| Course | SPT 465 Global Sport Business |
|---|---|
| Module | Module 8 |
| Paper type | undergraduate discussion post examining the environmental and social responsibilities of a global sport company, weighing what it owes beyond legal requirements and proposing measurable commitments |
| Length | About 360 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Sport Management |
| Updated | October 2026 |
Free sample paper for SPT 465 Module 8
Module Eight Discussion
Discs in the Lake
Disc golf courses in Finland often run through public forests and along lakes. Discs are thrown thousands of times, some skip into water or vanish into undergrowth, and many are never found. Our discs are made of durable plastics designed to last for years, which is a selling point on the course and a problem when they are lost. Geyer et al. (2017) estimated that only about 9 percent of all plastic waste ever generated had been recycled by 2015, with most of the rest in landfills or the natural environment. A lost disc is a small share of that, but our business is built on selling plastic objects meant to be thrown into nature.
Finnish and European rules cover our packaging and the chemicals in our plastics, but not discs lost in forests. Trendafilova et al. (2013) studied professional sport organizations and found that they adopted environmental practices for a mix of reasons, including pressure from stakeholders, the desire to be seen as responsible and the influence of committed leaders. McCullough et al. (2016) describe environmental sustainability in sport as developing in waves, from early awareness to integration into how organizations operate and compete. For us, the business case is real: many Finnish players care about the forests they play in, and a company that leaves plastic behind would not be welcome. But the moral case is enough on its own: we profit from using other people's forests as playing fields.
I would commit to three measurable steps. First, by the third season make recycled resin three-tenths of every base-plastic disc, without giving up the flight players expect. Second, print a return address on every disc sold in Finland and set up a lost-disc network with shops, so found discs go back to owners or are recycled. Third, sponsor two course cleanup days a year and report, publicly and annually, our recycled content, discs returned and cleanup results.
I started this course thinking global business meant shipping products abroad. I now see it as taking on obligations in other people's places.
What responsibility does your global sport product carry that the law does not cover?
References
Geyer, R., Jambeck, J. R., & Law, K. L. (2017). Production, use, and fate of all plastics ever made. Science Advances, 3(7), Article e1700782. https://doi.org/10.1126/sciadv.1700782
McCullough, B. P., Pfahl, M. E., & Nguyen, S. N. (2016). The green waves of environmental sustainability in sport. Sport in Society, 19(7), 1040-1065. https://doi.org/10.1080/17430437.2015.1096251
Trendafilova, S., Babiak, K., & Heinze, K. (2013). Corporate social responsibility and environmental sustainability: Why professional sport is greening the playing field. Sport Management Review, 16(3), 298-313. https://doi.org/10.1016/j.smr.2012.12.006
What the SPT 465 Module 8 instructions ask for
The final SPT 465 discussion usually asks students to examine ethical, social or environmental responsibilities in global sport business and to reflect on the course. Expect to discuss an issue such as labor in supply chains, environmental impact, community effects or fairness, and to consider what sport organizations owe stakeholders in other countries. Strong posts focus on a specific responsibility connected to a real product or organization, use research on why and how sport organizations act responsibly, weigh the business case against the moral case honestly, propose commitments that can be measured and reported and avoid empty claims. A sentence or two on how the term shifted the writer's sense of global sport rounds out the post. Replies should ask how a classmate would verify that a commitment is kept.
How this SPT 465 Module 8 discussion example is built
The post asks what Driftless Disc Works, a fictional Wisconsin golf disc maker entering Finland, owes the forests and lakes where its discs are thrown and lost. The writer notes that most plastic ever made has not been recycled, that worn discs are hard to recycle and that many Finnish courses run through public forests and near lakes. Drawing on research about why sport organizations go green and how that commitment has grown in waves, the post weighs reputation and cost against legal minimums and proposes recycled content, a return address on discs, a lost-disc network with shops, cleanup days and public reporting. Geyer and colleagues, Trendafilova and colleagues and McCullough and colleagues are cited.
Where the SPT 465 Module 8 rubric puts the points
Instructors grading the closing SPT 465 thread look for a specific responsibility tied to a product or organization, accurate use of evidence, research on sustainability or responsibility in sport, honest weighing of business and moral reasons, measurable commitments with reporting, some reflection on the course and replies that probe peers' promises. Posts do well when the commitments could be checked a year later. They lose marks for vague promises, for greenwashing, for ignoring costs or for skipping the reflection. At least two APA-formatted sources and a post that respects the length guideline secure the final points. Graders also notice whether a commitment comes with a date and a way for outsiders to check it.
SPT 465 Module 8 help: the mistakes that cost points
Choose one responsibility your sport company carries abroad: environmental harm, labor conditions, community effects. Describe it with evidence. Ask what the law requires and what the company owes beyond that, and why. Weigh the business reasons, such as reputation, customer expectations and cost, against the moral ones, honestly. Propose two or three commitments with numbers and dates, and say how they will be reported so outsiders can check. Then reflect briefly on what the course changed in how you see global sport. Posts often promise to be sustainable; stronger ones name the target, the date and who will check.
Get SPT 465 Module 8 written to your instructions
Paste the SPT 465 Module 8 prompt and describe the sport company and responsibility issue you want to discuss. A writer weighs what the company owes beyond the law, connects the issue to research on sustainability and responsibility in sport, proposes measurable commitments and closes with a question for classmates. We draft the first SPT 465 post free, generally within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More SPT 465 papers and related BS Sport Management samples
- SPT 465 Module 1 Discussion: Why a Small Disc Maker Goes Global
- SPT 465 Module 2 Market Selection Assignment: Finland, Estonia, Germany or Japan
- SPT 465 Module 3 Milestone One: Goals and Entry Modes
- SPT 465 Module 4 Discussion: Selling to Players Who Know More Than You
- SPT 465 Module 5 Milestone Two: Adapt or Standardize the Marketing Mix
- SPT 465 Module 6 International Finance Assignment: Euros, Duties, Rules and Risk
- SPT 465 Module 7 Final Project: The International Business Plan
- QSO 260 Module 3 Project One: Exploring Where the Margin Went
- MKT 337 Module 8 Discussion: When the Forecast Met the Box Office
- INT 433 Module 4 Discussion: A Brand Name That Travels Badly
- HRM 300 Module 8 Discussion: Proving the Return
SPT 465 Module 8 questions, answered
Where can I find a free SPT 465 Module 8 Discussion sample?
This page holds the complete SPT 465 Module 8 post on a disc golf maker's responsibility for lost plastic in Finland.
What environmental responsibilities do sport equipment makers have?
To reduce the environmental effects of materials, production, packaging and products at the end of their life, beyond what laws require.
Why do sport organizations adopt environmental practices?
Research points to stakeholder pressure, reputation, values of leaders and the visibility of sport, among other reasons.
What is greenwashing?
Making environmental claims that exaggerate or misrepresent an organization's actual environmental performance.
How can a sport company make sustainability commitments credible?
By setting measurable targets with dates, reporting progress publicly and inviting outside checks.