BUS 210 Module 8 Final Reflection Journal Example

Reviewed by Portia Lambrick, MBA

This BUS 210 Module 8 journal closes the course with an honest look back and a plan forward. SNHU BUS 210 (BUS-210) commonly ends the BS Business Administration management course with a reflection on growth, and the composite writer, the same shift lead from Module 3, compares how she managed and led eight weeks ago with how she works now. She names what changed: she asks experienced associates to plan the weekly restock and holds short one-on-ones. She also names what did not change: she still takes over during a rush. Course concepts, path-goal theory and the four functions, explain both. The entry closes with a development goal for the next six months, leading the store's Saturday huddle without stepping in, and how she will know she has met it.

CourseBUS 210 Managing and Leading in Business
ModuleModule 8
Paper typeClosing reflective journal
LengthAbout 390 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for BUS 210 Module 8

1

Module Eight Journal: Looking Back, Looking Ahead

Journal: What changed, and what did not

Eight weeks ago I described myself as a directive shift lead who kept the floor organized but struggled to let experienced people work their own way. Looking back, two things have changed, and one has not.

The first change is how I handle our experienced groomer. Instead of telling her how to order her appointments, I now tell her what I need, every client finished on time with no complaints, and leave the method to her. Last week she suggested moving nail trims to the end of each groom to cut rework, and it worked. Path-goal thinking helped here: she did not need direction, she needed room. More broadly, I now think of my job as the four management functions plus the people inside them (Robbins & Coulter, 2021), not just a checklist of tasks to assign.

The second change is how I use goals. I used to say things like "let's push grooming" at the start of a shift. Now I say "we have six open grooming slots today; let's fill four," and I tell the team at closing how we did. Specific, challenging goals with feedback tend to produce better performance than vague encouragement (Locke & Latham, 2002), and the team clearly responds better to a number they can hit.

What has not changed is how I react when something goes wrong. On a bad day I still take over and do the work myself instead of coaching. Under pressure I fall back on the habit that made me successful as an associate, which is exactly the habit that limits me as a leader. I understand the reason, but understanding it has not been enough to stop it.

My development goal for the next six months is to coach instead of rescue. When an associate struggles with a task during a busy shift, I will ask one question before stepping in, and I will keep a simple tally of how often I coach versus take over, aiming for coaching at least two times in three by March 31. I will ask my store manager to review the tally with me monthly, because individual attention from a leader is one of the things that most consistently builds commitment (Judge & Piccolo, 2004), and I would like to receive some of that too.

What this page is doingThe entry offers evidence of change in two behaviors, names one habit that has not changed, and ends with a goal written in the course's own SMART terms. Honest acknowledgment of what remains unresolved is what separates reflection from summary.
2

References

Judge, T. A., & Piccolo, R. F. (2004). Transformational and transactional leadership: A meta-analytic test of their relative validity. Journal of Applied Psychology, 89(5), 755-768. https://doi.org/10.1037/0021-9010.89.5.755

Locke, E. A., & Latham, G. P. (2002). Building a practically useful theory of goal setting and task motivation: A 35-year odyssey. American Psychologist, 57(9), 705-717. https://doi.org/10.1037/0003-066X.57.9.705

Robbins, S. P., & Coulter, M. (2021). Management (15th ed.). Pearson.

What the BUS 210 Module 8 instructions ask for

In BUS 210 the last journal looks back across eight weeks of managing and leading and forward to the next six months. Many prompts ask what you learned, how it has changed your practice and what you will develop next. Journals are typically private between you and the instructor, so the first person is expected. Cite course concepts where you use them. Most BUS 210 entries run a few hundred words. Use specific examples from work rather than course topics. The BUS 210 final journal prompt lists guiding questions, and answering them with one concrete change and one honest gap makes a stronger entry.

How this BUS 210 Module 8 final reflection journal example is built

The journal opens by returning to the writer's Module 3 entry and the directive habit she named there. The second paragraph describes what changed with evidence: the senior associate now plans the restock, and the stockroom runs better. The third names what did not change: during a Saturday rush she still takes over tasks others could handle. A sentence uses path-goal theory to explain why: under time pressure she reverts to the directive style that served her as a new lead. The fourth paragraph sets a six-month goal, leading the Saturday huddle and then stepping back for the rest of the shift, with a measure: asking two associates each month whether they had room to decide. The entry closes with what the course taught her about leadership as practice.

Where the BUS 210 Module 8 rubric puts the points

BUS 210 grades the final journal on how honestly growth is examined, how well course ideas explain it and the plan for what comes next, with SNHU's four levels in each BUS 210 row. Depth rewards honest comparison of before and after with specific evidence, including what did not change. Connection earns credit when concepts explain the writer's experience accurately, such as path-goal theory explaining her rush-hour habit. The plan row looks for a goal that is specific, time-bound and measurable. Writing includes clarity and citation. Instructors often value an entry that admits a gap more than one that claims complete transformation, since the course treats leadership as continuing practice.

BUS 210 Module 8 help: the mistakes that cost points

Final journals often lose points by listing every course topic without showing a change in the writer's behavior. Another common gap is claiming complete transformation, which reads as unexamined. Some students set a development goal with no measure or date. Others skip course concepts entirely. Watch privacy; coworkers should not be identifiable. Finally, return to an earlier entry if you wrote one, because a BUS 210 instructor can see growth most clearly when the final journal tests a habit named weeks earlier and reports honestly on what changed and what still needs work. Give your six-month goal a date and a measure.

Get BUS 210 Module 8 written to your instructions

Send the BUS 210 Module 8 journal or final reflection prompt and rubric. A reflective entry that ties your experience to course concepts comes back within 24 to 48 hours; the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More BUS 210 papers and related BS Business Administration samples

BUS 210 Module 8 questions, answered

What does the BUS 210 final journal usually ask?

The last journal usually invites students to look back on their own management and leadership style, how course concepts changed their practice or thinking, and what they plan to develop next. Instructors value honest, specific reflection over general praise for the course.

How do I make a reflection specific?

Describe concrete situations before and after, name what you did differently, connect each change to a concept from the course, and admit what has not changed. Ending with a specific goal and a way to measure it shows that the reflection will lead to action.

Should a reflective journal include citations?

When a journal draws on theories or research from the course, citing them briefly shows the connection between experience and concepts. The tone remains personal and in the first person, but ideas taken from sources should still be credited.

Where can I find a free BUS 210 Module 8 journal sample?

The full entry is on this page: a shift lead compares her management and leadership now with eight weeks earlier, names what did not change and sets a measurable six-month goal. Use it to see a reflection with evidence.

How do I write a measurable development goal?

Name a behavior you can observe, a time frame and a check you can actually run, for example leading the Saturday huddle every week for six months and asking two associates monthly whether they had room to make decisions.