OL 324 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 324 Module 4 Discussion sample asks whether quality problems belong to the workers who make the parts or to the system they work in. SNHU OL 324 (OL-324) takes up Deming's ideas at this point in its BS Business Administration course. The post examines how the plant manager at Nashoba Precision Molding, a composite injection molder, wrote up two night-shift technicians for Press 23 defects that the analysis traced to wet resin, a worn check ring, clogged vents and unwritten startup procedures. It applies research on Deming's management method, on how blaming workers traps organizations in firefighting and on quality practices and performance, then asks classmates for their own examples.

CourseOL 324 Managing Quality
ModuleModule 4
Paper typeundergraduate discussion post on whether quality problems should be attributed to workers or to systems, applying Deming's ideas
LengthAbout 370 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 324 Module 4

1

Module Four Discussion

The Operator or the System?

After the third rejected lot of diagnostic housings from Press 23, the plant manager at Nashoba Precision Molding wrote up the two night-shift process technicians on duty when the lot was molded and posted a sign at the press entrance: "Quality is everyone's job." The analysis I presented the following week found that most of the defects came from wet resin after lot changes, a worn check ring, clogged vents in six cavities and a startup procedure that each shift ran differently because it had never been written down.

What this page is doingWhat happened.
2

Anderson et al. (1994), setting out the theory underlying Deming's management method, described it as resting on visionary leadership, cooperation, learning, process management, continuous improvement and employee fulfillment, all aimed at customer satisfaction. At the heart of the method sits the claim that the bulk of the variation people see is produced by the system that management designs, not by the individuals inside it. The night-shift technicians did not choose the dryer schedule, the maintenance interval or the absence of a written procedure.

What this page is doingWhat Deming's theory says.
3

Repenning and Sterman (2002), studying process improvement efforts, found that managers tend to attribute poor performance to workers' effort or discipline rather than to the process, and then push for more output. That push leaves no time for improvement, so problems persist, which seems to confirm the original belief. They called this a capability trap. The write-ups follow the pattern exactly: they confirm a story about careless technicians, change nothing in the process and teach technicians to hide problems rather than report them.

What this page is doingWhy managers blame anyway.
4

Withdraw the write-ups with an explanation of what the analysis found. Ask the two technicians to help write the startup procedure, since they know the press best at 11 p.m. Replace the sign with one that shows the press's weekly defect rate and the improvements under way. In a meta-analysis drawing on dozens of studies, Nair (2006) reported that quality management practices, including leadership and employee involvement, were positively related to firm performance. Involvement starts with not punishing people for the system's problems.

What this page is doingWhat I would do instead.
5

Where have you seen a problem built into a system blamed on the people working in it, and what evidence would have shown the difference?

What this page is doingYour example.
6

References

Anderson, J. C., Rungtusanatham, M., & Schroeder, R. G. (1994). A theory of quality management underlying the Deming management method. Academy of Management Review, 19(3), 472-509. https://doi.org/10.5465/amr.1994.9412271808

Nair, A. (2006). Meta-analysis of the relationship between quality management practices and firm performance: Implications for quality management theory development. Journal of Operations Management, 24(6), 948-975. https://doi.org/10.1016/j.jom.2005.11.005

Repenning, N. P., & Sterman, J. D. (2002). Capability traps and self-confirming attribution errors in the dynamics of process improvement. Administrative Science Quarterly, 47(2), 265-295. https://doi.org/10.2307/3094806

What the OL 324 Module 4 instructions ask for

This OL 324 discussion has students examine how an organization responds to quality problems, often through Deming's ideas about systems and people. You will describe a specific problem and the response to it, judge whether the response targeted the real causes and propose a better one. OL 324 posts that score well separate what individual workers controlled from what the system, including procedures, equipment, materials and management decisions, controlled, use research on quality management and on how managers attribute problems, avoid excusing genuine individual failures while recognizing that most variation comes from the system and propose a response that fixes causes and involves the people closest to the work.

How this OL 324 Module 4 discussion example is built

The sample examines a response at Nashoba Precision Molding, a composite injection molder in Leominster, Massachusetts. After the medical device customer rejected lots from Press 23, the plant manager wrote up two night-shift technicians and posted a sign reading "Quality is everyone's job." The analysis, however, had traced the defects to wet resin, a worn check ring, clogged vents and startup procedures that existed only in notebooks. Anderson, Rungtusanatham and Schroeder's account of Deming's method, Repenning and Sterman's research on how blaming workers traps organizations in firefighting and Nair's meta-analysis of quality practices and performance support a proposal to withdraw the write-ups and write the startup procedure with the technicians, followed by a question for classmates.

Where the OL 324 Module 4 rubric puts the points

In OL 324, this discussion tends to be graded on a clear account of the problem and the response, careful separation of individual and system causes, accurate use of Deming's ideas and related research, a workable alternative response and replies that probe the evidence in other OL 324 cases. Top OL 324 posts show the evidence that locates a cause in the system and describe how people closest to the work would help fix it. Posts lose credit when they repeat slogans such as "quality is everyone's job" without examining what that means, excuse every individual mistake, blame management in general terms without specifics or answer classmates with agreement rather than asking what evidence points to the system in their case.

OL 324 Module 4 help: the mistakes that cost points

Describe a quality problem and how the organization responded, including who was held responsible. Then look at the evidence on causes: was the problem built into procedures, equipment, materials, training or management decisions, or truly within one person's control? Use Deming's ideas and research on how managers attribute problems to explain the response. Consider what the response teaches employees, for example whether reporting problems will be rewarded or punished. Propose a response that addresses the causes and involves the people who do the work. End by asking classmates where they have seen a system problem blamed on people, and reply by asking what evidence would settle it. Ask whether the person blamed could have prevented the problem with the tools they had.

Get OL 324 Module 4 written to your instructions

Send the Module 4 prompt for OL 324 and the quality problem or response you want to examine. We separate what the people involved controlled from what the system controlled, apply Deming's ideas and research on attribution errors in improvement and propose a better response, then ask classmates for a case of their own. Your first OL 324 post is free and lands in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 324 papers and related BS Business Administration samples

OL 324 Module 4 questions, answered

Where can I find a free OL 324 Module 4 Discussion sample?

The complete OL 324 Module 4 post appears here: night-shift write-ups, Deming's view and blaming workers for system problems at a composite molder.

What did Deming say about blaming workers?

Deming argued that most variation and defects come from the system that management designs, so blaming individual workers rarely fixes problems and damages trust.

What is a capability trap in process improvement?

A cycle in which managers, blaming workers for problems built into processes, push for more output, which leaves no time for improvement and makes problems worse.

Do quality management practices improve performance?

A meta-analysis found quality management practices, such as leadership, process management and employee involvement, were positively related to several kinds of performance.

Does "quality is everyone's job" help?

Only if people are given the methods, information and authority to improve their work; as a slogan alone it can shift blame without changing anything.