| Course | QSO 415 Trends in Operations Management |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment analyzing one technology trend for an organization, covering how it works, value to customers and the firm, costs, readiness and risks |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 415 Module 2
Forty-One Percent Less Fan Energy: A Trend Analysis of Connected Hoods at Pellston Ventilation
[Student Name]
Southern New Hampshire University
QSO 415: Trends in Operations Management
Trend Analysis Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Forty-One Percent Less Fan Energy: A Trend Analysis of Connected Hoods at Pellston Ventilation
Introduction
Connected products, physical goods with sensors, software and connectivity, have become a staple of manufacturing trend reports. For Pellston Ventilation Company, a maker of commercial kitchen exhaust hoods, the question is concrete: should every hood the company sells be able to sense what the kitchen is doing, adjust its own fan and report its condition? This assignment explains how a connected hood would work, estimates its value to customers and to Pellston, lists its costs, assesses the company's readiness and its risks and recommends how to proceed.
How It Would Work
A conventional hood runs its exhaust fan at full speed from opening to closing, even when the grill is idle, and the make-up air unit replaces every cubic foot it exhausts with outdoor air that must be heated or cooled. A connected hood adds a kit with a temperature sensor in the duct collar, an optical sensor that detects smoke and steam across the hood, a variable-speed drive for the fan and a small controller with a cellular connection. When cooking slows, the controller slows the fan and the make-up air unit; when smoke appears, it ramps up within seconds. The controller also reports fan run hours, motor faults and the pressure drop across the grease filters, which rises as they load with grease.
Kusiak (2018) describes smart manufacturing as the use of sensors, connectivity and data to make production more responsive and efficient, and the same logic applies to products in the field. Lee et al. (2014) argue that the larger opportunity lies in the analytics and services built on that data, such as predicting failures before they happen, rather than in the connection itself.
Field Test
Pellston installed prototype kits on six hoods at restaurants in Dayton and Columbus for three months, with a meter on each fan and make-up air unit and the previous year's utility bills for comparison.
Six-restaurant field test, three months
| Measure | Result |
|---|---|
| Average fan speed during operating hours | 58% of full |
| Fan energy reduction | 41% |
| Make-up air heating and cooling reduction | About 30% |
| Average annual savings per hood, estimated | $1,450 |
| Smoke escape complaints | None reported |
| Filter alerts that preceded a missed cleaning | 4 |
Fan energy fell 41 percent because fans spent most of the afternoon and late evening at low speed, and heating and cooling of make-up air fell by about 30 percent because less air was exhausted. Annual savings averaged about $1,450 per hood, varying from $900 at a cafe to $2,300 at a busy grill. Six restaurants are too few to treat the figures as precise, and all six were in the same climate, but the direction is clear.
Value to Customers and to Pellston
For a restaurant, the value is energy savings: at a price premium of $1,900 over a standard hood, the kit would pay back in about 16 months at the average savings. Many utilities also offer rebates for demand-controlled kitchen ventilation, which shortens that further. The filter and fault alerts add value by warning a manager before a missed cleaning becomes a fire risk or a fan fails on a Friday night.
For Pellston, the direct value is margin. The kit costs about $640 in parts and assembly and sells for $1,900, a gross margin of about $1,260, against about $380 on the hood itself. If 20 percent of new hoods carried the kit, about 1,240 a year, it would add about $1.56 million in gross margin. The indirect value may be larger. A connected hood tells Pellston when filters need cleaning and fans need service, which is the data a service business needs. Tao et al. (2019) describe digital twins of products in use, models updated from field data, as a way for manufacturers to learn how products behave in service and to improve design. Pellston's engineers have never known how its fans actually run in the field.
Costs
Costs of launching and supporting connected hoods
| Cost | Estimate |
|---|---|
| Firmware and dashboard development, first year | $420,000 |
| Certification and testing | $60,000 |
| Cellular data and cloud hosting, per connected hood | About $36 a year |
| Customer support, one technician per 1,500 connected hoods | About $70,000 a year each |
| Cybersecurity testing and updates | About $50,000 a year |
The hidden costs are the ones that continue. Every connected hood must receive firmware updates for its life, which may be 20 years, and every security weakness becomes Pellston's problem. A product connected to the internet inside a restaurant can be a way into the restaurant's network if it is poorly secured.
Readiness
Pellston has strong mechanical and sheet metal engineering but only one controls engineer and no software developers. It would have to hire two developers or contract the firmware and dashboard to a specialist, and it has no process for supporting customers after installation beyond replacing parts. Its 40 sales representatives sell on price and lead time and would need training to sell savings. Pellston's customer records are also thin: the company does not know which of its installed hoods are still in use, so it could not match alerts to customers without first cleaning its installed-base data. Readiness is therefore partial: the product idea is sound, but the company lacks the software and service capabilities that make it work over time.
Risks
The main risks are false shutdowns, if a sensor fails and the fan slows during heavy cooking; a security breach; low uptake if restaurants will not pay the premium; and Pellston's inexperience with software. Responses include a fail-safe that runs the fan at full speed when any sensor fails, independent security testing before launch, a launch aimed first at chains that track energy costs and a contract developer with Pellston engineers working alongside to build in-house skill.
Recommendation
Pellston should launch the connected kit as an option on new hoods in one region, with a contracted software partner, and design it from the start to feed a future service business. Full launch should wait for a year of field data from at least 100 hoods across climates.
References
Kusiak, A. (2018). Smart manufacturing. International Journal of Production Research, 56(1-2), 508-517. https://doi.org/10.1080/00207543.2017.1351644
Lee, J., Kao, H.-A., & Yang, S. (2014). Service innovation and smart analytics for Industry 4.0 and big data environment. Procedia CIRP, 16, 3-8. https://doi.org/10.1016/j.procir.2014.02.001
Tao, F., Zhang, H., Liu, A., & Nee, A. Y. C. (2019). Digital twin in industry: State-of-the-art. IEEE Transactions on Industrial Informatics, 15(4), 2405-2415. https://doi.org/10.1109/TII.2018.2873186
What the QSO 415 Module 2 instructions ask for
The QSO 415 Module 2 assignment usually asks students to analyze one trend in depth for a specific organization. Expect to explain the trend and the technology or practice behind it, describe how it would apply to the organization's operations or products, estimate benefits and costs, assess whether the organization has the capabilities to adopt it, identify risks and make a recommendation. Strong assignments ground the analysis in the organization's own numbers or a pilot, separate value to customers from value to the firm, include the less visible costs such as software maintenance, cybersecurity and support, consider what new capabilities the trend would create and cite research rather than vendor material.
How this QSO 415 Module 2 trend analysis assignment example is built
The assignment analyzes connected products at Pellston Ventilation Company, a fictional Ohio maker of commercial kitchen hoods. A $640 sensor and controller kit measures heat and smoke at the hood, slows the exhaust fan when the kitchen is idle and reports filter loading and fan faults to a dashboard. In a field test at six restaurants, fan energy fell 41 percent, and because less conditioned air was exhausted, heating and cooling costs fell too, saving about $1,450 a year per hood against a $1,900 price premium. The paper weighs value to customers and to Pellston's service business, the costs of firmware, security and support and the company's readiness. Kusiak, Lee and colleagues and Tao and colleagues frame the analysis.
Where the QSO 415 Module 2 rubric puts the points
The QSO 415 trend analysis is commonly graded on an accurate explanation of the trend, a specific application to the organization, benefits and costs estimated with stated assumptions, value to customers and to the firm considered separately, a realistic assessment of readiness and capabilities, risks identified with responses and a recommendation that follows from the analysis. The strongest papers include costs that last after launch and explain what the trend makes possible next. Credit drops when vendor claims stand in for evidence, ongoing costs are missing, readiness is assumed or the recommendation ignores the risks. Tables, clear writing and APA citations complete the grade.
QSO 415 Module 2 help: the mistakes that cost points
Choose one trend and one organization, and explain in plain terms what would change: what the product or process would do that it does not do now. Estimate the benefits with the organization's own data or a pilot, not a vendor's brochure. List all the costs, including the ones that continue after launch, such as software updates, cybersecurity, data storage and customer support. Ask whether the organization has the people and processes to support the trend, and what new capability it would create, such as data for a service business. Name the main risks and how to reduce them. A common mistake is treating a trend as a product to buy; another is ignoring who will maintain it in year three.
Get QSO 415 Module 2 written to your instructions
Share the QSO 415 Module 2 instructions and the trend and organization you are analyzing. A writer explains how the technology works in that setting, estimates value to customers and to the firm, lists the costs including support and security, assesses readiness and risks and recommends whether and how to proceed, citing research on the trend. Your first QSO 415 paper is free, delivered in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 415 papers and related BS Operations Management samples
- QSO 415 Module 1 Discussion: Which Trends Matter to a Hood Maker
- QSO 415 Module 3 Project One: A Business Case for Collaborative Welding Robots
- QSO 415 Module 4 Discussion: Moving Fan Motors From China to Mexico
- QSO 415 Module 5 Servitization Assignment: Selling Hood Care as a Service
- QSO 415 Module 6 Discussion: Does a 310-Person Plant Need a Digital Twin?
- QSO 415 Module 7 Project Two: A Three-Year Operations Roadmap
- QSO 415 Module 8 Discussion: 3D-Printed Spare Parts for Old Hoods
- ACC 330 Module 6 Discussion: Why This Family No Longer Itemizes
- OL 317 Module 5 Milestone Two: Small Business Marketing Plan
- OL 324 Module 4 Discussion: Blaming Workers or Fixing the System
- QSO 330 Module 6 Discussion: Trust With a Plywood Supplier 8,000 Miles Away
QSO 415 Module 2 questions, answered
Where can I find a free QSO 415 Module 2 Trend Analysis Assignment sample?
The complete QSO 415 Module 2 assignment is on this page: connected, demand-controlled hoods analyzed for an invented ventilation manufacturer.
What is a connected product?
A physical product with sensors, software and connectivity that collects and transmits data about its condition and use and can often be monitored or controlled remotely.
What is the industrial internet of things?
The network of sensors, machines and devices in industrial settings that collect and exchange data for monitoring, analysis and control.
What is demand-controlled kitchen ventilation?
A system that varies exhaust fan speed according to cooking activity measured by sensors, instead of running fans at full speed throughout operating hours.
What hidden costs do connected products carry?
Firmware updates, cybersecurity, cloud data storage, customer support, connectivity problems and the engineering staff needed to maintain the software over the product's life.