| Course | OL 324 Managing Quality |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment measuring an organization's cost of quality by category and recommending how to shift spending toward prevention |
| Length | About 1,070 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 324 Module 2
What 6.8 Percent Scrap Really Costs: A Cost of Quality Analysis for Nashoba Precision Molding
[Student Name]
Southern New Hampshire University
OL 324: Managing Quality
Cost of Quality Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
What 6.8 Percent Scrap Really Costs: A Cost of Quality Analysis for Nashoba Precision Molding
Introduction
In thirty years the plant has never measured what poor quality costs it. Scrap is tracked by weight, inspection is a line in the labor budget and customer credits are booked as reductions in sales. This paper brings those numbers together using the cost of quality model, estimates the total, examines where the money goes and recommends how to shift spending so that the plant spends more on preventing defects and less on finding and paying for them.
The Model
Schiffauerova and Thomson (2006) surveyed the ways companies tally quality costs and reported that sorting them into prevention, appraisal and failure was the most widely used, and that companies that measured quality costs systematically were better able to target and reduce them. The model sorts costs into four groups. Prevention costs are spent to keep defects from happening, such as training, design reviews and maintenance. Appraisal costs pay for catching defects through checks and tests. Internal failure costs arise from defects caught before shipment, such as scrap, rework and downtime. External failure costs arise from defects customers find, such as returns, credits and complaint handling.
Where the Numbers Come From
Prevention costs come from the training budget, the hours engineers spend on new mold design reviews and the preventive maintenance budget for presses and molds. Appraisal costs come from inspector payroll and benefits, incoming resin testing and the lab's dimensional measurement work. Internal failure costs come from scrap logs, valued at resin cost plus press time, the sorting crew's labor and maintenance records of unplanned downtime caused by mold problems. External failure costs come from customer credits and returns in the sales ledger, customers' sorting charges, the hours the quality team spends answering complaints and expedited freight to replace rejected shipments.
The Cost of Quality
Estimated annual cost of quality
| Category | Main items | Annual cost | Share of total |
|---|---|---|---|
| Prevention | Training, mold design reviews, preventive maintenance, quality planning | $315,000 | 7.5% |
| Appraisal | Nine end-of-line inspectors, incoming resin tests, lab measurement | $910,000 | 21.8% |
| Internal failure | Scrap, sorting, downtime from mold problems | $2,180,000 | 52.3% |
| External failure | Returns and credits, customer sorting charges, complaint handling, expedited freight | $765,000 | 18.3% |
| Total | $4,170,000 | 100% |
The total is about 9.1 percent of sales, and for every dollar the plant spends preventing defects, it spends about three dollars finding them and about nine dollars on failures.
A Closer Look at Scrap
Scrap is the single largest line in the table, about $1.58 million, and it is not spread evenly. Ten molds out of more than two hundred account for 58 percent of scrap value, led by the 40-cavity diagnostic housing mold on Press 23 and two multi-cavity consumer container molds. Medical-grade resin costs about three times as much per pound as the polypropylene used in consumer parts, so a defect on a medical housing costs far more than one on a storage lid. Scrap also rises at predictable times: after resin lot changes, during the first hours of night shift and in the weeks before scheduled mold maintenance. That concentration is good news, because a small number of improvement projects aimed at the right molds can capture most of the savings.
Reading the Pattern
The pattern is typical of a plant that has managed quality by inspection. Appraisal spending is substantial, but because inspectors work at the end of the line, they find defects after the resin, press time and labor have already been spent. Most failure cost is internal, which is good news compared with failures reaching customers, but the external failures that do occur are disproportionately costly because they damage relationships. The medical customer's scorecard decline followed three rejected lots and a $140,000 sorting charge in a single quarter.
What Research Suggests About Shifting Spending
Ittner (1996), studying manufacturing plants that participated in a quality cost program, found that increases in spending on prevention and appraisal were followed by reductions in nonconformance costs, and that failure costs continued to fall over time without matching increases in conformance spending, consistent with the idea that continuous improvement keeps paying back. Hendricks and Singhal (1997) set quality-award winners beside matched companies and found that the award winners showed stronger growth in operating income and sales after implementing effective quality programs. Both studies suggest that prevention is an investment rather than a cost to be minimized.
Hidden Costs Not Counted
Several costs are not in the table because they are hard to measure. Engineers spend time firefighting quality problems instead of improving processes. Production planners rebuild schedules after scrapped runs. The plant may lose bids because customers see its scorecard. And the conditional status with the medical customer puts future business at risk, which could be worth millions. The true cost of poor quality is therefore higher than $4.2 million.
Recommendations
Proposed changes for the next year
| Change | Category | Added cost or saving |
|---|---|---|
| Scientific molding training for process technicians on all shifts | Prevention | +$90,000 |
| Mold maintenance program with cavity pressure sensors on the ten highest-volume molds | Prevention | +$210,000 |
| Resin drying and moisture checks at every press | Prevention | +$60,000 |
| Statistical process control at the press, run by operators | Prevention and appraisal | +$45,000 |
| Reduce end-of-line inspection from nine inspectors to six as process control improves | Appraisal | -$190,000 |
| Expected reduction in scrap, sorting and downtime | Internal failure | -$700,000 |
| Expected reduction in returns and sorting charges | External failure | -$300,000 |
The plan adds about $405,000 in prevention and expects net savings of roughly $785,000 in the first full year, with the goal of cutting the total cost of quality from 9.1 percent of sales to about 7 percent.
Risks in the Recommendation
Shifting money from inspection to prevention carries a risk: if process control is introduced unevenly, fewer inspectors could let more defects reach customers in the transition. The plan therefore reduces inspection only press by press, after each press has run under operator control charts for eight weeks with no rise in defects found downstream. The inspectors whose positions change will move into process audit and lab roles, where their knowledge of defects is valuable, rather than being laid off, which also keeps experienced people available if problems appear.
Improving the Measurement
Starting next quarter, the accounting team will code quality costs into the four categories each month, scrap will be recorded by cause and press rather than by weight alone and complaint handling time will be logged. The cost of quality will be reported monthly to the owners alongside sales and margin.
References
Hendricks, K. B., & Singhal, V. R. (1997). Does implementing an effective TQM program actually improve operating performance? Empirical evidence from firms that have won quality awards. Management Science, 43(9), 1258-1274. https://doi.org/10.1287/mnsc.43.9.1258
Ittner, C. D. (1996). Exploratory evidence on the behavior of quality costs. Operations Research, 44(1), 114-130. https://doi.org/10.1287/opre.44.1.114
Schiffauerova, A., & Thomson, V. (2006). A review of research on cost of quality models and best practices. International Journal of Quality & Reliability Management, 23(6), 647-669. https://doi.org/10.1108/02656710610672470
What the OL 324 Module 2 instructions ask for
The Module 2 assignment in OL 324 has students estimate an organization's cost of quality and use the results to recommend changes. You will identify costs of preventing defects, appraising quality, internal failures found before delivery and external failures found by customers, estimate each from available records, total them and interpret the pattern. OL 324 cost of quality papers that score well explain where each figure comes from, include hidden costs such as downtime and expedited freight, express totals as a share of sales, compare spending across the four categories and recommend specific shifts with expected effects. They acknowledge where estimates are rough and say how measurement will improve.
How this OL 324 Module 2 cost of quality assignment example is built
The sample estimates the cost of quality at Nashoba Precision Molding, a composite injection molder in Leominster, Massachusetts, with about $46 million in sales. Prevention, including training, mold design reviews and preventive maintenance, totals about $315,000. Appraisal, mainly nine end-of-line inspectors plus incoming and lab testing, totals about $910,000. Internal failures, chiefly scrap, sorting and downtime from mold problems, total about $2.2 million, and external failures, including returns, credits and customer sorting charges, about $765,000. The total of about $4.2 million is roughly 9 percent of sales. Schiffauerova and Thomson's review, Ittner's study of quality cost behavior and Hendricks and Singhal's research on quality programs support a recommendation to shift about $400,000 a year into prevention. Scrap is broken down by mold to show where savings are concentrated.
Where the OL 324 Module 2 rubric puts the points
OL 324 cost of quality papers are typically marked on correct use of the prevention, appraisal and failure categories, credible estimates with sources, inclusion of hidden costs, analysis of the balance among categories, recommendations linked to the findings, use of research and clear tables. Standout OL 324 papers show the reader exactly how each number was built and what would change it. Papers lose marks for guessing totals without sources, counting only scrap, putting costs in the wrong category, ignoring external failures, treating appraisal as prevention or recommending more inspection as the main response to high failure costs.
OL 324 Module 2 help: the mistakes that cost points
Gather whatever records exist: scrap and rework logs, inspection labor, testing costs, maintenance spending, training budgets, warranty claims, customer credits and returns. Sort each cost into prevention, appraisal, internal failure or external failure, and note its source. Look for hidden failure costs such as machine downtime, overtime to remake orders and expedited shipping. Total each category and the whole, and express them as a share of sales. Then look at the balance: how much goes to preventing problems compared with finding and fixing them? Use research on quality costs to interpret the pattern. Recommend specific shifts in spending, with expected savings and targets for the next year. Show which few products or machines account for most of the failure cost.
Get OL 324 Module 2 written to your instructions
Share the OL 324 Module 2 directions and the records you can gather on quality costs. We sort costs into prevention, appraisal, internal failure and external failure, estimate each with stated sources, interpret the pattern with quality cost research and recommend where to shift spending, with targets. The first OL 324 cost of quality paper is free and comes to you in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 324 papers and related BS Business Administration samples
- OL 324 Module 1 Discussion: What Quality Means
- OL 324 Module 3 Milestone One: Quality Problem Analysis
- OL 324 Module 4 Discussion: Blaming Workers or Fixing the System
- OL 324 Module 5 Milestone Two: Quality Improvement Project Plan
- OL 324 Module 6 Supplier Quality Assignment: Supplier Quality and Certification
- OL 324 Module 7 Final Project: Quality Management Plan
- OL 324 Module 8 Discussion: Sustaining a Quality Culture
- QSO 435 Module 2 Backlog and Release Planning Assignment: Visitor Stories and Planning Poker
- ACC 430 Module 7 Project Two: Customer Profitability and Cost to Serve
- QSO 340 Module 2 Project Selection Case Analysis: Choosing among three food bank projects
- OL 326 Module 3 Milestone One: Social Issue Analysis
OL 324 Module 2 questions, answered
Where can I find a free OL 324 Module 2 cost of quality sample?
The complete OL 324 Module 2 paper is here: prevention, appraisal and failure costs at a composite injection molder.
What is the cost of quality?
The total cost an organization spends to prevent defects, inspect for them and deal with failures found inside the organization or by customers.
What is the prevention, appraisal and failure model?
The most widely used way to classify quality costs, sorting them into prevention, appraisal, internal failure and external failure categories.
Does spending on prevention reduce failure costs?
Research on plants in a quality cost program found that increased prevention and appraisal spending was followed by reductions in failure costs.
Do quality programs improve financial results?
Firms that implemented effective quality programs, as judged by quality awards, showed stronger growth in operating income and sales than comparable firms.