| Course | PSY 365 Leadership and Motivation in the Workplace |
|---|---|
| Module | Module 7 |
| Paper type | Power, influence and ethics analysis |
| Length | About 1,130 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BA Psychology |
| Updated | October 2026 |
Free sample paper for PSY 365 Module 7
Power, Pressure and a Scanning Shortcut: An Analysis of Influence at a Parcel Depot
[Student Name]
Southern New Hampshire University
PSY 365: Leadership and Motivation in the Workplace
Module Seven Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Power, Pressure and a Scanning Shortcut: An Analysis of Influence at a Parcel Depot
The Situation
Saturday delivery had been running for six weeks at Marcus Hale's depot, a composite operation in central Pennsylvania, when the regional office sent a message to all depot managers: Saturday on-time performance across the region was below the 95 percent target, and depots under 90 percent would be reviewed. Marcus's depot was at 88 percent, mostly because new residential routes produce more missed deliveries. In a planning meeting, a senior dispatcher pointed out that some depots were having drivers scan difficult packages as "customer not available" at the start of a route and return them unattempted, which counts as a timely exception rather than a late delivery. The dispatcher did not recommend it but said, "That's how the others are getting to 95." The situation involves power, influence and ethics at once, and this paper examines each.
Marcus's Power
French and Raven (1959) described five bases of social power. Table 1 applies them to Marcus and notes how each has shifted since his promotion.
Table 1
Marcus Hale's Bases of Power
| Base of power | Source for Marcus | Change since promotion |
|---|---|---|
| Legitimate | Formal authority as depot manager | Gained |
| Reward | Route assignments, overtime, recommendations for raises | Gained, but limited by regional pay rules |
| Coercive | Discipline for policy violations | Gained; rarely used |
| Expert | Six years as the depot's top driver; route knowledge | Retained; widely respected |
| Referent | Drivers' identification with and respect for him | Declined, especially among former peers |
Note. Composite analysis based on interviews and observation.
What the Power Profile Means
Marcus's position gives him legitimate, reward and coercive power, which he gained all at once when promoted. His expert power predates the promotion and remains strong: drivers say no one knows the routes better. His referent power has declined as he has distanced himself from his former peers. The pattern matters because the personal bases, expert and referent, are generally associated with commitment, while the positional bases are associated more with compliance. In the current situation, Marcus's strongest asset for leading drivers through Saturday problems is his expertise; his weakest is the goodwill that would lead drivers to go beyond compliance when the work is hard.
Influence Tactics in Play
Influence is flowing in two directions. The regional office is influencing Marcus with what Yukl and Tracey (1992) would classify as pressure and legitimating tactics: a target, a deadline and an implied threat of review, backed by the office's authority. In their study of managers' influence attempts, those tactics were among the least likely to produce commitment, while rational persuasion, inspirational appeals and consultation were the most effective. The research predicts what is happening across the region: managers complying with the number rather than committing to the underlying goal of reliable Saturday service, and in some depots finding ways to meet the number without improving the service.
Marcus, in turn, must influence his drivers. If he passes the regional pressure straight down, he would be using the same low-commitment tactics on drivers whose goodwill is already thin. The alternatives research favors are available to him: rational persuasion, using route data to show where misses cluster; consultation, asking drivers on the new routes what would reduce misses; and an inspirational appeal to the pride experienced drivers take in delivering what others cannot. These tactics draw on his expert power, which is his strongest base.
The Ethical Pressure
The scanning shortcut illustrates how ethical pressure arises in ordinary organizations. No one has instructed anyone to misreport. A target with consequences, a measurement system that counts an exception as on time and the example of peers together create a path of least resistance. Marking a package "customer not available" without attempting delivery would record something false and shift the cost to customers, who wait an extra day, and to Monday drivers, who carry the backlog. The pressure does not come from bad people; it comes from a number that can be met more easily by changing the record than by changing the work.
Brown et al. (2005) described the ethical leader as someone who models proper conduct in how they act and treat people, and who spreads that conduct to others by talking it through with them, rewarding and correcting it and making decisions by it. In their studies, followers' ratings of ethical leadership were related to perceptions of the leader's honesty and fairness, to satisfaction with the leader and to whether followers were willing to tell managers about problems. The last finding is particularly relevant. Whatever Marcus decides will be watched by the dispatcher who raised the shortcut and by drivers who will hear about it. His choice will teach the depot whether problems are to be solved or hidden, and it will affect whether people bring him bad news in the future.
Analysis of the Options
Marcus has three broad courses available. Using the shortcut would likely raise the reported rate above 90 percent quickly, avoiding review, at the cost of false records, customer harm and a lesson to staff that numbers matter more than accuracy. Passing the pressure to drivers through targets and warnings would keep the records honest but, based on the influence research, would likely produce compliance at best and more departures at worst. Reporting the real rate to the region with an explanation of why residential routes miss more often, a plan built with drivers to reduce misses and a request for a realistic ramp-up period would use rational persuasion upward and consultation downward. It carries the risk of a review, but it aligns his conduct with what the ethical leadership research suggests builds trust and candor.
The analysis also points beyond Marcus. The regional measurement system rewards the shortcut, and as long as it does, some depots will use it. A leader's individual ethics matter, but the design of targets and measures shapes how often individuals face this kind of pressure in the first place.
What the Case Shows About Power and Ethics Together
Taken together, the three lenses explain one another. The regional office has only positional power over depot managers, so it relies on pressure; pressure produces compliance with the number; and a number that can be met by changing the record creates the ethical pressure point. At the depot level, Marcus's own power profile shapes his choices. Because his referent power is weak, passing pressure downward is tempting, since it requires no goodwill. Because his expert power is strong, he has a credible basis for explaining the real causes of missed deliveries to the region and for leading drivers through them. How a leader uses power in a moment like this also changes the power itself: an honest, consultative response could rebuild the referent power he has lost, while a shortcut, once known, would likely erode the expert respect he still holds.
References
Brown, M. E., TreviƱo, L. K., & Harrison, D. A. (2005). Ethical leadership: A social learning perspective for construct development and testing. Organizational Behavior and Human Decision Processes, 97(2), 117-134. https://doi.org/10.1016/j.obhdp.2005.03.002
French, J. R. P., Jr., & Raven, B. (1959). The bases of social power. In D. Cartwright (Ed.), Studies in social power (pp. 150-167). University of Michigan, Institute for Social Research.
Yukl, G., & Tracey, J. B. (1992). Consequences of influence tactics used with subordinates, peers, and the boss. Journal of Applied Psychology, 77(4), 525-535. https://doi.org/10.1037/0021-9010.77.4.525
What the PSY 365 Module 7 instructions ask for
The Module 7 assignment in PSY 365 asks you to analyze power, influence and ethics in a workplace situation. The guidelines want the situation described, the leader's power bases identified, influence tactics analyzed and an ethical issue examined with research. Describe the situation neutrally before analyzing it. French and Raven's bases of power remain the standard framework, and Yukl's research on influence tactics shows which ones build commitment. Analyze influence in both directions, from above and from the leader to followers. Ethical leadership research, such as Brown and colleagues' social learning view, explains how leaders' conduct shapes followers' conduct. Three APA 7 pages with peer-reviewed sources is typical. Check the PSY 365 Module 7 guidelines for whether a recommendation is required.
How this PSY 365 Module 7 power, influence and ethics analysis example is built
The situation section describes the regional target, the dispatcher's shortcut of scanning packages as attempted before drivers reach the door and the manager's decision. The power section uses a table to map legitimate, reward, coercive, expert and referent power, noting that his expert power as a former top driver is strong while referent power with former peers has weakened. The interpretation section explains what that profile means for influence. The influence section compares the region's pressure tactics with rational persuasion and consultation, citing Yukl and Tracey's finding that pressure produces compliance at best. The ethics section explains why the shortcut is tempting and how followers learn from what leaders tolerate. The options section analyzes three responses, and a section on power and ethics together closes.
Where the PSY 365 Module 7 rubric puts the points
PSY 365 scores the Module 7 paper on the situation, the power analysis, the influence analysis, the ethical analysis and the writing, every row placed on SNHU's four levels. The power row earns the highest marks when each base is applied to the leader with evidence, including how it has changed. Influence scores well when tactics are analyzed in both directions and compared with research on outcomes. The ethics row rewards research that explains why the pressure arises rather than a statement that cheating is wrong. Analyzing options, not just stating rules, shows judgment. A neutral description of the situation helps the analysis feel fair. The writing row covers the table, headings and APA citations that complete the PSY 365 paper.
PSY 365 Module 7 help: the mistakes that cost points
Power and ethics papers often list French and Raven's five bases with definitions and never apply them. Analyzing only the leader's influence on followers misses the pressure coming from above, which is often where the ethical problem starts. Treating the ethical issue as obvious, with no research on why people cut corners, weakens the analysis. Moralizing in place of analysis is a common slip. Put the power profile in a table. Use research on influence outcomes. Describe the shortcut neutrally. Analyze the options, because a PSY 365 grader wants to see how power, influence and ethics interact in one decision, and a paper that weighs each response by its likely effect on drivers shows that understanding best.
Get PSY 365 Module 7 written to your instructions
Send your PSY 365 Module 7 instructions and grading rubric together with the case you are analyzing. A paper on power, influence and ethical pressure in that setting comes back within 24 to 48 hours, and the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More PSY 365 papers and related BA Psychology samples
- PSY 365 Module 1 Leadership Versus Management Discussion: A well-run depot drivers keep leaving
- PSY 365 Module 2 Trait and Behavioral Leadership Analysis: Traits and behaviors of one depot manager
- PSY 365 Module 3 Motivation Theory and Workplace Challenges: Keeping drivers motivated through weekend delivery
- PSY 365 Module 4 Project One Leadership and Motivation Analysis: Leadership and motivation analysis of a depot
- PSY 365 Module 5 Contingency Leadership Memo: Leading differently in different situations
- PSY 365 Module 6 Goals, Rewards and Engagement Discussion: Goals and rewards for first-attempt delivery
- PSY 365 Module 8 Final Project Motivation Plan: A motivation plan that starts Monday
- FIN 460 Module 2 Property and Probate Assignment: How Each Lindqvist Asset Would Pass Today
- SPT 465 Module 8 Discussion: The Plastic a Sport Leaves in Forests
- ACC 421 Module 1 Discussion: Skepticism and the Auditor's Job
- ACC 405 Module 3 Equity Method Assignment: A 30 Percent Stake in a Maple Drinks Startup
PSY 365 Module 7 questions, answered
What does PSY 365 Module 7 cover?
Module 7 commonly addresses power, influence and ethics in leadership: the sources of a leader's power, the tactics leaders use to influence others and how ethical pressures arise and are handled in organizations.
What are French and Raven's bases of power?
They are legitimate power from a formal position, reward power from control over rewards, coercive power from the ability to punish, expert power from knowledge and skill and referent power from others' identification with and respect for the leader.
Which influence tactics work best?
Research on influence attempts has found that rational persuasion, inspirational appeals and consultation tend to produce commitment more often, while pressure and appeals to authority tend to produce compliance or resistance.
Where can I find a free PSY 365 Module 7 sample paper?
The full paper is above: a depot manager's power bases, the influence tactics used on and by him and the ethical pressure of a scanning shortcut, analyzed with French and Raven, Yukl and ethical leadership research. Use it as a model.
What is referent power?
Referent power comes from followers' respect, liking and identification with a leader. It is one of French and Raven's five bases, and unlike legitimate or coercive power, it depends on the relationship rather than the job title.