| Course | QSO 415 Trends in Operations Management |
|---|---|
| Module | Module 4 |
| Paper type | undergraduate discussion post evaluating a reshoring or nearshoring decision on total cost, lead time and risk |
| Length | About 340 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 415 Module 4
Module Four Discussion
Twenty-Six Dollars More, Nine Weeks Sooner
Pellston buys about 11,400 electronically commutated fan motors a year from a supplier in China. Landed at our plant, with freight and the tariff, each costs about $212, and orders take about 14 weeks from placement to receipt. A supplier in Monterrey, Mexico, has quoted $238 with a 5-week lead time. On price alone, Mexico costs about $296,000 a year more, and that is the only number our first internal memo compared.
Ellram et al. (2013) found that firms reconsidering offshore locations increasingly weigh total cost, lead time and risk rather than labor cost alone. Our 14-week lead time means about 14 weeks of motors are always on the water or in a port, roughly $650,000 of inventory, plus about four weeks of safety stock because sailings are unreliable. With Mexico, pipeline and safety stock would fall to about seven weeks in total, cutting inventory by about $438,000. At our 25 percent carrying rate, that saves about $110,000 a year. We also spent about $140,000 last year on air freight when large school orders arrived faster than ships could. Together, those cut Mexico's premium to about $46,000 a year.
Gray et al. (2013) argue that much of what is called reshoring is a correction of offshoring decisions that underestimated hidden costs and risks. Our hidden risk is concentration: one supplier, one port, one tariff decision. A single extra tariff increase, a two-week port closure or a supplier quality problem would cost more than $46,000 in a month. Fratocchi et al. (2014) distinguish several forms of moving production back, including nearshoring to a neighboring country, which is the form that fits a buyer like us.
Split the volume. Move about 60 percent of motors to Mexico for the fast-moving sizes and keep China for the rest at the better price, so neither supplier holds all our risk. We would also ask the Mexican supplier for a six-month trial on two motor sizes before moving the full share.
Which cost does your sourcing comparison leave out, and what would it add?
References
Ellram, L. M., Tate, W. L., & Petersen, K. J. (2013). Offshoring and reshoring: An update on the manufacturing location decision. Journal of Supply Chain Management, 49(2), 14-22. https://doi.org/10.1111/jscm.12019
Fratocchi, L., Di Mauro, C., Barbieri, P., Nassimbeni, G., & Zanoni, A. (2014). When manufacturing moves back: Concepts and questions. Journal of Purchasing and Supply Management, 20(1), 54-59. https://doi.org/10.1016/j.pursup.2014.01.004
Gray, J. V., Skowronski, K., Esenduran, G., & Rungtusanatham, M. J. (2013). The reshoring phenomenon: What supply chain academics ought to know and should do. Journal of Supply Chain Management, 49(2), 27-33. https://doi.org/10.1111/jscm.12012
What the QSO 415 Module 4 instructions ask for
The QSO 415 Module 4 discussion typically addresses reshoring, nearshoring and changes in where goods are made and sourced. Students are asked to analyze a location or sourcing decision and explain the factors behind it. Strong posts compare options on total cost rather than unit price, including inventory carried because of long lead times, expediting, tariffs, quality and coordination; consider risks such as port disruptions, currency and policy changes; recognize forms such as nearshoring and dual sourcing; and use research on why firms move production. A reply that adds value asks a classmate which cost their comparison leaves out or how they would test the new supplier.
How this QSO 415 Module 4 discussion example is built
The post considers moving Pellston Ventilation Company's fan motor supply. Pellston, a fictional Ohio kitchen hood maker, buys 11,400 electronically commutated motors a year from China at $212 landed, including tariff, with a 14-week lead time, and a Mexican supplier quotes $238 with 5 weeks. The higher price adds about $296,000 a year. The shorter lead time cuts pipeline and safety stock by about $438,000, saving about $110,000 a year in carrying cost, and ends about $140,000 of air freight. Mexico is about $46,000 a year dearer but far less exposed. Ellram, Tate and Petersen, Gray and colleagues and Fratocchi and colleagues frame the decision, and the post recommends a dual source.
Where the QSO 415 Module 4 rubric puts the points
In the QSO 415 Module 4 thread, credit goes to a total-cost comparison that includes inventory, expediting and tariffs, attention to lead time and risk, recognition of the forms a location change can take, a reasoned recommendation, published sources that inform the reasoning and replies that point out costs a classmate missed. Strong posts put a price on what lower risk is worth to the buyer. Posts lose credit for comparing unit prices alone, ignoring inventory and expediting, treating reshoring as patriotic rather than economic or replying to classmates with nothing more than agreement. Grammar and APA citations count as well.
QSO 415 Module 4 help: the mistakes that cost points
Start with the full landed cost of each option: price, freight, duties and tariffs. Then add what lead time costs you: the pipeline inventory in transit, the safety stock you hold because of long and uncertain lead times and the air freight or expediting you pay when demand jumps. Multiply inventory by a carrying rate to put it in annual dollars. Consider quality, communication and the risk of disruptions or policy changes, and decide what lower risk is worth to you. Look at options in between, such as nearshoring or splitting volume between suppliers. A common mistake is comparing unit prices; another is assuming a nearer supplier is automatically more reliable. Close by asking classmates which cost their comparison leaves out.
Get QSO 415 Module 4 written to your instructions
Paste the QSO 415 Module 4 prompt and describe the sourcing or location decision you face. A writer compares the options on total landed cost, inventory, expediting, lead time and risk, explains which forms of reshoring or nearshoring fit, uses research on location decisions and recommends a choice, then asks QSO 415 classmates a question. Your first QSO 415 post is free and should reach you within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 415 papers and related BS Operations Management samples
- QSO 415 Module 1 Discussion: Which Trends Matter to a Hood Maker
- QSO 415 Module 2 Trend Analysis Assignment: Connected Hoods That Slow Down When the Kitchen Is Idle
- QSO 415 Module 3 Project One: A Business Case for Collaborative Welding Robots
- QSO 415 Module 5 Servitization Assignment: Selling Hood Care as a Service
- QSO 415 Module 6 Discussion: Does a 310-Person Plant Need a Digital Twin?
- QSO 415 Module 7 Project Two: A Three-Year Operations Roadmap
- QSO 415 Module 8 Discussion: 3D-Printed Spare Parts for Old Hoods
- OL 322 Module 7 Final Project: Change Management Plan
- OL 324 Module 1 Discussion: What Quality Means
- OL 320 Module 8 Entrepreneurial Risk Discussion: If only forty people preorder
- SPT 111 Module 2 Industry Segment Assignment: Where Cedar Hollow Competes
QSO 415 Module 4 questions, answered
Where can I find a free QSO 415 Module 4 Discussion sample?
This page holds the full QSO 415 Module 4 post: nearshoring fan motors for an invented kitchen hood maker on total cost and risk.
What is nearshoring?
Moving production or sourcing to a nearby country, such as Mexico for US companies, to shorten lead times and reduce risk while keeping some cost advantage.
What is total landed cost?
The full cost of getting a purchased item to the buyer's site, including price, freight, insurance, duties, tariffs and handling, often extended to include inventory and risk costs.
Why do long lead times raise costs?
They increase inventory in transit and the safety stock needed to cover uncertainty, and they force expensive expediting when demand changes faster than supply can respond.
What is dual sourcing?
Buying the same item from two suppliers, often in different regions, to reduce dependence on one and gain flexibility at some cost in volume discounts.