| Course | PSY 365 Leadership and Motivation in the Workplace |
|---|---|
| Module | Module 6 |
| Paper type | Goals, rewards and engagement discussion post |
| Length | About 360 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BA Psychology |
| Updated | October 2026 |
Free sample paper for PSY 365 Module 6
Module Six Discussion: Goals, Rewards and Engagement
Re: Start with the number: first-attempt delivery
The metric: first-attempt delivery rate, the share of packages delivered on the driver's first stop without a missed-delivery notice. At the composite parcel depot I have been using this term, it is 91.5 percent. Every miss means a second trip, a frustrated customer and a longer day for someone.
The goal: 94 percent within 90 days, tracked weekly. Locke and Latham (2002) found that specific, challenging goals outperform vague ones when people are committed and receive feedback, so the depot will post the weekly rate by route group, not by individual, and drivers will help choose the tactics, such as calling customers with gate codes or adjusting stop order around business hours.
The reward: a team reward, not individual bonuses. If the depot reaches 94 percent for four straight weeks, every driver gets a paid half day. Individual bonuses would tempt drivers to mark hard deliveries as attempted when they were not, and would pit drivers against each other over easy routes. A shared reward keeps attention on the depot's number and on helping one another.
Why intrinsic motivation still matters: first-attempt delivery depends on judgment, noticing a side entrance, remembering which customer works nights. Cerasoli et al. (2014) found in a 40-year meta-analysis that intrinsic motivation and extrinsic incentives jointly predicted performance, with intrinsic motivation more strongly related to the quality of performance and incentives to its quantity. The half day can make drivers pay attention to the number; only pride in the route will make them care about the customer behind it. So the manager should share customer compliments by name at load-out as well as posting the rate.
Why engagement is the larger aim: Harter et al. (2002) found across thousands of business units that employee engagement was related to customer satisfaction, productivity, profitability and turnover. If the goal and reward build a sense that drivers own the depot's performance, the gains should reach retention too, which this depot needs more than any single metric.
Question for classmates: what single metric in your workplace would you set a team goal around, and what could go wrong if the reward were individual?
References
Cerasoli, C. P., Nicklin, J. M., & Ford, M. T. (2014). Intrinsic motivation and extrinsic incentives jointly predict performance: A 40-year meta-analysis. Psychological Bulletin, 140(4), 980-1008. https://doi.org/10.1037/a0035661
Harter, J. K., Schmidt, F. L., & Hayes, T. L. (2002). Business-unit-level relationship between employee satisfaction, employee engagement, and business outcomes: A meta-analysis. Journal of Applied Psychology, 87(2), 268-279. https://doi.org/10.1037/0021-9010.87.2.268
Locke, E. A., & Latham, G. P. (2002). Building a practically useful theory of goal setting and task motivation: A 35-year odyssey. American Psychologist, 57(9), 705-717. https://doi.org/10.1037/0003-066X.57.9.705
What the PSY 365 Module 6 instructions ask for
The Module 6 discussion in PSY 365 asks you to apply research on goals, rewards and engagement to improve performance. The prompt rewards applied answers, so name one performance measure and its current level in your opening sentence. Set a goal using goal setting research, design a reward and explain how intrinsic motivation fits. Avoid rewards that create side effects, such as individual bonuses that pit coworkers against each other. Cite Locke and Latham and at least one study on incentives or engagement in APA 7. Because the limit is near four hundred words, keep every recommendation tied to the one metric. Replies come later in the module and should test a classmate's reward design or suggest a metric that suits the approach better.
How this PSY 365 Module 6 goals, rewards and engagement discussion example is built
The first sentence names the metric, first-attempt delivery, and its current rate of 91 percent. The goal paragraph sets a target of 95 percent within a quarter and explains why a specific, difficult goal outperforms do your best, citing Locke and Latham. The reward paragraph designs a team reward, a monthly lunch and shift choice when the depot hits the target, rather than individual bonuses that could push drivers to mark packages delivered falsely. The intrinsic motivation paragraph cites Cerasoli and colleagues' finding that intrinsic motivation predicts quality while incentives predict quantity. The engagement paragraph links engaged teams to better results, citing Harter and colleagues. The closing question asks classmates which metric at their workplace would suit the same approach.
Where the PSY 365 Module 6 rubric puts the points
PSY 365 grades the Module 6 discussion on the opening post, the replies, posting on schedule and writing, with SNHU's four levels applied in Brightspace to each one. The opening post earns full credit when it names a metric first, sets a goal from research, designs a reward that avoids side effects and explains the role of intrinsic motivation. Recommendations should stay tied to the one metric. Replies earn credit when they test a reward design or offer a better metric. The writing score includes APA citation and keeping close to the length set. PSY 365 instructors often favor posts that discuss the risks of incentives, since the research shows both benefits and costs, and a post that only praises bonuses misses half the evidence.
PSY 365 Module 6 help: the mistakes that cost points
Goal and reward posts often discuss motivation in general and never name what will be measured. Recommending individual cash bonuses without considering cheating or rivalry ignores research on incentives. Treating intrinsic motivation and rewards as opposites, when studies show they work together, oversimplifies the topic. Engagement mentioned with no link to results reads as a buzzword. Name the metric and its current value first. Set one goal and one reward. Cite the meta-analysis on incentives. Ask classmates about their own metrics, because a PSY 365 thread where peers name the numbers their workplaces track gives everyone real cases for testing goal setting and reward design in the replies.
Get PSY 365 Module 6 written to your instructions
Send us the PSY 365 Module 6 discussion prompt and grading rubric, and a reply on goals, rewards and engagement that starts from a named metric comes back within 24 to 48 hours; the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More PSY 365 papers and related BA Psychology samples
- PSY 365 Module 1 Leadership Versus Management Discussion: A well-run depot drivers keep leaving
- PSY 365 Module 2 Trait and Behavioral Leadership Analysis: Traits and behaviors of one depot manager
- PSY 365 Module 3 Motivation Theory and Workplace Challenges: Keeping drivers motivated through weekend delivery
- PSY 365 Module 4 Project One Leadership and Motivation Analysis: Leadership and motivation analysis of a depot
- PSY 365 Module 5 Contingency Leadership Memo: Leading differently in different situations
- PSY 365 Module 7 Power, Influence and Ethics Analysis: Power, pressure and a scanning shortcut
- PSY 365 Module 8 Final Project Motivation Plan: A motivation plan that starts Monday
- FIN 335 Module 6 Discussion: Should Trust Clients Simply Index?
- FIN 355 Module 7 Final Project: The Haskells' Insurance Plan
- MKT 270 Module 4 Discussion: We Already Have a Towel Guy
- FIN 250 Module 2 Financial Statements Assignment: A Net Worth Just Below Zero
PSY 365 Module 6 questions, answered
What does PSY 365 Module 6 focus on?
The sixth module commonly deals with applying motivation in practice: goal setting, reward systems and employee engagement, with discussions asking how these could improve performance in a specific workplace.
Do incentives undermine intrinsic motivation?
Not necessarily. A 40-year meta-analysis found that intrinsic motivation and extrinsic incentives both predicted performance, with intrinsic motivation more closely tied to the quality of work and incentives to its quantity. How incentives are designed matters.
Is employee engagement linked to business results?
Research across many business units found that units with higher employee engagement tended to have better outcomes such as customer satisfaction, productivity, profitability and lower turnover, although causation runs in both directions.
Where can I find a free PSY 365 Module 6 discussion sample?
The complete post is above: a depot's first-attempt delivery rate as the metric, with a goal from goal setting theory, a team reward, intrinsic motivation research and engagement. Use it as a model.
Why use a team reward instead of individual bonuses?
Team rewards encourage cooperation and reduce the temptation to compete or game the numbers. Individual bonuses can raise effort but may push people to cut corners or hide problems, which research on incentives warns about.