| Course | PSY 365 Leadership and Motivation in the Workplace |
|---|---|
| Module | Module 2 |
| Paper type | Trait and behavioral leadership analysis |
| Length | About 1,040 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BA Psychology |
| Updated | October 2026 |
Free sample paper for PSY 365 Module 2
Traits, Behaviors and One Depot Manager: Applying Early Leadership Theories to Marcus Hale
[Student Name]
Southern New Hampshire University
PSY 365: Leadership and Motivation in the Workplace
Module Two Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Traits, Behaviors and One Depot Manager: Applying Early Leadership Theories to Marcus Hale
The Manager
Marcus Hale, a composite manager, runs a parcel depot in central Pennsylvania whose staff of about 80 breaks down into 52 drivers, 22 sort and load workers and 6 dispatchers. He was the depot's top driver for six years before his promotion eight months ago. The depot's operational measures have improved under him, but three experienced drivers have resigned and drivers describe him as distant. This paper applies two of the earliest approaches to leadership, the trait approach and the behavioral approach, to understand why. The analysis draws on a Big Five personality inventory Marcus completed as part of a regional leadership program, interviews with ten drivers and two dispatchers, and two days of observation.
The Trait Approach
The trait approach asks whether certain personal characteristics distinguish leaders. Early reviews were discouraging, but organizing traits around the Big Five model revived the approach. Pooling studies of the Big Five, Judge et al. (2002) reported that the five traits together had a multiple correlation of .48 with leadership. Extraversion was the most consistent correlate, followed by conscientiousness and openness to experience; emotional stability was also related, while agreeableness showed the weakest relationship.
Marcus's profile is instructive. He scores very high on conscientiousness, which fits his reputation for organized routes and exact scan compliance, and high on emotional stability; drivers say he never loses his temper on a bad day. He scores low on extraversion and moderate on openness and agreeableness. In other words, he has two of the traits associated with effective leadership in strong measure, and is low on the trait most consistently associated with it. His low extraversion helps explain why drivers see little of him: he prefers to solve problems at his desk than on the dock at 6 a.m. when drivers load. His traits made him an excellent driver and give him a solid foundation as a manager; they do not, on their own, make drivers want to follow him.
The Behavioral Approach
Behavioral researchers stopped asking what a leader is like and started listing the things a leader does day to day. The Ohio State studies identified two broad dimensions: initiating structure, which involves defining roles, setting standards and organizing work, and consideration, which involves showing concern, respect and support for followers. Table 1 summarizes what drivers and dispatchers described.
Table 1
Marcus Hale's Leader Behaviors by Ohio State Dimension
| Dimension | Observed or reported behavior | Frequency |
|---|---|---|
| Initiating structure | Rebalances routes weekly using stop data | Consistent |
| Initiating structure | Posts daily scan compliance by driver | Daily |
| Initiating structure | Sets clear rules for truck inspections and departure times | Consistent |
| Consideration | Asks drivers about problems on their routes | Rare |
| Consideration | Recognizes good work individually | Rare; mainly by email |
| Consideration | Present at morning load-out to talk with drivers | About once a week |
| Consideration | Explains reasons behind changes | Occasional |
Note. Composite summary of interviews with ten drivers and two dispatchers and two days of observation.
What the Behavior Pattern Means
Marcus is high on initiating structure and low on consideration. In a meta-analysis pooling decades of studies on the two Ohio State dimensions, Judge et al. (2004) found that each mattered, but for different results. Consideration showed its biggest payoff in the attitudes of the people being led, their contentment with the job and the boss and their drive, while initiating structure had a small edge where the output of the leader and the work group was concerned. That pattern fits the depot closely. Its operational performance, the outcome most tied to structure, has improved. Driver satisfaction and retention, the outcomes most tied to consideration, have declined. Drivers do not describe Marcus as unfair; the posted scan data are seen as accurate, and the rules are applied evenly. They describe him as someone who does not seem to notice them.
Why Structure Came First
Marcus's pattern is common among people promoted from within for technical excellence. As a driver, his success depended on planning routes, following procedures and finishing on time, all forms of structure applied to his own work. When he became manager, he applied the same habits to the depot, and they worked: the depot's measurable results improved within months. Consideration was never part of the driver role, and nothing in the depot's reporting measures it, so there was no signal telling him it was missing until experienced drivers began to resign. The regional office compounded the problem by praising the depot's scan compliance in every monthly review while never asking about retention. In behavioral terms, Marcus has been reinforced for structure and never prompted to show consideration, which suggests that part of the solution lies with how the region evaluates its depot managers, not only with Marcus himself.
Integrating Traits and Behaviors
Traits and behaviors are connected: Marcus's low extraversion makes consideration behaviors feel less natural, while his conscientiousness makes structuring behaviors easy. DeRue et al. (2011) tested traits and behaviors together and found that leader behaviors tended to explain more variance in leadership effectiveness than traits, and that behaviors partly carried the effects of traits. This matters practically. Marcus is unlikely to become an extravert, but he can adopt specific considerate behaviors, and the research suggests those behaviors, not his personality, are what drivers respond to.
Behaviors Marcus Can Change
Three changes would raise consideration without asking Marcus to become someone else. First, attend morning load-out three days a week and use it to ask two or three drivers about their routes, a structured routine that suits a conscientious, introverted manager better than open-ended socializing. Second, replace recognition by email with brief in-person recognition at load-out, tied to specific actions such as helping a colleague finish a route. Third, when he changes routes or rules, explain the reason to drivers before posting the change. Each behavior can be scheduled and tracked, which plays to his strengths. A short driver survey in three months, using the same consideration items, would show whether drivers notice the difference.
Limits of These Approaches
Neither approach accounts for the situation. The upcoming move to weekend deliveries will create anxiety and conflict that may call for more than added consideration, and contingency theories, covered later in the course, address how the right leader behavior depends on circumstances. Trait and behavioral theories remain useful here because they identify a clear gap in Marcus's leadership and a practical way to close it.
References
DeRue, D. S., Nahrgang, J. D., Wellman, N., & Humphrey, S. E. (2011). Trait and behavioral theories of leadership: An integration and meta-analytic test of their relative validity. Personnel Psychology, 64(1), 7-52. https://doi.org/10.1111/j.1744-6570.2010.01201.x
Judge, T. A., Bono, J. E., Ilies, R., & Gerhardt, M. W. (2002). Personality and leadership: A qualitative and quantitative review. Journal of Applied Psychology, 87(4), 765-780. https://doi.org/10.1037/0021-9010.87.4.765
Judge, T. A., Piccolo, R. F., & Ilies, R. (2004). The forgotten ones? The validity of consideration and initiating structure in leadership research. Journal of Applied Psychology, 89(1), 36-51. https://doi.org/10.1037/0021-9010.89.1.36
What the PSY 365 Module 2 instructions ask for
The Module 2 assignment in PSY 365 asks you to apply trait and behavioral theories of leadership to one leader. The guidelines want the leader described, a trait analysis, a behavioral analysis and a discussion of how the two approaches fit together. Use a leader you can observe or a composite, since a famous figure is hard to analyze without inventing details. The Big Five and the Ohio State dimensions are the most researched frameworks. Compare the leader's profile with specific findings, not with a general list of good traits. Plan on three pages or so in APA 7, drawing on peer-reviewed research. DeRue and colleagues' 2011 integration is useful for the section that joins the approaches. Check the PSY 365 Module 2 rubric for whether a development plan is required.
How this PSY 365 Module 2 trait and behavioral leadership analysis example is built
The opening section introduces Marcus Hale, promoted from driver to depot manager eight months ago. The trait section profiles him as high in conscientiousness, moderate in extraversion and lower in agreeableness, and compares this with Judge and colleagues' 2002 finding that extraversion and conscientiousness relate most strongly to leadership. The behavioral section uses a table of drivers' descriptions sorted into initiating structure, such as clear routes and firm deadlines, and consideration, which drivers rarely mention. The interpretation section explains that his pattern is high structure and low consideration. A section explains why structure came first after his promotion. The integration section uses DeRue's finding that behaviors explain more than traits. A plan for behaviors he can change and a section on limits close the paper.
Where the PSY 365 Module 2 rubric puts the points
PSY 365 scores the Module 2 paper on the leader description, the trait analysis, the behavioral analysis, the integration and the writing, and every row uses SNHU's four levels. The trait row rewards a profile compared with specific meta-analytic findings rather than a list of admirable qualities. The behavioral analysis earns credit when evidence, such as followers' descriptions, is sorted into the two dimensions. Integration scores well when research comparing traits and behaviors explains why the plan targets behavior. Avoiding the claim that traits are destiny shows careful reading. Limits of the early theories, such as ignoring the situation, belong in a strong paper. The writing row covers the table, headings and APA references for the PSY 365 assignment.
PSY 365 Module 2 help: the mistakes that cost points
Trait papers often list qualities such as confident and honest without comparing them with research. Analyzing a celebrity chief executive forces the writer to guess at personality, which weakens the trait section. Describing structure and consideration without evidence from followers leaves the behavioral section abstract. Treating traits as fixed and behaviors as easy to change oversimplifies both. Use a composite leader you can describe in detail. Put the behavioral evidence in a table. Name the limits of these early theories honestly. Recommend behaviors, because a PSY 365 grader wants the paper to end with what the leader can actually do differently, such as weekly one-on-ones with drivers, which the later situational and motivation modules will build on.
Get PSY 365 Module 2 written to your instructions
Tell us which leader you are analyzing and send the PSY 365 Module 2 prompt and rubric. A trait and behavioral analysis of that leader comes back within 24 to 48 hours; the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More PSY 365 papers and related BA Psychology samples
- PSY 365 Module 1 Leadership Versus Management Discussion: A well-run depot drivers keep leaving
- PSY 365 Module 3 Motivation Theory and Workplace Challenges: Keeping drivers motivated through weekend delivery
- PSY 365 Module 4 Project One Leadership and Motivation Analysis: Leadership and motivation analysis of a depot
- PSY 365 Module 5 Contingency Leadership Memo: Leading differently in different situations
- PSY 365 Module 6 Goals, Rewards and Engagement Discussion: Goals and rewards for first-attempt delivery
- PSY 365 Module 7 Power, Influence and Ethics Analysis: Power, pressure and a scanning shortcut
- PSY 365 Module 8 Final Project Motivation Plan: A motivation plan that starts Monday
- ACC 330 Module 5 Business Deductions Assignment: Schedule C, Self-Employment Tax and QBI
- QSO 415 Module 2 Trend Analysis Assignment: Connected Hoods That Slow Down When the Kitchen Is Idle
- MKT 345 Module 1 Discussion: Why People Shop Thrift
- ACC 421 Module 6 Discussion: Benford's Law on Vendor Payments
PSY 365 Module 2 questions, answered
What is PSY 365 Module 2 about?
The second module usually covers early leadership theories, the trait approach and behavioral approaches such as the Ohio State and Michigan studies, and asks students to apply them to a leader they know or a described case.
Do some personality traits predict leadership better than others?
A meta-analysis of the Big Five found extraversion to be the most consistent correlate of leadership emergence and effectiveness, followed by conscientiousness and openness, with emotional stability also related and agreeableness showing the weakest relationship.
What are initiating structure and consideration?
They are the two leader behavior dimensions from the Ohio State studies. Initiating structure is defining roles, tasks and standards; consideration is showing concern, respect and support for followers. Both relate to leadership outcomes, but in different ways.
Where can I find a free PSY 365 Module 2 sample paper?
This page has the complete paper: trait and behavioral leadership theories applied to a composite depot manager, with a Big Five profile, a structure and consideration table and behaviors he can change. Use it as a model.
What are the Big Five personality traits?
They are openness, conscientiousness, extraversion, agreeableness and neuroticism, sometimes reversed as emotional stability. Meta-analyses find extraversion and conscientiousness relate most consistently to who emerges and succeeds as a leader.