PSY 365 Module 3 Motivation Theory and Workplace Challenges Example

Reviewed by Portia Lambrick, MBA

This PSY 365 Module 3 paper takes a workplace challenge, a composite parcel depot adding weekend deliveries that drivers did not ask for, and asks what motivation research says about getting through it without losing people. SNHU PSY 365 (PSY-365) asks BA Psychology students to apply motivation theory to a real challenge, and the paper uses two theories. Self-determination theory explains what drivers need to stay motivated: autonomy, competence and relatedness. Organizational justice research shapes a fair process for assigning weekend shifts, with a table comparing the planned approach and a fairer alternative on each justice dimension. Employee participation in the rotation design is described. SMART goals for the first quarter follow in a second table, with a caution from research on goals that encourage cutting corners. The paper closes with first steps.

CoursePSY 365 Leadership and Motivation in the Workplace
ModuleModule 3
Paper typeMotivation theory and workplace challenge paper
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBA Psychology
UpdatedOctober 2026

Free sample paper for PSY 365 Module 3

1

Keeping Drivers Motivated Through the Move to Weekend Delivery

[Student Name]

Southern New Hampshire University

PSY 365: Leadership and Motivation in the Workplace

Module Three Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe title names the challenge and the outcome sought, so the theories are introduced as tools rather than as the subject.
2

Keeping Drivers Motivated Through the Move to Weekend Delivery

The Challenge

In three months, the regional carrier will add Saturday delivery at the composite central Pennsylvania depot managed by Marcus Hale. The depot's 52 drivers currently work Monday to Friday. The region's plan is to assign Saturdays by seniority, with the least senior drivers covering most of them, and to announce the schedule two weeks before launch. Drivers have heard rumors for weeks. Several newer drivers have said they will look for other jobs if they are handed every Saturday, and senior drivers worry they will be forced to cover when newer drivers quit. The change itself is not negotiable; the region has signed contracts with retailers. What can be shaped is how it is introduced, and that is where motivation research is most useful.

What Drivers Need: Self-Determination Theory

Ryan and Deci (2000) traced the quality of motivation to three basic needs: feeling that one's actions are self-chosen (autonomy), feeling capable of doing them well (competence) and feeling connected to the people around one (relatedness). When these needs are supported, people are more likely to internalize requirements they did not choose, doing them willingly rather than under pressure. When they are thwarted, motivation shifts toward compliance or withdrawal.

The region's plan threatens all three. Assigning Saturdays by seniority with two weeks' notice removes any choice, which undermines autonomy. Weekend routes will include new residential stops the drivers do not know, with no plan for training, which threatens competence. And splitting the depot into a Saturday crew of newer drivers and a weekday crew of senior drivers would divide a workforce whose strongest satisfaction, in recent conversations, is with coworkers. The change drivers cannot avoid does not have to take away the sense of choice, skill and belonging that keeps them at the depot.

What this page is doingThe theory is used to diagnose why the planned rollout would demotivate, need by need, before any solution is proposed.
3

A Fair Process: Organizational Justice

Organizational justice research separates the fairness of outcomes, of procedures and of treatment. Colquitt et al. (2001) reviewed 25 years of studies and found that procedural justice was strongly related to job satisfaction, organizational commitment and trust, while interactional justice was especially related to how people evaluate their supervisors. The implication is important for Marcus: even if Saturday work is unwelcome, drivers can accept it if the process for assigning it is fair and they are treated with respect along the way. Table 1 compares the region's plan with an alternative.

Table 1

Justice Dimensions of Two Weekend Rollout Plans

Justice dimensionRegion's planProposed alternative
Distributive (outcomes)Newest drivers cover most SaturdaysRotation so every driver works about one Saturday in four; premium pay stays with the shift
Procedural (process)Seniority rule set by region; no inputDriver committee helps design the rotation; clear swap rules; decisions applied consistently
Informational (explanation)Schedule posted two weeks before launchReasons explained now; draft rotation shared six weeks ahead for comment
Interpersonal (respect)Announced by memoMarcus explains in person at load-out and answers questions

Note. Composite comparison prepared for the depot manager.

Employee Participation

The committee is the key element. Five drivers, elected by the drivers and including both senior and newer drivers, would work with Marcus to design the rotation within limits the region sets: every Saturday route must be covered, and costs must stay within budget. The committee could decide how swaps work, whether drivers can volunteer for extra Saturdays in exchange for a weekday off and how holidays are handled. Participation of this kind supports autonomy even though the change itself was imposed, and it gives drivers a voice in the process, one of the conditions that makes procedures feel fair. It also brings practical knowledge Marcus lacks, since drivers know which personal commitments make certain Saturdays impossible.

SMART Goals for the First Quarter

Goals give the change a direction drivers can see. Locke and Latham (2002) reviewed decades of studies in which a clear, challenging target beat an open instruction to "do your best" on performance, as long as people are committed to the goals and receive feedback. Table 2 sets goals written to the SMART standard, each one precise, countable, realistic, tied to the change and dated.

Table 2

SMART Goals for the Weekend Delivery Launch

AimHow it is countedTarget and date
Launch Saturday service on timeSaturday routes departing by 8:30 a.m.95% in the first 12 Saturdays
Prepare drivers for new stopsDrivers completing a paid ride-along on a weekend routeAll 52 before their first Saturday
Keep the team togetherVoluntary driver resignationsNo more than 2 in the first quarter
Keep the process fairDriver survey item: the Saturday schedule is fairAt least 70% agree at 90 days

Note. Composite goals. Progress posted weekly at the depot.

A Caution About the Goals

Goals can also backfire. In laboratory experiments, Schweitzer et al. (2004) found that people given specific goals were more likely than those told to do their best to overstate their performance, especially when they had fallen just short of the target, and narrow targets can also draw attention away from whatever is not measured. A Saturday departure target could tempt drivers to skip pre-trip vehicle inspections, and a resignation target could tempt a manager to pressure drivers not to leave rather than making the depot a place they want to stay. For that reason, the departure goal will be reviewed alongside inspection completion rates, and the resignation goal will be read together with the fairness survey. The goals are signals for Marcus and the committee to discuss, not quotas to be met at any cost.

Why This Approach Should Work

The approach supports each basic need: the committee and swap rules give drivers choice within a fixed requirement, the ride-alongs build competence before it is tested, and the shared rotation keeps the depot one team. It applies all four forms of justice at little cost. And the goals turn an unwelcome change into a shared project with visible progress. The one real cost is time: the committee needs about four weeks, which is why it must start now rather than after the region finalizes the schedule.

First Steps

This week, Marcus should ask the region for authority to design the rotation locally within its coverage and budget limits, explain the change and the reasons for it to drivers in person, and call for committee nominations. The draft rotation should be shared six weeks before launch, and the first weekly progress posting should appear the week Saturday service begins.

References

Colquitt, J. A., Conlon, D. E., Wesson, M. J., Porter, C. O. L. H., & Ng, K. Y. (2001). Justice at the millennium: A meta-analytic review of 25 years of organizational justice research. Journal of Applied Psychology, 86(3), 425-445. https://doi.org/10.1037/0021-9010.86.3.425

Locke, E. A., & Latham, G. P. (2002). Building a practically useful theory of goal setting and task motivation: A 35-year odyssey. American Psychologist, 57(9), 705-717. https://doi.org/10.1037/0003-066X.57.9.705

Ryan, R. M., & Deci, E. L. (2000). Self-determination theory and the facilitation of intrinsic motivation, social development, and well-being. American Psychologist, 55(1), 68-78. https://doi.org/10.1037/0003-066X.55.1.68

Schweitzer, M. E., Ordóñez, L., & Douma, B. (2004). Goal setting as a motivator of unethical behavior. Academy of Management Journal, 47(3), 422-432. https://doi.org/10.2307/20159591

What the PSY 365 Module 3 instructions ask for

The Module 3 assignment in PSY 365 applies motivation theory to a workplace challenge. The guidelines want the challenge described, one or more theories applied to explain it, a plan that uses the theories and goals that make the plan measurable. Choose a challenge with real motivational stakes, such as a schedule change or new targets. Use the theory to diagnose the problem before proposing solutions. Self-determination theory and organizational justice pair well, since one explains needs and the other explains process. Write goals in SMART form and consider their risks. Expect roughly three APA 7 pages built on journal sources. Schweitzer and colleagues' study on goals and unethical behavior adds depth to the goals section. The PSY 365 Module 3 guidelines list required elements and sources.

How this PSY 365 Module 3 motivation theory and workplace challenges example is built

The challenge section describes the depot's plan to start Saturday delivery with assigned shifts and no input from drivers. The self-determination section explains, need by need, why the plan threatens autonomy, competence on new routes and relatedness with families. The justice section uses a table to compare the planned approach and a fairer alternative on distributive, procedural, interpersonal and informational justice. The participation section describes a driver committee that designs the rotation. A SMART goals table sets first-quarter targets for on-time delivery, voluntary swaps and turnover. The caution section explains that tight targets can push people to cut corners, citing Schweitzer and colleagues. The rationale section explains why the approach should work. First steps for the manager's first week close the paper.

Where the PSY 365 Module 3 rubric puts the points

PSY 365 grades the Module 3 paper on the challenge, the application of theory, the plan, the goals and the writing, with SNHU's four levels set against each criterion. Application earns the highest marks when the theory diagnoses the problem, need by need or dimension by dimension, before any solution appears. The plan scores well when each element connects to a theory. SMART goals earn credit when they are specific, measured and dated. Noting a risk of goals, such as cutting corners, shows critical thinking. Two well-used theories outscore four described briefly. The writing row covers the two tables, APA references and headings. A plan the manager could start in the first week shows the practical aim of the PSY 365 assignment.

PSY 365 Module 3 help: the mistakes that cost points

Motivation papers often describe self-determination theory in general terms and never apply its three needs to the people in the case. Proposing solutions before diagnosing the problem leaves the theory as decoration. Listing all four justice dimensions without saying which one the plan violates misses the point of the framework. Goals such as improve morale cannot be measured. Use one table to compare the planned and fairer approaches. Give drivers a real role in the design. Add a caution about targets. End with first steps, because a PSY 365 grader wants to see the theories turned into actions a manager could take next Monday, and a paper that stops at the analysis leaves the assignment half finished.

Get PSY 365 Module 3 written to your instructions

Send your PSY 365 Module 3 instructions and rubric with the workplace challenge you are addressing. A paper applying motivation theory to that challenge comes back within 24 to 48 hours; the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More PSY 365 papers and related BA Psychology samples

PSY 365 Module 3 questions, answered

What does the PSY 365 Module 3 assignment involve?

Students in the third module are usually asked to apply motivation theories to a workplace challenge, often considering fairness, employee participation and goal setting, including goals that meet SMART criteria.

What does self-determination theory say about motivation?

It proposes that people are most motivated, and most likely to internalize goals set by others, when three basic psychological needs are supported: autonomy, a sense of choice; competence, a sense of effectiveness; and relatedness, a sense of connection with others.

What are the types of organizational justice?

Distributive justice concerns the fairness of outcomes, procedural justice the fairness of the process used to reach them, and interactional justice the respect and honesty with which people are treated and informed. Each shapes different reactions at work.

Where can I find a free PSY 365 Module 3 sample paper?

The full paper is above: self-determination theory and organizational justice applied to an unpopular move to weekend delivery, with a fairer rotation design, driver input and SMART goals. Use it as a model.

Can goals encourage unethical behavior?

Yes. Schweitzer, Ordóñez and Douma found in 2004 that people with specific goals they had not met were more likely to overstate their performance, especially when they were close to the goal. Goal design should guard against that risk.