INT 400 Module 6 Financial Projections Assignment Example

Reviewed by Portia Lambrick, MBA

This INT 400 Module 6 Financial Projections Assignment sample puts numbers on an international expansion so the client can see what it will cost and earn. SNHU INT 400 (INT-400) asks BS International Business students to turn their market recommendation into a financial forecast a decision maker would trust. For Tamarack Snowshoe Works, a composite Minnesota snowshoe maker entering the Alpine region through a distributor, the paper states every assumption, projects three years of volumes, revenue, costs and contribution, calculates net present value and payback, tests optimistic and pessimistic scenarios and explains what the numbers mean for the owner's decision.

CourseINT 400 International Business Project
ModuleModule 6
Paper typeundergraduate capstone assignment projecting the financial results of foreign market entry
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS International Business
UpdatedOctober 2026

Free sample paper for INT 400 Module 6

1

Three Winters in the Alps: A Financial Projection for Tamarack Snowshoe Works' Export Entry

[Student Name]

Southern New Hampshire University

INT 400: International Business Project

Financial Projections Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingAll volumes, prices and costs belong to the fictional Tamarack Snowshoe Works and were chosen to illustrate the method.
2

Three Winters in the Alps: A Financial Projection for Tamarack Snowshoe Works' Export Entry

Introduction

Milestone Two recommended that Tamarack Snowshoe Works enter the Alpine German-speaking region through a single distributor. The owner's next question is financial: what will it cost, and when will it pay? This assignment sets out the assumptions behind a three-year projection, calculates contribution, net present value and payback, tests pessimistic and optimistic scenarios and spells out what the figures imply for the decision. Figures are in U.S. dollars and before income tax. The projection covers only the Alpine venture's incremental revenue and costs; existing North American business, overhead that would be incurred anyway and the owner's own time are excluded, so the results show what the export decision itself adds or subtracts.

What this page is doingTurning a market into numbers.
3

Assumptions

The forecast assumes the distributor takes 3,000 pairs the first winter, 5,500 the second and 8,000 the third, based on interviews with two U.S. outdoor brands about typical first-distributor volumes and on the region's specialty retail network. The average price to the distributor is $95 a pair in years one and two, rising to $97 in year three, which supports a retail price of roughly 180 to 200 euros after the distributor's and retailers' margins, duties and value-added tax. Tamarack ships from Minnesota on terms that make the distributor responsible for freight and import duties. The variable cost per pair is $52, rising to $53 in year three, from Tamarack's cost records. Working capital for export inventory and receivables is estimated at $60,000 at the start. The discount rate is 12 percent, the return the owner says he expects from new projects, somewhat above the interest rate on the company's credit line to reflect the added risk of a first export venture.

What this page is doingEvery number and its source.
4

Export-Specific Costs

Export fixed and one-time costs, thousands of dollars

ItemYear 1Year 2Year 3
Part-time export coordinator454545
Trademark filing for the region1200
Translation of catalog and sizing charts1000
Stand at the Munich winter sports trade fair252525
Demonstration pairs for retailers and rental fleets1555
Inventory carrying from spring production202025
Travel151515
Total142110115
What this page is doingThe costs that are easy to miss.
5

Base Case

Base case projection, thousands of dollars

LineYear 1Year 2Year 3
Pairs sold3,0005,5008,000
Revenue285.0522.5776.0
Variable costs156.0286.0424.0
Contribution129.0236.5352.0
Export fixed costs142.0110.0115.0
Export profit-13.0126.5237.0

In the base case, the venture loses $13,000 in its first year, then earns $126,500 and $237,000. Discounting those results at 12 percent and subtracting the $60,000 of working capital gives a net present value of about $198,000. Cumulative cash turns positive during year two, so the payback period is a little under two years from launch.

What this page is doingThree years.
6

Scenarios

Scenario results, thousands of dollars

ScenarioYear 1Year 2Year 3Net present value
Pessimistic, half the base volumes-77.58.261.0about -79
Base-13.0126.5237.0about 198
Optimistic, 30 percent above base volumes25.7197.4342.6about 364

The pessimistic case, with half the base volumes and the same fixed costs, loses money in present-value terms; the venture would barely break even by year three. The optimistic case nearly doubles the base value. Volume is by far the most important assumption, because most export costs are fixed. Price matters too: a $5 drop in the average price, perhaps to match a competitor, would cut base-case profit by about $15,000 in year one and $40,000 in year three. Currency matters less in the first years, since Tamarack invoices the distributor in dollars, but a stronger dollar would push up retail prices in euros and could slow the distributor's orders. Freight, which the distributor pays, affects Tamarack only indirectly through that same retail price.

What this page is doingIf volumes differ.
7

What Research Suggests

Graham and Harvey (2001), surveying chief financial officers, reported that big companies leaned on discounted cash flow measures while smaller ones kept returning to the simple payback period, which is why both measures are shown. Lu and Beamish (2001) found that small and medium-sized firms expanding abroad often saw performance fall at first before improving with experience, which matches the year-one loss here. Sousa et al. (2008), reviewing export performance research, found that firm capabilities and marketing strategy were important determinants of results, a reminder that the volumes depend partly on how well Tamarack and its distributor execute.

What this page is doingReading the results.
8

Limits of the Projection

The projection rests on interviews and judgment rather than signed orders, so its volumes are educated estimates. It ignores possible gains that are hard to price, such as what Tamarack learns about product design from Alpine rental fleets, which wear snowshoes harder than most owners do, or the credibility a European presence might bring with North American retailers. It also ignores some risks: a warm winter in the Alps would cut reorders, and a competitor could respond with lower prices. Finally, it assumes the plant can build export inventory in spring without disrupting domestic orders, which the readiness assessment judged feasible but which depends on hiring a summer shift. For these reasons the scenarios and decision rules matter more than the single base-case figure.

What this page is doingWhat it cannot capture.
9

Decision Rules

Because volume drives the outcome, the owner should set checkpoints. If the distributor's year-one orders fall below 2,000 pairs, Tamarack should cut the trade fair and review the partnership before committing to year two. If year-two volume exceeds 6,500 pairs, it should consider adding a Nordic distributor in year three. Between those thresholds, the owner should continue as planned and review results after each winter season, comparing actual orders, sell-through at retailers and warranty returns with the forecast. These rules turn the projection from a single prediction into a plan for learning, which suits a small company entering an unfamiliar market for the first time.

What this page is doingWhen to continue or stop.
10

Conclusion

The base case shows a modest first-year loss followed by healthy profits and a positive net present value of about $198,000. The venture's risk is concentrated in volume, so clear checkpoints matter more than precise forecasts. The owner can accept the year-one loss as the price of learning, knowing in advance the point at which he would stop.

What this page is doingA sound bet, if volume comes.
11

References

Graham, J. R., & Harvey, C. R. (2001). The theory and practice of corporate finance: Evidence from the field. Journal of Financial Economics, 60(2-3), 187-243. https://doi.org/10.1016/S0304-405X(01)00044-7

Lu, J. W., & Beamish, P. W. (2001). The internationalization and performance of SMEs. Strategic Management Journal, 22(6-7), 565-586. https://doi.org/10.1002/smj.184

Sousa, C. M. P., Martínez-López, F. J., & Coelho, F. (2008). The determinants of export performance: A review of the research in the literature between 1998 and 2005. International Journal of Management Reviews, 10(4), 343-374. https://doi.org/10.1111/j.1468-2370.2008.00232.x

What the INT 400 Module 6 instructions ask for

The financial projections assignment in INT 400 usually asks you to estimate the financial results of your recommended international strategy. Expect to project sales, costs and profits over several years, identify start-up investments, calculate measures such as payback, break-even, discounted value or return on the money put in, and weigh what could upset the forecast. A strong projection lists every assumption and its source, separates variable from fixed and one-time costs, includes working capital and export-specific costs that are easy to forget, uses a discount rate the client would recognize, runs at least two alternative scenarios and explains the results in plain language for the decision maker.

How this INT 400 Module 6 financial projections assignment example is built

The sample projects Tamarack Snowshoe Works' sales to an Alpine distributor of 3,000, 5,500 and 8,000 pairs over three years at an average price of about $95 a pair, with variable costs of about $52. Export fixed costs include a part-time coordinator, trademark filing, translation, a stand at the Munich winter sports trade fair, demonstration pairs, inventory carrying and travel. The base case loses $13,000 in year one, then earns $126,500 and $237,000, for a net present value of about $198,000 at 12 percent after $60,000 of working capital. A half-volume case loses about $79,000 in present value. The paper uses Graham and Harvey, Lu and Beamish and Sousa and colleagues.

Where the INT 400 Module 6 rubric puts the points

This assignment is commonly scored on the completeness and realism of assumptions, accuracy of calculations, use of financial measures, scenario or sensitivity analysis, interpretation for the client and APA style. Exemplary projections state and source every assumption, show calculations a reader can check, include export-specific and working capital costs, test alternatives and explain what the results imply for the decision. Papers lose points for single-number forecasts, for hidden or unrealistic assumptions such as instant full volume, for leaving out start-up costs, for arithmetic errors and for presenting results without saying what the client should conclude. Decision rules that tell the client when to stop or expand, tied to the forecast, are often what earns the top band.

INT 400 Module 6 help: the mistakes that cost points

List your assumptions before any calculation: volumes by year, price, variable cost per unit, fixed and one-time costs and working capital. Source each one, such as the client's cost records or a freight quote. Build a simple yearly table and check the arithmetic twice. Choose measures the client understands; small business owners often think in payback and annual profit, while NPV shows value over time. Then run at least a pessimistic and an optimistic case, changing the assumptions that matter most, usually volume. Explain the results plainly: what happens if things go well, what happens if they go badly and what would trigger a decision to stop. Round figures sensibly; false precision makes a forecast look less credible, not more.

Get INT 400 Module 6 written to your instructions

Upload the INT 400 Module 6 instructions and your client's cost and price figures. We build a three-year projection with visible assumptions, calculate NPV and payback, run scenarios and explain plainly what the results mean for the decision. About two days; first assignments are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More INT 400 papers and related BS International Business samples

INT 400 Module 6 questions, answered

Where can I find a free INT 400 Module 6 Financial Projections Assignment sample?

The full INT 400 Module 6 assignment is here, projecting three years of an Alpine export entry with NPV, payback and scenarios.

How do you project the financial results of entering a foreign market?

Estimate volumes, prices and costs by year, include start-up and working capital costs, calculate profit and cash flow and test alternative scenarios.

What is net present value?

The value today of future cash flows, discounted at a rate reflecting the firm's cost of capital and risk, minus the initial investment; a positive value suggests the project adds value.

What is a payback period?

The time it takes for a project's cumulative cash flows to recover the initial investment, a simple measure many managers use alongside NPV.

Why do new export ventures often lose money at first?

Start-up costs for marketing, trademarks, staff and inventory come before sales build, and research shows firms often see performance dip early in internationalization.