| Course | QSO 260 Descriptive Analytics |
|---|---|
| Module | Module 3 |
| Paper type | undergraduate project applying exploratory descriptive analysis to a dataset to describe and interpret a business need |
| Length | About 1,100 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for QSO 260 Module 3
Where the Margin Went: An Exploratory Analysis of Keystone Secure Shred's Stops
[Student Name]
Southern New Hampshire University
QSO 260: Descriptive Analytics
Project One: Exploratory Data Analysis
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Where the Margin Went: An Exploratory Analysis of Keystone Secure Shred's Stops
The Business Need
Keystone Secure Shred is a Harrisburg company whose 38 trucks shred documents at customers' offices across Pennsylvania, New Jersey and Delaware. In 2025 its revenue rose 9 percent to $8.4 million, yet its operating margin fell from 14 percent to 8 percent. The owner's first explanation was fuel and wages, both of which rose about 4 percent, not enough to explain a margin cut nearly in half. The business need for this project is to find where truck time and revenue diverged between 2024 and 2025, so that pricing and routing can be corrected.
The Data
The analysis uses stop records for 2024 and 2025, 56,200 and 61,400 stops respectively, each with date, truck, region, account type, on-site minutes, drive minutes, pounds shredded and revenue billed. Truck time per stop is on-site plus drive minutes. The 310 stops with departure times recorded late, identified in the Module 2 outlier check with the rule Leys et al. (2013) recommend, were excluded from time calculations. Cost per truck-hour, $96 in 2025, comes from the finance team's total of driver wages, fuel, truck leases, maintenance and disposal divided by truck hours.
First Look: Overall Trends
Stops rose 9 percent and truck hours rose 13 percent, while stop revenue rose 7 percent and paper recycling revenue stayed flat. Truck time therefore grew faster than revenue, which by itself explains much of the margin decline: each hour of truck time earned less in 2025 than in 2024. The question is which stops account for the difference.
Comparing Account Types
Share of stops, truck time and stop revenue by account type, 2025
| Account type | Share of stops | Share of truck time | Share of stop revenue | Revenue per truck-hour |
|---|---|---|---|---|
| Single console | 35.5 percent | 28.9 percent | 11.1 percent | $71 |
| Two to four consoles | 37.3 percent | 28.5 percent | 27.6 percent | $178 |
| Five or more consoles | 16.0 percent | 16.1 percent | 28.8 percent | $329 |
| Purge jobs | 11.2 percent | 26.5 percent | 32.5 percent | $225 |
Single-console accounts stand out. They use more than a quarter of all truck time but bring in about a ninth of stop revenue, and at $71 per truck-hour they earn less than the $96 an hour the trucks cost to run. Every other segment earns well above cost. Revenue per truck-hour, rather than revenue per stop, is the measure that exposes the problem, because a single-console stop is short on site but long in driving.
What Changed Between 2024 and 2025
In March 2024, to win dental and medical offices, Keystone introduced a $39 flat-rate visit for any office with a single console. Single-console accounts grew from 1,420 at the start of 2024 to 1,860 by the end of 2025, an increase of 31 percent, while the other account types grew 4 percent. Because many of the new single-console customers were in small towns away from existing routes, their median drive time rose from 21 minutes in 2024 to 26 minutes in 2025. Stops from this segment rose from 16,100 to 21,800. Nearly all of the growth in truck hours between the two years comes from single-console stops.
Checking the Pattern
Anscombe (1973) warned that a summary can mislead until the data are looked at directly, so the finding was checked several ways. By month, single-console revenue per truck-hour was below cost in every month of 2025, ranging from $64 in February, when snow slowed driving, to $78 in June. By region, it was below cost in all three: $82 around Philadelphia, where offices are close together, $70 in central Pennsylvania and $61 in southern New Jersey and Delaware. By weekday, Monday routes, which carry the most single-console stops, had the lowest revenue per truck-hour of any day. The pattern is consistent, not an artifact of one month or region.
A Closer Look at the New Single-Console Customers
The 440 single-console accounts added during the promotion differ from the 1,420 that existed before it. The older accounts are concentrated around Harrisburg, Lancaster and the Philadelphia suburbs, where Keystone already had dense routes; the new accounts are spread across smaller towns, often 20 or more miles from the nearest other customer. As a result, the new accounts' median drive time is 34 minutes compared with 22 for the older single-console accounts. Their on-site time is almost identical, about 7 minutes. Revenue per truck-hour is therefore about $85 for older single-console accounts and about $56 for the new ones. The promotion did not simply add more of the same customer; it added customers in places the routes were not built to reach, which is why the problem grew faster than the account count. This also suggests that a single price for all single-console offices treats very different costs the same way.
Other Observations
Purge jobs are profitable per hour but highly variable, and days with two or more purges were more likely to run late, which pushed other stops into overtime. Offices with five or more consoles are the most profitable segment and have grown slowly. Late arrivals, more than 30 minutes after the scheduled window, occurred on 8.4 percent of stops overall and 13.1 percent on Mondays.
What the Owner Saw and Did Not See
The problem went unnoticed for over a year because Keystone's monthly report showed revenue, stops and new accounts, all of which were rising, and showed costs only as a company total. None of its measures connected the time a truck spent on a kind of stop to the money that stop brought in. The promotion looked like a success by the measures the owner watched: hundreds of new accounts and more stops every month. Only when truck time and revenue are put side by side for each account type does the cost appear.
Limitations
The analysis attributes driving time to the stop that follows it, which may overstate the cost of single-console stops on routes where they fill gaps between larger stops. Costs per truck-hour are averages and may differ by region. And the data show what happened, not what would happen under a different price; some single-console customers might leave if the price rose.
Questions for Project Two
Pauwels et al. (2009) argue that useful performance measures are those tied to the decisions managers make. Project Two will report a small set of such measures and address four questions: What price or visit frequency would bring single-console stops above cost? Could single-console stops be clustered on fewer routes to cut drive time? How should purge jobs be scheduled to reduce late days? And which measures should the owner track monthly to catch a problem like this sooner?
References
Anscombe, F. J. (1973). Graphs in statistical analysis. The American Statistician, 27(1), 17-21. https://doi.org/10.1080/00031305.1973.10478966
Leys, C., Ley, C., Klein, O., Bernard, P., & Licata, L. (2013). Detecting outliers: Do not use standard deviation around the mean, use absolute deviation around the median. Journal of Experimental Social Psychology, 49(4), 764-766. https://doi.org/10.1016/j.jesp.2013.03.013
Pauwels, K., Ambler, T., Clark, B. H., LaPointe, P., Reibstein, D., Skiera, B., Wierenga, B., & Wiesel, T. (2009). Dashboards as a service: Why, what, how, and what research is needed? Journal of Service Research, 12(2), 175-189. https://doi.org/10.1177/1094670509344213
What the QSO 260 Module 3 instructions ask for
QSO 260 Project One typically asks students to explore a dataset related to a business need using descriptive analytics. Expect to state the business need or question, describe the dataset and its variables, apply summary statistics, distributions, comparisons across groups and simple visuals and interpret what the patterns suggest. Many versions ask students to identify trends, relationships or segments worth further study and to note data limitations. Strong projects let the business question guide the exploration rather than reporting every possible statistic, test whether a pattern holds across time periods or groups and are honest that exploration suggests explanations rather than proving them. The project should set up the fuller report in Project Two.
How this QSO 260 Module 3 project one example is built
The project explores why Keystone Secure Shred, a fictional shredding company, saw its operating margin drop from 14 to 8 percent in 2025 while revenue grew 9 percent to $8.4 million. Using 2024 and 2025 stop records, it compares truck time and revenue by account type and finds that a 2024 promotion offering $39 flat-rate visits to single-console offices grew those accounts from 1,420 to 1,860; by 2025 their stops used 29 percent of truck time but produced 11 percent of stop revenue, at about $71 per truck-hour against a cost near $96. The pattern holds by month and region. Anscombe, Leys and colleagues and the Pauwels team guide the exploration, which ends with questions for Project Two.
Where the QSO 260 Module 3 rubric puts the points
For QSO 260 Project One, credit follows a sharply stated business need, an accurate description of the data, appropriate descriptive methods, meaningful comparisons and visuals, sound interpretation and identification of questions and limitations for further analysis. Projects that score well follow the business question, show that a pattern holds across time and groups and translate findings into business terms such as revenue per truck-hour. Points drop when the project lists statistics with no direction, compares only overall figures, treats one pattern as proven cause or ignores data quality. Clear tables, readable charts and APA citations complete the rubric.
QSO 260 Module 3 help: the mistakes that cost points
Begin with the business need in one sentence and let it decide what you explore. Describe the dataset briefly: rows, variables, time period and any cleaning. Then compare the measures that matter for the need, often costs and revenues, across segments, and look for groups whose share of one differs sharply from their share of the other. Test whether a pattern holds month by month, region by region or across another split before you trust it. A common mistake is exploring everything and finding nothing; another is presenting a single striking chart without checking it. Translate each finding into a business unit, such as dollars per hour. End with the questions your final report will answer and the data you would need.
Get QSO 260 Module 3 written to your instructions
Upload the QSO 260 Project One guidelines and describe your dataset and business need. A writer states the need, describes the data, explores distributions and segments with tables and charts, follows the patterns that matter, checks them across time and groups and lists the questions your final report should answer. No fee applies to your first QSO 260 project, and we normally deliver it two days after you send the files. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 260 papers and related BS Business Administration samples
- QSO 260 Module 1 Discussion: What the Average Stop Hides
- QSO 260 Module 2 Summary Statistics Assignment: Describing 61,400 Service Stops
- MKT 400 Module 5 Milestone Two: Brand Elements, Architecture and Extensions
- FIN 485 Module 5 Milestone Two: Taxes and an Estate Plan After Divorce
- INT 220 Module 8 Discussion: Greenhouses and Groundwater in the Souss Valley
- HRM 360 Module 7 Final Project: The Analytics Report to Leadership
QSO 260 Module 3 questions, answered
Where can I find a free QSO 260 Module 3 Project One sample?
The complete QSO 260 Project One is on this page: an exploratory analysis of an invented shredding company's stops that traces a falling margin to one pricing promotion.
What is exploratory data analysis?
Examining data with summaries, distributions, comparisons and charts to find patterns, segments and anomalies that suggest explanations and questions for further analysis.
How do you explore data for a business problem?
Start from the business question, compare the measures that matter across segments and time, check whether patterns hold across groups and translate findings into business terms.
What is revenue per truck-hour?
Revenue divided by the hours of truck and crew time a job uses, including driving; it lets a service business compare how profitable different kinds of work are.
Can exploratory analysis prove why a problem happened?
No. It reveals patterns consistent with explanations; confirming a cause needs further analysis or a test, which is why exploration ends with questions.