INT 400 Module 8 Discussion Example

Reviewed by Portia Lambrick, MBA

This INT 400 Module 8 Discussion sample reflects on what an international business capstone taught, beyond the content of the final report. SNHU INT 400 (INT-400) ends the BS International Business with this reflection, asking students to look back at their process as well as their findings. The post looks back on a consulting project for Tamarack Snowshoe Works, a composite Minnesota snowshoe maker, and uses Kolb's experiential learning cycle and Schön's idea of reflective practice to draw out three lessons about personal contacts, communicating with a client and where the most useful evidence came from, then invites peers to name the change they would make if they started over.

CourseINT 400 International Business Project
ModuleModule 8
Paper typeundergraduate capstone reflection post on learning from an applied project
LengthAbout 390 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS International Business
UpdatedOctober 2026

Free sample paper for INT 400 Module 8

1

Module Eight Discussion

Three Things the Snowshoe Project Taught Me

Ten weeks ago, Tamarack Snowshoe Works' owner wanted to take his company global. Last week I handed him a report recommending a distributor in the Alps, with checkpoints. Kolb (1984) pictures learning as a loop that runs from doing something, to thinking it over, to drawing a general rule, to trying that rule again. Looking back through that cycle, three lessons stand out.

What this page is doingLooking back.
2

In our first call, the owner mentioned a friend who runs an outdoor store in Norway, and I caught myself sketching a Nordic plan before I had built any screening. Ellis (2011) documented the same trap: founders tend to spot foreign openings through people they know, which speeds things up but shrinks the menu of options. Writing down the criteria and weights before scoring countries kept me honest, and the Alps came out ahead. I now understand why the method mattered more than any single data source.

What this page is doingLesson one: the friend in Norway.
3

I spent days on the financial tables. When I presented the report, the owner read the one-page recommendation twice and skimmed the tables. Professionals, in one classic account, reflect in action, adjusting while they work (Schön, 1983); I adjusted mid-meeting, talking through the checkpoints rather than the numbers, and the conversation improved. Communication was not a final polish; it was half the work.

What this page is doingLesson two: the first page.
4

The finding that shaped the whole plan, that the plant is full from August to November, came from a simple question I almost did not ask: what do you produce each month? It changed the region, the shipping calendar and the inventory plan. If I had relied on annual figures, I would have recommended a Southern Hemisphere market that orders in our busiest months, a mistake that would only have shown up after the first order.

What this page is doingLesson three: production by month.
5

In my next project I will write the method down before meeting anyone with a favorite answer, draft the first page early and revise it as the evidence grows, and ask operations people the dull monthly questions in the first week rather than the fifth. I would also ask for a test of demand, even a single small shipment, because estimates built from interviews made me less confident than I sounded in the report.

What this page is doingWhat I will do next time.
6

Looking back at your own capstone, what is one thing you would do differently if you started again tomorrow?

What this page is doingFor classmates.
7

References

Ellis, P. D. (2011). Social ties and international entrepreneurship: Opportunities and constraints affecting firm internationalization. Journal of International Business Studies, 42(1), 99-127. https://doi.org/10.1057/jibs.2010.20

Kolb, D. A. (1984). Experiential learning: Experience as the source of learning and development. Prentice Hall.

Schön, D. A. (1983). The reflective practitioner: How professionals think in action. Basic Books.

What the INT 400 Module 8 instructions ask for

The final INT 400 discussion usually asks you to reflect on your capstone experience: what you learned, what went well or poorly, how the program prepared you and how you will use the experience in your career. Prompts may ask you to connect your project to specific courses or competencies. A good reflection names concrete lessons rather than general growth, explains what happened and why, admits mistakes, connects the experience to a framework for learning from practice, says what you would do differently and asks classmates a question that invites honest comparison of their own projects. Some versions also ask which earlier courses proved most useful once the project was underway.

How this INT 400 Module 8 discussion example is built

The sample reflects on a capstone for Tamarack Snowshoe Works using Kolb's four-stage cycle of learning from doing and Schön's idea of reflection in action. It names three lessons. The owner's friend in Norway almost decided the market before the screening existed, a pull Ellis's research on social ties predicts. The owner skimmed the tables but read the first page twice, so communication mattered as much as analysis. And the finding that shaped the whole plan, the August to November capacity squeeze, came from a simple question about production by month. The post asks peers what they would change in their own projects.

Where the INT 400 Module 8 rubric puts the points

Closing reflections in INT 400 are typically marked on depth of reflection, specificity of lessons, honesty about mistakes, connection to course learning and frameworks, implications for future practice and engagement with classmates. Posts that score well describe particular moments, explain why they mattered, use a framework to organize the learning and say what they will do differently. Credit falls for vague statements about growth, for listing tasks completed instead of lessons learned, for avoiding any mistake, for skipping a framework or source and for replies that congratulate a classmate without asking what they would change. A reflection that names a near-mistake and how it was caught tends to read as more honest, and earns more, than one that lists successes.

INT 400 Module 8 help: the mistakes that cost points

Pick two or three moments from your project that changed how you worked, such as a surprise in an interview, a mistake you caught or feedback that stung. For each, describe what happened, why it mattered and what you now understand. A framework such as Kolb's learning cycle or Schön's reflective practice helps organize this without becoming the focus. Be candid about at least one mistake. Say how you will act differently in your next job or project. Connect the lessons to your program where it fits naturally. End by asking classmates what they would do differently, which brings out useful advice for everyone still finishing.

Get INT 400 Module 8 written to your instructions

Send the INT 400 Module 8 prompt and a few notes on how your capstone went. We help you turn the experience into specific lessons, connect them to research on reflective and experiential learning and finish with a prompt that gets peers comparing their own projects. Roughly two days; the first post is complimentary. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More INT 400 papers and related BS International Business samples

INT 400 Module 8 questions, answered

Where can I find a free INT 400 Module 8 Discussion sample?

The complete INT 400 Module 8 reflection is on this page, drawing three lessons from a capstone consulting project for a snowshoe maker.

What is Kolb's experiential learning cycle?

A four-stage loop: something happens to you, you think it over, you draw a general idea from it, and you try that idea out the next time.

What is reflective practice?

Schön's idea that professionals learn by thinking about their actions while acting and afterward, adjusting their approach as situations unfold.

How do you write a good capstone reflection?

Describe specific moments, explain why they mattered and what you learned, admit mistakes, use a framework to organize your thinking and say what you will do differently.

Why reflect on a capstone project?

Reflection turns experience into lessons you can apply in future work and helps you explain your skills to employers with concrete examples.