| Course | PSY 365 Leadership and Motivation in the Workplace |
|---|---|
| Module | Module 8 |
| Paper type | Final project motivation plan |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BA Psychology |
| Updated | October 2026 |
Free sample paper for PSY 365 Module 8
Starting Monday: A Motivation and Leadership Plan for the Depot
[Student Name]
Southern New Hampshire University
PSY 365: Leadership and Motivation in the Workplace
Module Eight Final Project
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Starting Monday: A Motivation and Leadership Plan for the Depot
Where the Depot Stands
Marcus Hale has managed the composite central Pennsylvania parcel depot for about ten months. The work this term found a manager strong in structure and expertise and weak in consideration and visible presence; an exchange quality survey in which his former peers, the most experienced drivers, felt furthest from him; a Saturday delivery launch that threatened drivers' sense of choice and fairness; recognition that was rare and impersonal; and regional targets that created pressure to improve numbers rather than service. Turnover among drivers is the depot's most costly problem. This plan addresses those findings with actions Marcus can take himself, most of them within his current authority and budget.
The Leadership Approach
Marcus will lead primarily as a servant leader, asking what drivers need to do their routes well and removing obstacles, while matching his behavior to the situation: direction on new routes, support in heavy weeks and consultation on familiar work. Eva et al. (2019) describe servant leadership as centered on followers' growth and needs, and it suits a reserved, practical manager because it is expressed through acts rather than speeches. It also speaks directly to the former peers, who want evidence that their old colleague still works for them.
The Weekly Routine
Table 1 sets out what Marcus will do each week. It is designed to take about four hours beyond his current schedule, most of it at times drivers are already at the depot.
Table 1
Marcus Hale's Weekly Leadership Routine
| Day | Action | Purpose |
|---|---|---|
| Monday | At load-out, share last week's first-attempt rate and one named customer compliment | Feedback and recognition |
| Tuesday | Ride along for two hours with one driver, rotating through all drivers | Presence; learning route problems |
| Wednesday | Fifteen-minute one-on-ones with two former-peer drivers | Rebuild exchange quality |
| Thursday | Meet the driver committee on Saturday rotation and swaps | Fair process; voice |
| Friday | Review route obstacles raised during the week and report what was fixed | Servant leadership in practice |
| Saturday | Present at weekend load-out at least twice a month | Shared burden; support |
Note. Composite plan.
Fairness in the Saturday Rotation
The driver committee already designing the Saturday rotation will continue as a standing group, with membership rotating every six months. Saturdays fall to each driver roughly once a month, swaps follow published rules and any exception Marcus grants is explained to the committee. Colquitt et al. (2001) found that fair procedures were strongly related to satisfaction, commitment and trust, which matters here because drivers cannot avoid Saturdays but can be treated fairly in how they are assigned. The committee also meets the self-determination need for autonomy, since drivers shape how an unwelcome requirement is carried out (Ryan & Deci, 2000).
Recognition That Drivers Notice
Recognition will move from email to the dock. Each Monday, Marcus will read one customer compliment by the driver's name and describe the specific action behind it, such as finding a side entrance or leaving a package with a neighbor the customer had named. Recognition that names the behavior tells drivers what good work looks like and acknowledges competence, another basic need in self-determination theory. Once a month, drivers will nominate a colleague who helped them, and Marcus will recognize that driver at load-out.
A Team Goal
The depot's shared goal is to raise first-attempt delivery from 91.5 to 94 percent within 90 days, posted weekly by route group. Specific and challenging goals raise performance when people accept them and get feedback (Locke & Latham, 2002), so drivers will choose the tactics, and the reward will be collective: a paid half day for everyone after four consecutive weeks at target. A team reward avoids pitting drivers against each other and reduces the temptation to misrecord difficult deliveries.
Roles for Experienced Drivers
The former peers are the depot's most valuable and least connected drivers. The plan creates two roles open to drivers with at least three years' service: route mentor, who leads ride-alongs for new drivers and for anyone learning a Saturday route, and route advisor, who works with Marcus on stop sequencing when routes are rebalanced. Both roles use their expertise, give them influence over decisions that affect them and build the kind of high-quality exchange that Gerstner and Day (1997) found associated with satisfaction, commitment and lower turnover intentions. The drivers who feel left behind by Marcus's promotion are the ones best placed to carry the depot through its next change.
An Honest Reporting Line
Marcus will report Saturday performance to the region as it is, without exception scans on unattempted packages, and will send each month a short note explaining where misses occur and what the depot is doing about them. He will tell drivers he is doing this. The commitment protects customers and the depot's records, and it tells drivers that problems are to be raised and solved. If the region reviews the depot, the notes provide the evidence of a credible improvement plan.
The 90-Day Scorecard
Table 2 lists the measures Marcus and his HR business partner will review at 90 days.
Table 2
Measures and Targets for the First 90 Days
| Measure | Baseline | 90-day target |
|---|---|---|
| Driver voluntary resignations | 3 in the past 8 months | No more than 1 |
| Exchange quality, former peers (1 to 5) | 2.6 | 3.2 or higher |
| First-attempt delivery rate | 91.5% | 94% |
| Saturday on-time rate, honestly reported | 88% | 92% or higher |
| Drivers agreeing the Saturday schedule is fair | Not measured | 70% or higher |
| Weekly routine completed as planned | Not applicable | At least 80% of scheduled actions |
Note. Composite baselines from earlier surveys and depot records.
Why This Plan Should Work
Each element answers a specific finding, and together they shift how drivers experience the depot: from a place run by posted numbers to a place where the manager is present, decisions are fair, good work is seen and experienced people have a role. Harter et al. (2002) found that business units with more engaged employees tended to show better customer satisfaction, productivity and retention, and the plan's measures are chosen to show whether that pattern appears here. If the scorecard shows little change at 90 days, the routine completion rate will show whether the plan failed or was never fully carried out, which is the first question to answer before changing it.
References
Colquitt, J. A., Conlon, D. E., Wesson, M. J., Porter, C. O. L. H., & Ng, K. Y. (2001). Justice at the millennium: A meta-analytic review of 25 years of organizational justice research. Journal of Applied Psychology, 86(3), 425-445. https://doi.org/10.1037/0021-9010.86.3.425
Eva, N., Robin, M., Sendjaya, S., van Dierendonck, D., & Liden, R. C. (2019). Servant leadership: A systematic review and call for future research. The Leadership Quarterly, 30(1), 111-132. https://doi.org/10.1016/j.leaqua.2018.07.004
Gerstner, C. R., & Day, D. V. (1997). Meta-analytic review of leader-member exchange theory: Correlates and construct issues. Journal of Applied Psychology, 82(6), 827-844. https://doi.org/10.1037/0021-9010.82.6.827
Harter, J. K., Schmidt, F. L., & Hayes, T. L. (2002). Business-unit-level relationship between employee satisfaction, employee engagement, and business outcomes: A meta-analysis. Journal of Applied Psychology, 87(2), 268-279. https://doi.org/10.1037/0021-9010.87.2.268
Locke, E. A., & Latham, G. P. (2002). Building a practically useful theory of goal setting and task motivation: A 35-year odyssey. American Psychologist, 57(9), 705-717. https://doi.org/10.1037/0003-066X.57.9.705
Ryan, R. M., & Deci, E. L. (2000). Self-determination theory and the facilitation of intrinsic motivation, social development, and well-being. American Psychologist, 55(1), 68-78. https://doi.org/10.1037/0003-066X.55.1.68
What the PSY 365 Module 8 instructions ask for
The final project in PSY 365 is a motivation and leadership plan for the workplace analyzed during the course. The guidelines want the current situation summarized, a leadership approach, specific practices, a way to measure results and research behind each element. Start from the diagnosis in Project One so each practice has a reason. Be specific enough that the leader could start the plan next week; a weekly routine in a table helps. Tie each practice to a theory from the course, such as justice, self-determination or goal setting. Include a scorecard with measures and targets. The plan runs about four APA 7 pages with scholarly sources. Check the PSY 365 final project rubric for required elements, since a few sections add a brief slide summary for leaders.
How this PSY 365 Module 8 final project motivation plan example is built
The opening section restates the findings: weak exchange with former peers, an unfair Saturday rotation and pressure to cut corners. The leadership approach section commits Marcus to a servant leadership direction with clear structure. A weekly routine table sets a Monday huddle, Tuesday one-on-ones, a Thursday route review and Friday recognition. The fairness section describes a published rotation with swaps. The recognition section explains specific, timely praise. The team goal section sets a first-attempt delivery target. The experienced drivers section gives former peers roles as route trainers, turning the most distant group into a resource. The reporting section commits to honest scans and backing drivers who refuse shortcuts. A 90-day scorecard lists turnover, exchange scores, swaps and delivery rate, and a rationale closes the plan.
Where the PSY 365 Module 8 rubric puts the points
PSY 365 grades the final project on the diagnosis, the leadership approach, the practices, the research support, the scorecard and the writing, and each of those rows is marked at one of SNHU's four levels. Practices earn the highest marks when they are specific enough to start immediately and tied to named theories. The diagnosis row rewards a clear link to the earlier analyses. The research row looks for evidence behind each practice, not only a reference list. A scorecard scores well when measures and targets match the problems identified. Including an ethical commitment shows the plan addresses the whole course. The writing row covers the table, headings and APA citations. A plan a manager could print and use is the standard the PSY 365 final project sets.
PSY 365 Module 8 help: the mistakes that cost points
Final motivation plans often list good intentions, such as communicate better, without saying when or how. Proposing practices with no link to the diagnosis makes the plan feel generic. Citing theories in a list at the end, rather than beside the practice each one supports, weakens the research row. Skipping measures leaves no way to judge success at ninety days. Use a weekly routine table. Tie each practice to a theory in the same paragraph. Turn a problem group into a resource where you can. Include a scorecard, because a PSY 365 grader wants to see a plan that can be tested, and measures such as turnover and exchange scores let the manager decide at ninety days what to keep and what to change.
Get PSY 365 Module 8 written to your instructions
Send the PSY 365 Project Two guidelines and rubric, plus your Project One and instructor comments. A motivation plan a supervisor could act on comes back within 24 to 48 hours; the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More PSY 365 papers and related BA Psychology samples
- PSY 365 Module 1 Leadership Versus Management Discussion: A well-run depot drivers keep leaving
- PSY 365 Module 2 Trait and Behavioral Leadership Analysis: Traits and behaviors of one depot manager
- PSY 365 Module 3 Motivation Theory and Workplace Challenges: Keeping drivers motivated through weekend delivery
- PSY 365 Module 4 Project One Leadership and Motivation Analysis: Leadership and motivation analysis of a depot
- PSY 365 Module 5 Contingency Leadership Memo: Leading differently in different situations
- PSY 365 Module 6 Goals, Rewards and Engagement Discussion: Goals and rewards for first-attempt delivery
- PSY 365 Module 7 Power, Influence and Ethics Analysis: Power, pressure and a scanning shortcut
- INT 400 Module 2 Project Proposal: Scope, Method and Timeline
- INT 221 Module 4 Discussion: What a Euro Wire Really Costs
- OL 322 Module 5 Milestone Two: Change and Communication Plan
- ACC 430 Module 1 Discussion: Turning "Margins Are Down" Into a Question
PSY 365 Module 8 questions, answered
What does the PSY 365 final project ask for?
Project Two usually asks students to build on their earlier analysis and propose a plan to improve leadership and motivation in the chosen organization, applying course theories and explaining how the plan would be carried out and evaluated.
How specific should a motivation plan be?
Specific enough that the person responsible could start it without further instructions: what they will do, when, with whom, and how they will know it is working. Theories should explain why each action is included, not replace the actions.
Why include a scorecard in a motivation plan?
A small set of measures, reviewed on a fixed date, turns the plan into something that can be tested and adjusted. It also protects against keeping practices that feel good but do not change behavior or results.
Where can I find a free PSY 365 Module 8 final project example?
The complete plan is above: a motivation and leadership plan for a composite depot manager, with a weekly routine, fair Saturday rotation, recognition, a team goal, trainer roles, honest reporting and a 90-day scorecard. Use it as a model.
What makes recognition at work effective?
Recognition works best when it is specific, timely and tied to behavior the person controls, such as a careful handoff or helping a new driver. Vague or rare praise does little, and public recognition should be fair across groups.