| Course | QSO 455 Integrated Supply Chain Management |
|---|---|
| Module | Module 5 |
| Paper type | undergraduate assignment deciding where and in what form to hold inventory for an uncertain product, using scenarios, postponement and expected costs |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 455 Module 5
Finished Machines or Kits on a Shelf: Positioning Snow Thrower Inventory at Ashby Falls
[Student Name]
Southern New Hampshire University
QSO 455: Integrated Supply Chain Management
Inventory Positioning Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Finished Machines or Kits on a Shelf: Positioning Snow Thrower Inventory at Ashby Falls
Introduction
Ashby Falls Outdoor Power builds about 205,000 snow throwers a year and sells between about 167,000 and 227,000, depending on the winter. Today it builds almost all of them from April to September, ships them to dealers and chains before the first snow and absorbs the result: markdowns and carrying in a mild winter, lost sales in a heavy one. This assignment decides how much to build before the season, how much to hold as engines and kits for building later and where finished machines should wait.
Demand Scenarios
Snow thrower demand scenarios
| Scenario | Probability | Demand |
|---|---|---|
| Low snow | 35% | 167,000 |
| Normal | 40% | 205,000 |
| Heavy snow | 25% | 227,000 |
The scenarios come from twenty years of sales against snowfall in Ashby Falls' markets and from the seasonal outlook issued each fall. Early-season sell-through is a strong signal: by late November, sales in the first heavy-snow markets predict the season's total within about 8 percent.
Costs
A finished machine left unsold at the end of the season costs about $163 in markdown, carrying to the next season and handling, the figure implied by last year's $6.2 million on 38,000 units. A sale missed in a heavy winter costs about $177 in lost margin, from the $3.9 million lost on 22,000 units two winters ago. An engine and kit held at the plant and not used carries over to the next season at a cost of about $38, mostly carrying and the risk of model changes. Assembling a kit late, from October to December, costs about $9 more than assembling it in the regular schedule, because it requires a second shift.
Option A: Build Everything Before the Season
Building 205,000 machines before the season leaves 38,000 unsold in a low-snow winter, matches demand in a normal one and falls 22,000 short in a heavy one. The expected cost is 0.35 × 38,000 × $163 plus 0.25 × 22,000 × $177, about $2.17 million plus $0.97 million, or about $3.14 million a year.
Option B: Build Part, Hold Kits for the Rest
Fisher et al. (1997) showed, in a fashion company facing highly uncertain demand, that committing only part of production before the season and using reactive capacity once early sales revealed demand could sharply reduce the combined cost of overstock and stockouts. Ashby Falls can apply the same logic, because its uncertainty, like the fashion company's, is largely resolved by early-season sales. It would build about 150,000 finished machines before October, about 90 percent of low-snow demand, and hold engines and kits for up to 60,000 more at the plant, with capacity to assemble up to 60,000 in October to December on a second shift.
Option B by scenario
| Scenario | Kits assembled late | Shortage | Unused kits | Cost |
|---|---|---|---|---|
| Low snow | 17,000 | 0 | 43,000 | $1.79 million |
| Normal | 55,000 | 0 | 5,000 | $0.69 million |
| Heavy snow | 60,000 | 17,000 | 0 | $3.55 million |
In each scenario the cost includes unused kits at $38, shortages at $177 and the $9 premium on kits assembled late. In a low-snow winter no finished machines are left over, only kits; in a heavy one the company is still short, by 17,000 rather than 22,000, because late assembly capacity tops out at 60,000. Weighting by probability, the expected cost is about $1.79 million a year, about $1.35 million less than Option A. The kit quantity is matched to the second shift's capacity of 60,000, since kits beyond what can be assembled in the season would only add carrying cost.
The result depends on assumptions that should be tested. If late assembly capacity and kits rose to 75,000, the heavy-snow shortage would fall to about 2,000 and the expected saving would rise to about $1.56 million. If kits cost more to hold than estimated, say $60 rather than $38, the saving falls to about $980,000, still large. Kit holding cost and late capacity are the two assumptions to confirm first.
Where Finished Machines Should Wait
Graves and Willems (2000) showed how to place safety stocks in a multi-stage supply chain so that each stage holds the inventory that protects downstream demand at least cost, often holding less at the end of the chain when upstream stages can replenish quickly. Today about 70 percent of Ashby Falls' finished snow throwers sit on dealer floors by November, financed by dealers at about $18 a machine for the season, and dealers whose stores get no snow cannot easily send machines to dealers whose stores do. Under the new approach, dealers would receive an opening order of about half their expected season, with the rest held at Ashby Falls' warehouse and shipped weekly as they sell. Machines stay where they can still go to the region that gets snow.
Information Requirements
Reacting in October and November requires knowing what is selling. Lee et al. (1997) showed that decisions based on orders rather than end-customer sales distort demand signals up the chain. The kit release decision must therefore use weekly sell-through from the chains and the largest dealers, not their orders, which is why the collaboration proposed in Module 4 matters to this decision.
Requirements From Suppliers and Operations
The engine supplier must agree to supply up to 60,000 engines for late assembly on a flexible schedule, with Ashby Falls committing to take any unused engines the following season. The plant must staff a second fall shift, using temporary workers trained in the summer. The warehouse needs space for about 60,000 kits, about a third of the space the same number of finished machines would take, and the kit quantity should never exceed what the fall shift can build.
Recommendation
Ashby Falls should build about 150,000 snow throwers before the season, hold engines and kits for up to 60,000 more at the plant, release kits to a second shift from October on weekly sell-through and hold half of dealers' expected finished stock at its own warehouse. The approach cuts the expected annual cost of uncertainty by about $1.35 million and removes most of the risk of another 38,000-machine season.
References
Fisher, M., Hammond, J., Obermeyer, W., & Raman, A. (1997). Configuring a supply chain to reduce the cost of demand uncertainty. Production and Operations Management, 6(3), 211-225. https://doi.org/10.1111/j.1937-5956.1997.tb00427.x
Graves, S. C., & Willems, S. P. (2000). Optimizing strategic safety stock placement in supply chains. Manufacturing & Service Operations Management, 2(1), 68-83. https://doi.org/10.1287/msom.2.1.68.23267
Lee, H. L., Padmanabhan, V., & Whang, S. (1997). Information distortion in a supply chain: The bullwhip effect. Management Science, 43(4), 546-558. https://doi.org/10.1287/mnsc.43.4.546
What the QSO 455 Module 5 instructions ask for
The QSO 455 Module 5 assignment usually asks students to decide how much inventory to hold, where in the supply chain and in what form. Expect to describe demand and its uncertainty, identify possible stocking points such as suppliers, plants, warehouses and customers, consider holding inventory as components or finished goods, estimate holding, overstock and shortage costs, compare options using expected costs or service levels and recommend an inventory strategy. Strong assignments use scenarios or distributions rather than a single forecast, value the flexibility of holding inventory in a less finished form, include the cost of reacting late, consider who in the chain bears holding costs and identify what the strategy requires from suppliers and operations.
How this QSO 455 Module 5 inventory positioning assignment example is built
The assignment positions snow thrower inventory at Ashby Falls Outdoor Power, a fictional Wisconsin manufacturer whose demand ranges from about 167,000 units in a low-snow winter to about 227,000 in a heavy one. Building all 205,000 machines before the season has an expected cost of about $3.14 million a year in markdowns, carrying and lost sales across the three scenarios. Building 150,000 finished machines and holding engines and kits for up to 60,000 more at the plant, assembled from October as sell-through arrives, brings expected cost to about $1.79 million after a $9 premium for late assembly, saving about $1.35 million a year. Finished stock also moves from dealer floors toward the company warehouse. Graves and Willems, Fisher and colleagues and Lee and colleagues support the analysis.
Where the QSO 455 Module 5 rubric puts the points
Marks for the QSO 455 inventory positioning assignment go to a demand picture that shows its uncertainty, realistic stocking points and forms, consistent cost estimates for holding, overstock and shortage, expected costs calculated correctly across scenarios, a fair accounting of the cost of reacting late, attention to who bears holding costs and a recommendation with its requirements. The strongest assignments show the result under each scenario as well as the expected value. Credit drops when a single forecast is used, components and finished goods are treated alike, late assembly is assumed free, dealers' costs are ignored or the requirements for suppliers and operations are missing. Tables, clear writing and APA citations complete the grade.
QSO 455 Module 5 help: the mistakes that cost points
Start by describing demand as a range or scenarios with probabilities, not one number. List where inventory could sit, at the supplier, the plant, a warehouse or the customer, and in what form, materials, components or finished goods. Estimate the costs: holding by form and location, the loss on each unit left unsold and the margin lost on each sale missed. Calculate the expected cost of each option across scenarios, and include the extra cost of making or moving goods late. Look at results under each scenario, not only the average. Then state what the chosen option requires, such as supplier flexibility or extra shifts. A common mistake is choosing by holding cost alone; another is assuming late production costs nothing.
Get QSO 455 Module 5 written to your instructions
Share the QSO 455 Module 5 instructions and your product and demand data. A writer sets up demand scenarios, compares where and in what form inventory could be held, calculates expected costs of overstock, shortage and holding, tests postponement or reactive capacity and recommends the inventory position with its requirements, citing supply chain research. Your first QSO 455 paper is free, sent within about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 455 papers and related BS Operations Management samples
- QSO 455 Module 1 Discussion: What Functional Silos Cost a Seasonal Manufacturer
- QSO 455 Module 2 Integration Assessment Assignment: How Integrated the Chain Really Is
- QSO 455 Module 3 Project One: A Sales and Operations Planning Process
- QSO 455 Module 4 Discussion: Forecasting Jointly With the Big-Box Chains
- QSO 455 Module 6 Discussion: One Engine Supplier Across the Pacific
- QSO 455 Module 7 Project Two: The Integrated Supply Chain Plan
- QSO 455 Module 8 Discussion: Measuring the Chain as One System
- OL 215 Module 6 Control Systems Assignment: Controlling With Measures
- QSO 325 Module 5 Control Chart Assignment: Coating Thickness In and Out of Control
- INT 113 Module 3 Milestone One: Trade Rules Between Bozeman and Tokyo
- QSO 420 Module 5 Variance Analysis Assignment: Month Seven, Five Control Accounts
QSO 455 Module 5 questions, answered
Where can I find a free QSO 455 Module 5 Inventory Positioning Assignment sample?
The complete QSO 455 Module 5 assignment is on this page: positioning snow thrower inventory at an invented manufacturer with scenarios.
What is postponement in supply chains?
Delaying final assembly, configuration or distribution until demand is better known, holding inventory in a generic or less finished form that can be committed later.
What is reactive capacity?
Production capacity available after early demand signals arrive, used to make more of what is selling, which reduces the amount that must be committed before demand is known.
How are expected costs calculated across scenarios?
By calculating the cost of each option under each demand scenario and weighting each result by the scenario's probability, then adding them.
Where should safety stock be placed in a supply chain?
At the points where it protects the most demand for the least cost, often upstream in less finished forms when downstream variation can be absorbed by fast replenishment.