QSO 260 Module 2 Summary Statistics Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 260 Module 2 Summary Statistics Assignment sample computes and interprets measures of center, spread, shape and outliers for a business dataset and its segments. SNHU QSO 260 (QSO-260) assigns this early in its BS Business Administration descriptive analytics course. The dataset holds 61,400 service stops made in 2025 by Keystone Secure Shred, an invented mobile document-shredding company. For on-site minutes, drive minutes, pounds shredded and revenue per stop, the paper reports the mean, median, standard deviation, quartiles and range, repeats them for four kinds of account, explains why the data are right-skewed, identifies outliers with a robust rule and states what the results mean for planning routes.

CourseQSO 260 Descriptive Analytics
ModuleModule 2
Paper typeundergraduate assignment computing and interpreting measures of center, spread, shape and outliers for a business dataset and its segments
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for QSO 260 Module 2

1

Describing a Year of Shredding Stops: Summary Statistics for Keystone Secure Shred

[Student Name]

Southern New Hampshire University

QSO 260: Descriptive Analytics

Summary Statistics Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe 61,400 stops and all statistics for Keystone Secure Shred in this QSO 260 assignment are invented.
2

Describing a Year of Shredding Stops: Summary Statistics for Keystone Secure Shred

Introduction

Keystone Secure Shred runs 38 shredding trucks that visit about 4,860 recurring customers on schedules and carry out one-time purge jobs. This assignment describes the 61,400 stops the trucks made in 2025 using summary statistics. It reports center, spread and shape for four variables, breaks them out by account type, identifies outliers and explains what the results mean for route planning, where the company currently assumes that every stop takes the same 19 minutes.

What this page is doingStates the dataset and the purpose.
3

The Variables

Each stop record includes the time the driver arrived and left, from which on-site minutes are calculated; the drive minutes from the previous stop; the pounds of paper shredded, weighed on the truck's scale; and the revenue billed for the stop. Each stop is also labeled by account type. Single-console accounts, mostly dental and medical offices, pay a flat $39 per visit. Accounts with two to four consoles and those with five or more pay by console. Purges are one-time jobs priced by the pound or by the hour.

What this page is doingDescribes what was measured.
4

Overall Statistics

Summary statistics for all 61,400 stops in 2025 (invented data)

VariableMeanMedianStd. dev.Q1Q3MinMax
On-site minutes1912228212240
Drive minutes2118131127195
Pounds shredded141642303513036,800
Revenue per stop$125$72$160$39$135$39$4,900

Every variable except drive minutes is strongly right-skewed: the mean sits well above the median, and the maximum is many times the third quartile. Most stops are small and quick, while a minority of large stops pull the averages up. For on-site minutes, the median of 12 describes a typical stop much better than the mean of 19. The standard deviation, 22 minutes, is larger than the median itself, a sign that the overall numbers mix very different kinds of stops. Drive minutes are closer to symmetric, since they depend on the distance between neighboring customers.

What this page is doingReports center and spread for all stops.
5

Statistics by Segment

Median and interquartile range by account type

Account typeStopsOn-site minutes, median (IQR)Drive minutes, medianPounds, medianRevenue, median
Single console21,8007 (5 to 10)2631$39
Two to four consoles22,90012 (9 to 17)1972$88
Five or more consoles9,80024 (18 to 33)17190$210
Purge jobs6,90068 (45 to 105)281,150$340

The segments are very different. Single-console stops are fast on site but have the longest drives, because small dental and medical offices are spread across suburbs and small towns. Purge jobs dominate the right tail of every variable. Within each segment the spread is much narrower than in the overall data, which confirms that most of the overall variation comes from mixing segments rather than from unpredictability within them. Anscombe (1973) showed that datasets with identical summary statistics can be very different, and these results show the reverse lesson: one set of overall statistics can conceal four distinct businesses.

What this page is doingBreaks the data out by account type.
6

Outliers

Analysts often flag anything beyond three standard deviations, but in skewed data the mean and standard deviation are themselves pulled by the outliers. Leys et al. (2013) recommend instead using the median absolute deviation, flagging values that lie far from the median relative to that more robust measure of spread. Applying their rule within each segment flagged 1,420 stops for on-site minutes. Checking them showed three kinds: 980 purges of unusual size, which are real; 310 stops where the driver forgot to record departure until later, which are recording errors; and 130 stops where the driver waited for a locked office to be opened. The recording errors were set aside for time analysis but kept for revenue; the others were kept, because they are real costs the routes must absorb.

What this page is doingIdentifies and checks extreme values.
7

Shape of Each Distribution

The four variables have different shapes, and each shape has a business explanation. On-site minutes are right-skewed with a long tail: most stops are routine console exchanges that take minutes, and a few purges take hours. Pounds shredded follow the same pattern even more sharply, since a single records purge can produce more paper than a hundred small offices. Revenue per stop has a floor at $39, the flat rate for single-console offices, which shows up as a spike at the bottom of the distribution: almost a third of all stops bill exactly that amount. Drive minutes are the closest to symmetric, with most drives between 11 and 27 minutes and a modest tail of long rural drives. Because three of the four variables are skewed, the middle-half range from the first to the third quartile describes typical stops more faithfully than the standard deviation does, while the standard deviation remains useful for planning buffers, since it reflects how far the long tail can stretch a day.

What this page is doingDescribes skew and spread in words.
8

Relationships Between Variables

On-site minutes and pounds shredded rise together, as expected, since more paper takes longer to shred, but the relationship is loose for small stops, where much of the time is spent walking to the console and getting a signature rather than shredding. Drive minutes are unrelated to on-site minutes within segments, which means short stops do not come with short drives. That last point matters for single-console accounts, whose short time on site is offset by long drives between them.

What this page is doingNotes how the measures move together.
9

Interpretation for Route Planning

The current plan assumes 19 minutes for every stop. The statistics show that a route of single-console offices needs about 7 minutes on site but 26 minutes of driving per stop, while a route with two purges needs several extra hours. Planning by segment medians and adding a buffer based on each segment's upper quartile would make route lengths more realistic. The figures also raise a pricing question for Project One: a single-console stop brings $39 for about 33 minutes of truck time, while a two-to-four-console stop brings $88 for about 31 minutes. Weissgerber et al. (2015) argue that showing the spread of data, not only averages, lets readers judge findings for themselves; the planning team should see these distributions, not the single number it has used.

What this page is doingStates what the statistics mean for the business.
10

Conclusion

Keystone's stop data are right-skewed and mixed. Medians and segment-level statistics describe them accurately; a single average does not. Project One will explore what these differences mean for truck time, revenue and the company's falling margin.

What this page is doingSummarizes the description.
11

References

Anscombe, F. J. (1973). Graphs in statistical analysis. The American Statistician, 27(1), 17-21. https://doi.org/10.1080/00031305.1973.10478966

Leys, C., Ley, C., Klein, O., Bernard, P., & Licata, L. (2013). Detecting outliers: Do not use standard deviation around the mean, use absolute deviation around the median. Journal of Experimental Social Psychology, 49(4), 764-766. https://doi.org/10.1016/j.jesp.2013.03.013

Weissgerber, T. L., Milic, N. M., Winham, S. J., & Garovic, V. D. (2015). Beyond bar and line graphs: Time for a new data presentation paradigm. PLOS Biology, 13(4), Article e1002128. https://doi.org/10.1371/journal.pbio.1002128

What the QSO 260 Module 2 instructions ask for

The QSO 260 Module 2 assignment typically asks students to describe a business dataset with summary statistics. Expect to calculate measures of central tendency such as the mean and median, measures of spread such as the range, standard deviation and interquartile range, and to describe the shape of each distribution, including skew and outliers. Many versions ask students to compare groups within the data and to explain what the statistics mean for the business. Strong submissions present results in clear tables, choose the right measure for each purpose, explain why data are shaped as they are and avoid treating outliers as errors without checking them. Interpretation matters as much as calculation.

How this QSO 260 Module 2 summary statistics assignment example is built

The assignment summarizes 61,400 stops by Keystone Secure Shred, a made-up shredding company. On-site minutes have a mean of 19 and median of 12, a standard deviation of 22 and an interquartile range of 8 to 21, a strong right skew driven by purge jobs. Drive minutes, pounds shredded and revenue per stop are summarized the same way, then each is broken out for single-console offices, offices with two to four consoles, offices with five or more and purges. Outliers are identified with the median absolute deviation rule that Leys and colleagues recommend over the mean-plus-three-standard-deviations habit. Anscombe and the Weissgerber team explain why spread must be shown, and route planning implications close the paper.

Where the QSO 260 Module 2 rubric puts the points

In QSO 260 the summary statistics assignment is generally graded on accurate calculation of center, spread and position measures, correct description of distribution shape and outliers, sensible comparison of segments, appropriate choice of measures for the data, clear tables and interpretation tied to the business. The strongest submissions explain why each variable is shaped as it is, use robust measures where data are skewed and check outliers before deciding what to do with them. Points fall when statistics are reported without interpretation, when the mean alone describes skewed data, when outliers are deleted without investigation or when segments are ignored. Organization and APA citations complete the rubric.

QSO 260 Module 2 help: the mistakes that cost points

Start by listing each variable and what it measures. For each, calculate the mean, median, standard deviation, quartiles, minimum and maximum, and look at a histogram before writing anything. If the mean and median differ a lot, describe the skew and say which measure better describes a typical case. Then break the data into meaningful groups and repeat the key measures, since overall statistics can hide very different segments. For outliers, use a rule based on the median and look at the records before deciding whether they are errors or real cases. A common mistake is reporting long lists of numbers with no explanation; another is deleting extreme values that are real. Close with what the statistics mean for a business decision.

Get QSO 260 Module 2 written to your instructions

Share the QSO 260 Module 2 instructions and your dataset or variables. A writer calculates and reports center, spread, quartiles and outliers for each variable and segment, explains what the shape of the data means, chooses the right summary for each purpose and ties the results to a business decision. Your first summary statistics assignment is free and returns in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 260 papers and related BS Business Administration samples

QSO 260 Module 2 questions, answered

Where can I find a free QSO 260 Module 2 Summary Statistics Assignment sample?

This page holds the complete QSO 260 Module 2 assignment: summary statistics for an invented shredding company's 61,400 service stops, overall and by segment.

What summary statistics should I report?

For each numeric variable, a measure of center (mean and median), spread (standard deviation and interquartile range), the range and a description of shape and outliers.

What does it mean when the mean is larger than the median?

The distribution is usually right-skewed: a minority of large values pull the mean upward, so the median better describes a typical case.

How do you identify outliers?

Common rules flag values far from the quartiles or median; methods based on the median absolute deviation are less distorted by the outliers themselves than rules based on the mean and standard deviation.

Should outliers be removed?

Only if they are errors. Real extreme cases, such as very large jobs, should be kept and often analyzed separately because they matter to the business.