INT 400 Module 5 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This INT 400 Module 5 Milestone Two sample selects a first foreign market for a small manufacturer through a transparent, staged screening rather than instinct or personal contacts. SNHU INT 400 (INT-400) sets its second milestone as an evidence-based contest among markets, which BS International Business students must judge and defend. For Tamarack Snowshoe Works, a composite Minnesota snowshoe maker, the paper screens twelve winter markets on broad indicators, narrows them with snowshoe-specific measures, compares three finalist regions in depth, recommends one with an entry approach and explains, openly, why the owner's personal contact in Norway did not decide the outcome.

CourseINT 400 International Business Project
ModuleModule 5
Paper typeundergraduate capstone milestone presenting systematic international market selection
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS International Business
UpdatedOctober 2026

Free sample paper for INT 400 Module 5

1

From Twelve Winters to One: Market Selection for Tamarack Snowshoe Works

[Student Name]

Southern New Hampshire University

INT 400: International Business Project

Milestone Two: International Market Selection

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingTamarack Snowshoe Works is fictional; the scores reflect teaching judgments built from general market descriptions, not purchased data.
2

From Twelve Winters to One: Market Selection for Tamarack Snowshoe Works

Introduction

The readiness review concluded that the Ely company can prepare to export, provided it protects its trademark, gains export know-how, builds inventory in its off-season and works through a partner with local marketing reach. This milestone selects the first region. It screens twelve winter markets in two stages, compares three finalists in depth, recommends one region and an entry approach and tests how sensitive the choice is to the weights used. It also explains why the owner's friend in Norway, who runs an outdoor store, did not decide the outcome.

What this page is doingChoosing with a method.
3

Method

Cavusgil (1985) recommended moving from preliminary screening on general indicators to assessment of industry potential in a smaller set of markets and then to company-specific analysis. Sakarya et al. (2007) showed how headline economic numbers can point a firm toward the wrong countries unless measures tied to the industry are added. Researchers surveying the market selection literature also caution that firms often choose markets for convenience or through contacts rather than systematic comparison (Papadopoulos & Martín Martín, 2011), and Ellis (2011) found that entrepreneurs' social ties shape which opportunities they see. The method therefore uses product-specific measures in the second screen and keeps a written record of criteria and weights.

What this page is doingTwo screens and a deep comparison.
4

First Screen

Every one of the twelve has dependable winter snow somewhere people live or travel. The first screen scored income per person, how many people live within a few hours of snowy terrain and ease of trade for a U.S. exporter. Chile and New Zealand fell out because their snow seasons coincide with Tamarack's off-season but their winter hiking markets are small and distant. South Korea fell out on limited winter hiking participation relative to skiing. France and Italy scored well but were grouped with the Alpine region for the second screen, since the same alpine culture spans borders, and later set aside because a German-speaking distributor could not cover them. Six markets advanced: Norway, Sweden, Finland, Austria, Switzerland and Germany, plus Japan as a distant but promising case.

What this page is doingTwelve to six.
5

Second Screen

Second screen, weighted scores (1 = weak, 5 = strong)

CriterionWeightAlpine regionNordic countriesJapan
Winter hiking and snowshoe participation25 percent543
Specialty outdoor retailers and rental fleets20 percent544
Competition from established snowshoe brands15 percent233
Reach through a single distributor15 percent533
Shipping and seasonal fit for spring inventory15 percent443
Regulatory and language burden10 percent442
Weighted score4.353.703.10

The Nordic and Alpine scores were each built from the countries in the group; Japan was scored alone.

What this page is doingProduct-specific signals.
6

Finalists Compared

The Alpine German-speaking region of Austria, Switzerland and southern Germany has a strong tradition of winter hiking, often guided and often on snowshoes, a dense network of specialty mountain sports shops and rental fleets at resorts and huts that buy durable models in volume. One German-speaking distributor could reach all three markets, which suits Tamarack's limited marketing budget. Competition is real, including established European and American snowshoe brands, but Tamarack's one-hand binding and children's line give it something to offer. The Nordic countries also scored well; Norway in particular has a deep outdoor culture, but the three markets are smaller, languages differ and a single distributor is less likely to cover all of them. Japan has enthusiastic winter hikers and premium retailers but greater regulatory, language and logistics demands for a first-time exporter.

What this page is doingWhy the Alps lead.
7

Regulations and Logistics

Snowshoes sold to consumers in the European Union must meet the general product safety rules that apply to consumer products, including information on the manufacturer and an importer established in the EU, a role the distributor would fill. Switzerland, outside the EU, has its own customs procedures and product rules. Goods would ship by container from Minnesota through a European port, with the distributor handling import clearance. Because retailers in the Alpine region order in late winter and spring for the following season, Tamarack could build export inventory from February to June, its slow months, and ship by July.

What this page is doingWhat entry would require.
8

Entry Approach

The readiness assessment favored a partner who could supply local knowledge and marketing, and the Alpine region offers several established distributors of mountain sports equipment that carry a handful of foreign brands. Tamarack should approach three of them at the Munich winter sports trade fair in late winter, offering a two-year agreement covering Austria, Germany and Switzerland, exclusive only after the distributor meets a first-year volume target. The distributor would hold stock, sell to specialty shops and rental fleets, handle warranty returns and act as the importer responsible for product safety documentation. Tamarack would supply German-language catalogs, metric sizing charts and demonstration pairs, and its owner or export coordinator would visit twice in the first season. This approach keeps Tamarack's investment small while it learns how Alpine retailers and renters actually use its snowshoes.

What this page is doingHow Tamarack would go in.
9

Sensitivity

If participation and retailer measures were weighted less and competition more, the Nordic countries would close the gap but not overtake the Alpine region. Only if a single-distributor reach were dropped entirely and the owner's Norwegian contact were counted as a decisive advantage would the Nordic group come out ahead. That contact remains useful: the owner's friend could become one of the first Nordic retailers if Tamarack later expands north. Japan, the third finalist, is worth revisiting once Tamarack has export experience, because its premium retailers and winter hiking community are real, but the language, labeling and logistics demands are better faced by a company that has already exported once.

What this page is doingWould different weights change the answer?
10

Recommendation

Tamarack should make the Alpine German-speaking region its first overseas market, entering through a single distributor based in Austria or southern Germany with reach into Switzerland. The next assignment will project the financial results of that entry over three years.

What this page is doingThe Alps first, through one distributor.
11

Conclusion

A staged screen with written weights moved Tamarack from twelve possible winters to one region, and the sensitivity check shows the choice is robust. The Alps fit the company's product, its need for a distributor and its production calendar, and they leave the Nordic countries and Japan as sensible next steps once Tamarack has learned how to export.

What this page is doingA choice the owner can defend.
12

References

Cavusgil, S. T. (1985). Guidelines for export market research. Business Horizons, 28(6), 27-33. https://doi.org/10.1016/0007-6813(85)90082-5

Ellis, P. D. (2011). Social ties and international entrepreneurship: Opportunities and constraints affecting firm internationalization. Journal of International Business Studies, 42(1), 99-127. https://doi.org/10.1057/jibs.2010.20

Papadopoulos, N., & Martín Martín, O. (2011). International market selection and segmentation: Perspectives and challenges. International Marketing Review, 28(2), 132-149. https://doi.org/10.1108/02651331111122632

Sakarya, S., Eckman, M., & Hyllegard, K. H. (2007). Market selection for international expansion: Assessing opportunities in emerging markets. International Marketing Review, 24(2), 208-238. https://doi.org/10.1108/02651330710741820

What the INT 400 Module 5 instructions ask for

Milestone Two in INT 400 usually asks you to analyze potential international markets or strategies for your client and recommend a direction. Expect to compare countries or options using criteria such as market size, competition, cultural and economic distance, regulations and logistics, and to justify a choice, sometimes with an entry approach. A strong milestone uses a staged and transparent process, chooses criteria that matter for the client's product, explains weights, uses proxies honestly where direct data are missing, compares finalists in depth, links the choice to the readiness findings and shows how sensitive the result is to the assumptions. Some instructors also want a short note on how the client would actually approach partners in the chosen market.

How this INT 400 Module 5 milestone two example is built

The sample screens twelve winter markets for Tamarack Snowshoe Works: Norway, Sweden, Finland, Austria, Switzerland, Germany, France, Italy, Japan, South Korea, Chile and New Zealand. A first screen on income, reliable snow near population centers and ease of trade, and a second on winter hiking participation, specialty retailers, rental fleets and competition, produce three finalists: the Alpine German-speaking region, the Nordic countries and Japan. A deeper comparison favors the Alpine region, where one distributor can reach three countries, snowshoe hiking is popular and inventory can ship in spring. The paper follows Cavusgil's stages, Sakarya and colleagues' industry measures and warnings against contact-driven choices.

Where the INT 400 Module 5 rubric puts the points

Graders typically score Milestone Two on the market analysis, the criteria and method, use of data, the recommendation and its link to the client's situation and APA style. The highest marks go to transparent, staged screening with justified weights, honest use of proxies, a deep comparison of finalists and a recommendation consistent with the readiness assessment. Points come off for choosing a country first and justifying it afterward, for criteria unrelated to the product, for hidden weights, for ignoring logistics and regulations and for recommendations that ignore what the client can actually manage. A sensitivity paragraph showing the result survives different weights tends to be read as a mark of rigor.

INT 400 Module 5 help: the mistakes that cost points

Start with a long list of plausible countries, then screen in two stages: broad indicators first, product-specific measures second. Write down every criterion, its weight and its source before you score, so the process stays honest. Use proxies where direct data are missing and say how they could mislead. Compare the finalists in more depth, including channels, competitors, regulations, logistics and seasonality. Tie the choice back to your readiness findings, such as the client's capacity or need for a distributor. Show what happens to the ranking if the weights change. Finally, explain any personal contacts the client has and why they did or did not shape the decision.

Get INT 400 Module 5 written to your instructions

Upload the INT 400 Milestone Two guidelines and the countries your client might enter. We build a two-stage screen with weighted criteria, compare finalists in depth, recommend a market and entry route and show how different weights would change the answer. About two days; first milestones are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More INT 400 papers and related BS International Business samples

INT 400 Module 5 questions, answered

Where can I find a free INT 400 Module 5 Milestone Two sample?

The full INT 400 Module 5 Milestone Two paper is on this page, screening twelve countries and choosing the Alps for a Minnesota snowshoe maker.

How do you select an international market for a small business?

Screen many countries on broad indicators, narrow with product-specific measures, compare a few finalists in depth and choose the one that best fits the firm's capabilities.

What criteria are used in international market selection?

Market size and growth, income, competition, cultural and geographic distance, regulations, channels and logistics, plus measures specific to the product.

Why should personal contacts not drive market selection?

Contacts can open doors, but research shows they also narrow the options firms consider, so a systematic screen helps confirm whether the contact's market is really the best fit.

What is a sensitivity check in market selection?

Testing whether the recommended market stays on top when criteria weights or uncertain scores change, which shows how robust the choice is.