality program

PracticeDescriptionOwnerCost
Supplier scorecardQuarterly rating on lot quality, delivery and responsiveness, shared with each supplierPurchasing; qualityStaff time
Incoming verificationMelt flow and moisture tests on every medical-grade lot; colorant samples checked on a test pressLab$28,000 equipment and time
Tighter specification with supplier ANarrower melt flow range agreed for medical lotsQuality engineer; supplier APossible price increase of 2%
Joint improvement projectSupplier A's engineers and the plant's team study lot variation togetherQuality engineerStaff time
Colorant supplier corrective actionFormal corrective action request; switch suppliers if not resolved in 90 daysPurchasingStaff time
What this page is doingRecommends practices.
6

The Cost of Supplier Problems

Supplier problems are not free just because the supplier caused them. Black specks from contaminated colorant caused about 11 percent of defects on Press 23 and appeared on four consumer molds as well, costing an estimated $120,000 in scrap and sorting last year. Resin lots at the edge of melt flow specification contributed to the short shots that led to the medical customer's rejections and sorting charges. Under the plant's purchase terms, suppliers credit only the material itself when a lot is proven bad, not the press time, labor and customer charges that follow. A supplier quality program therefore pays for itself if it prevents even a handful of bad lots from reaching the presses.

What this page is doingPuts a number on upstream quality.
7

Selecting Suppliers in the Future

Purchasing has chosen suppliers mainly on price and delivery. Going forward, any new supplier of resin, colorant or mold components for medical parts will be qualified through a trial run, a review of its own quality system and agreement to notify the plant before changing raw materials or processes. Price will remain important, but a supplier that is slightly cheaper and causes one rejected medical lot a year is far more expensive.

What this page is doingAdds quality to purchasing decisions.
8

Downstream: The Plant as a Supplier

The medical device customer rates its suppliers quarterly on quality, delivery, documentation and responsiveness. Nashoba's score of 78 places it on conditional status, and the customer has said that continued business requires certification to ISO 13485, the quality management standard for medical device manufacturing, within eighteen months. The plant holds ISO 9001 certification, which covers many of the same elements, but ISO 13485 adds stricter requirements for documentation, traceability, risk management and process validation.

What this page is doingExamines the customer's requirements.
9

Is Certification Worth It?

Certification is costly. The plant estimates about $145,000 over eighteen months: a consultant for a gap analysis and documentation, $40,000; validation of the processes for medical parts, $55,000; training, $20,000; software for document control and traceability, $18,000; and the certification audit, $12,000. The evidence on certification is encouraging. Corbett et al. (2005), studying U.S. firms, found that firms that obtained ISO 9000 certification showed significantly improved financial performance compared with similar uncertified firms. Levine and Toffel (2010), studying California employers, found that firms that adopted ISO 9001 grew faster in sales, employment and payroll than comparable firms, with no sign that adoption worsened job quality for employees. Neither study examined ISO 13485 directly, but both suggest that well-run quality systems tend to accompany better results rather than mere paperwork. In this case the business argument is direct: the medical account is worth about $6 million a year, and certification is the price of keeping it.

What this page is doingWeighs costs and evidence.
10

What Certification Will Ask of Employees

ISO 13485 will require more documentation from technicians, stricter change control on processes and records that follow every lot. If introduced badly, it could feel like bureaucracy layered on a busy shop floor. The plan builds on the Press 23 project: technicians who wrote the startup sheet will help write procedures for other medical parts, and document control software will reduce paperwork rather than add to it.

What this page is doingConsiders the people side.
11

Recommendation and Timeline

The plant should launch the supplier quality program within three months, beginning with incoming testing of medical-grade resin and the joint project with supplier A, and should pursue ISO 13485 certification on an eighteen-month timeline, with a gap analysis in months one to three, documentation and validation in months four to twelve, internal audits in months thirteen to fifteen and the certification audit in month sixteen or seventeen. The quality engineer will report progress monthly to the owners and quarterly to the medical customer.

What this page is doingSets the path.
12

References

Corbett, C. J., Montes-Sancho, M. J., & Kirsch, D. A. (2005). The financial impact of ISO 9000 certification in the United States: An empirical analysis. Management Science, 51(7), 1046-1059. https://doi.org/10.1287/mnsc.1040.0358

Krause, D. R., Handfield, R. B., & Tyler, B. B. (2007). The relationships between supplier development, commitment, social capital accumulation and performance improvement. Journal of Operations Management, 25(2), 528-545. https://doi.org/10.1016/j.jom.2006.05.007

Levine, D. I., & Toffel, M. W. (2010). Quality management and job quality: How the ISO 9001 standard for quality management systems affects employees and employers. Management Science, 56(6), 978-996. https://doi.org/10.1287/mnsc.1100.1159

What the OL 324 Module 6 instructions ask for

In OL 324, the Module 6 assignment centers on quality beyond the organization's walls, through supplier quality management and quality standards or certifications. You will assess how suppliers affect quality, describe current practices for selecting, monitoring and developing them, consider the organization's own position as a supplier and evaluate whether a certification such as ISO 9001 or an industry standard is worth pursuing. Supplier quality papers that score well in OL 324 use data on supplier performance, distinguish monitoring from developing suppliers, weigh the costs and evidence of certification honestly rather than treating it as automatically worthwhile and recommend specific practices with owners, costs and timelines.

How this OL 324 Module 6 supplier quality assignment example is built

The sample examines Nashoba Precision Molding, a composite injection molder in Leominster, Massachusetts. Upstream, two resin suppliers deliver lots that vary in melt flow and moisture, and a colorant supplier has caused black-speck contamination; incoming testing is limited to a certificate check. Downstream, the plant's medical device customer, about $6 million of sales, wants ISO 13485 certification within eighteen months. Krause, Handfield and Tyler's research on supplier development, Corbett, Montes-Sancho and Kirsch's study of ISO 9000 and financial performance and Levine and Toffel's study of ISO 9001's effects on employers and employees inform recommendations for supplier scorecards, incoming testing, joint improvement work with the main resin supplier and certification at an estimated cost of $145,000. The cost of supplier problems is estimated before solutions are proposed.

Where the OL 324 Module 6 rubric puts the points

OL 324 supplier quality papers are generally graded on an accurate assessment of supplier performance with data, sound practices for selecting, monitoring and developing suppliers, attention to the organization's own role as a supplier, a balanced evaluation of certification using evidence, practical recommendations and clear writing. The strongest OL 324 papers show how supplier variation reaches the final product and what it costs. Papers lose marks for treating supplier quality as the supplier's problem alone, relying on certificates without verification, recommending certification because customers like it without weighing costs and benefits, ignoring the employees who must run the system or offering no timeline.

OL 324 Module 6 help: the mistakes that cost points

List the suppliers whose materials or services most affect quality, and gather data on their performance, such as defects, late deliveries and lot variation. Describe how suppliers are chosen, monitored and developed now. Trace how supplier problems show up in your own products. Then look at your organization as a supplier: what do customers require, and how do they rate you? If a certification is under consideration, weigh its costs, the evidence on its benefits and what it would demand of employees. Recommend practices, such as scorecards, incoming verification and joint improvement projects, and a decision on certification, each with owners, costs and timing. Estimate what supplier problems cost you, not just the supplier.

Get OL 324 Module 6 written to your instructions

Share the OL 324 Module 6 instructions and describe the main suppliers and customers. We assess supplier quality with data, plan scorecards, incoming checks and supplier development, weigh the evidence on certification and recommend a path with costs and timing. Your first OL 324 supplier quality paper is free, and we return it two days after the request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 324 papers and related BS Business Administration samples

OL 324 Module 6 questions, answered

Where can I find a free OL 324 Module 6 supplier quality sample?

This page includes the complete OL 324 Module 6 paper on resin suppliers, a customer scorecard and ISO 13485 at a composite molder.

What is supplier development?

Efforts by a buyer to improve a supplier's performance or capabilities, such as joint improvement projects, training and sharing data.

Does ISO 9000 certification improve financial performance?

A study of U.S. firms found that certified firms showed improved financial results compared with similar firms that were not certified.

Does ISO 9001 harm employees?

A study of California employers found no sign that adoption worsened job quality and found faster growth in sales, employment and payroll among adopters.

What is ISO 13485?

An international standard for quality management systems in the design and manufacture of medical devices, often required of suppliers by medical device makers.