QSO 455 Module 2 Integration Assessment Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 455 Module 2 Integration Assessment Assignment sample assesses an organization's internal, customer and supplier integration with evidence, scores and process measures and identifies the gaps that matter most. SNHU QSO 455 (QSO-455) assigns this assessment in Module 2, before its BS Operations Management students design any fix. The subject is Ashby Falls Outdoor Power, a two-season manufacturer with about $310 million in sales and an invented Wisconsin maker of snow throwers and lawn mowers whose last two winters went wrong in opposite directions. The paper scores twelve practices, backs each score with records, adds SCOR-style measures and ranks the gaps.

CourseQSO 455 Integrated Supply Chain Management
ModuleModule 2
Paper typeundergraduate assignment assessing an organization's internal, customer and supplier integration with evidence, scores and process metrics and identifying the gaps that matter most
LengthAbout 1,090 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 455 Module 2

1

Four Forecasts and One Factory: An Integration Assessment of Ashby Falls Outdoor Power

[Student Name]

Southern New Hampshire University

QSO 455: Integrated Supply Chain Management

Integration Assessment Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe scores, measures and findings for Ashby Falls Outdoor Power in this QSO 455 assignment are invented.
2

Four Forecasts and One Factory: An Integration Assessment of Ashby Falls Outdoor Power

Introduction

Ashby Falls Outdoor Power ran short of snow throwers in one winter and was left with 38,000 too many in the next. Management's first explanation was the weather. The weather explains why demand moved; it does not explain why the company could not respond. This assignment assesses how integrated Ashby Falls' supply chain is, inside the company and with its customers and suppliers, using twelve practices scored from evidence, adds process measures and ranks the gaps that matter most.

What this page is doingExplains why the weather is not the whole story.
3

The Supply Chain

Ashby Falls builds snow throwers from April to November and mowers from November to May on two assembly lines in Fond du Lac. Steel comes from two Midwest mills, plastics from local molders, mower engines from a domestic supplier and snow thrower engines from a single supplier in Asia with a 16-week lead time. Finished machines go to a company warehouse and then to about 1,100 independent dealers, who sell about 55 percent of volume, and to two home-improvement chains, which sell the rest through their own distribution centers. Dealers finance their floor stock through a lender, so unsold machines cost them interest.

What this page is doingDescribes the main flows.
4

Framework and Evidence

Flynn et al. (2010) found that supply chain integration has distinct internal, customer and supplier dimensions, that their effects on performance differ and that internal integration underpins the other two. The assessment follows those three dimensions, with four practices in each, scored from 1, absent, to 5, fully practiced. Evidence came from interviews with fourteen managers in sales, operations, purchasing, finance and logistics, three dealers and buyers at both chains, and from twelve months of forecasts, orders and inventory records.

What this page is doingExplains how scores were set.
5

Internal Integration

Internal integration

PracticeScoreEvidence
One agreed demand forecast1Sales, operations, purchasing and finance each used a different number for the season
Regular cross-functional planning2Monthly production meeting without sales or finance
Shared measures across functions2Sales measured on shipments, operations on cost per unit, purchasing on price
Joint decisions on inventory and capacity3Made by the operations director, with sales consulted informally
Average2.0

The single most telling finding is the number of forecasts. In April of last year, sales forecast 228,000 snow throwers, operations planned to build 205,000, purchasing ordered engines for 200,000 and finance's budget assumed 190,000. Each forecast was presented in a different meeting to a different audience, and nobody compared them. Each was defensible; none was the company's plan.

What this page is doingScores the company's own coordination.
6

Customer Integration

Customer integration

PracticeScoreEvidence
Point-of-sale data from chains2Monthly spreadsheets, three weeks old on arrival
Dealer sell-through and stock data1Not collected; inferred from reorders
Joint forecasting with major customers2Annual preseason meeting with each chain, no updates
Joint promotion and markdown planning4Coordinated with both chains each fall
Average2.3

Ashby Falls learns what consumers are buying weeks after it happens and, for dealers, only when they reorder. In a weather-driven season, that delay is the difference between reacting in November and reacting in January.

What this page is doingScores coordination with dealers and chains.
7

Supplier Integration

Supplier integration

PracticeScoreEvidence
Forecasts shared with key suppliers2Engine supplier receives purchase orders only
Coordinated capacity planning3Steel mills hold allocations; engine supplier does not
Supplier involvement in problem solving3Quarterly reviews with domestic suppliers
Flexible contracts for seasonal volume3Plastics contract allows 20% swing; engine contract does not
Average2.8

Supplier integration is the strongest dimension, mostly because the domestic suppliers are close and long-standing. The weak point is the engine supplier, which sees no forecast and has no flexibility built into its contract.

What this page is doingScores coordination with suppliers.
8

How the Gaps Show Up in a Season

A walk through last year's snow thrower season shows how the low scores combine. In April, purchasing committed to engines for 200,000 machines, because the contract required a commitment and the purchasing forecast was the only one available to it. Production built level from April to September, finishing about 205,000. In September and October, dealers and chains took delivery of most of them, and sales recorded record shipments. In November, the weather turned mild across most markets. The chains' November sales data arrived in late December, by which time their distribution centers had already stopped reordering; dealers simply stopped reordering, which Ashby Falls noticed only in January. By then nothing could be done but discount. At every step, a better connection would have changed a decision: a single plan in April, sell-through data in November and a flexible engine contract that would have allowed a smaller first commitment.

What this page is doingFollows one season through the weak links.
9

Process Measures

Huan et al. (2004) describe the SCOR model's structure of plan, source, make and deliver processes and its standard measures, which allow companies to measure performance across the chain rather than function by function.

Process measures, last twelve months

MeasureSnow throwersMowers
Forecast error, absolute, preseason forecast against actual34%12%
Engine volume committed before first snowfall71%Not applicable
Finished goods inventory at season end, units38,0006,400
Order fill rate to dealers in peak month91%97%
Cash-to-cash cycle, company total118 days

The contrast between the two products is the central finding. Mower demand follows spring weather too, but much less sharply, and Ashby Falls plans it adequately. Snow thrower demand varies far more, but the company plans it the same way, committing most of its engines and production months before it can know what the winter will bring.

What this page is doingMeasures how the chain performs.
10

Ranking the Gaps

Frohlich and Westbrook (2001) found that the widest arcs of integration, toward both suppliers and customers, were linked to the largest performance gains. Ashby Falls cannot widen its arcs before it fixes its center. The gaps are therefore ranked in this order. First, one agreed forecast and plan, through a sales and operations planning process, because every other improvement depends on it. Second, weekly sell-through data from the chains and the largest dealers, because it would allow reaction during the season. Third, a forecast-sharing and flexible-volume arrangement with the engine supplier, because engines are the longest lead time and the main reason commitments are made so early. Fourth, shared measures across functions, so that sales is not rewarded for shipping machines that will be marked down.

What this page is doingPrioritizes for action.
11

Conclusion

Ashby Falls is weakly integrated, with internal integration the weakest of all: four forecasts and no forum to reconcile them. Customer integration is limited by slow data and supplier integration by an inflexible engine contract. Snow thrower forecast error of 34 percent and 71 percent of engines committed before the first snow show the cost. The first fix is internal: a sales and operations planning process, which Project One designs.

What this page is doingSummarizes the assessment.
12

References

Flynn, B. B., Huo, B., & Zhao, X. (2010). The impact of supply chain integration on performance: A contingency and configuration approach. Journal of Operations Management, 28(1), 58-71. https://doi.org/10.1016/j.jom.2009.06.001

Frohlich, M. T., & Westbrook, R. (2001). Arcs of integration: An international study of supply chain strategies. Journal of Operations Management, 19(2), 185-200. https://doi.org/10.1016/S0272-6963(00)00055-3

Huan, S. H., Sheoran, S. K., & Wang, G. (2004). A review and analysis of supply chain operations reference (SCOR) model. Supply Chain Management: An International Journal, 9(1), 23-29. https://doi.org/10.1108/13598540410517557

What the QSO 455 Module 2 instructions ask for

The QSO 455 Module 2 assignment usually asks students to assess how integrated an organization's supply chain is. Expect to describe the chain and its main flows, evaluate integration within the company and with customers and suppliers, often using a framework or scale, support the evaluation with evidence such as interviews, documents and data, measure process performance with indicators such as forecast accuracy, inventory, cycle times and delivery, identify the most important gaps and connect them to research on integration and performance. Strong assessments score specific practices rather than general impressions, back every score with evidence, separate internal from external integration, link gaps to measurable costs and rank them for action.

How this QSO 455 Module 2 integration assessment assignment example is built

The assignment assesses integration at Ashby Falls Outdoor Power, a fictional Wisconsin snow thrower and mower maker. Twelve practices are scored from interviews and records. Internal integration is weakest, at 2.0 of 5, because sales, operations, purchasing and finance plan from four different forecasts. Customer integration scores 2.3: the two chains' sales data arrive monthly in spreadsheets and dealer sell-through not at all. Supplier integration scores 2.7: the engine supplier receives orders but no forecast. Process measures show snow thrower forecast error of 34 percent, a cash-to-cash cycle of 118 days and 71 percent of engine volume committed before the first snow. Flynn, Huo and Zhao, Frohlich and Westbrook and Huan, Sheoran and Wang guide the assessment.

Where the QSO 455 Module 2 rubric puts the points

Marks for the QSO 455 integration assessment reward a description of the chain that a reader could draw, a structured evaluation of internal, customer and supplier integration, scores backed by specific evidence, relevant process measures calculated correctly, gaps ranked by their effect on cost and service and accurate use of integration research. The strongest assessments show how weak internal integration limits what external integration can achieve. Credit drops when scores rest on impressions, evidence is missing, internal and external integration are blended, measures are absent or gaps are listed without priority. Tables, clear writing and APA citations are part of the mark as well.

QSO 455 Module 2 help: the mistakes that cost points

Start by listing the practices that make a chain integrated: inside the company, a shared forecast, joint planning and common measures; with customers, shared sales and inventory data and joint planning; with suppliers, shared forecasts, coordinated capacity and joint problem solving. Score each on a simple scale, and for every score write the evidence: what you saw, who said it, which report shows it. Add measures such as forecast error, inventory days, cash-to-cash cycle and on-time delivery. Then rank the gaps by what they cost. Look at the order: if internal integration is weak, external sharing will not help much yet. A common mistake is scoring from impressions; another is recommending everything at once.

Get QSO 455 Module 2 written to your instructions

Share the QSO 455 Module 2 instructions and describe the organization. A writer builds an assessment of internal, customer and supplier integration, scores each practice with evidence, adds process measures such as forecast error and cash-to-cash cycle, ranks the gaps by their cost and links the findings to integration research. Your first QSO 455 paper is free, finished within about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 455 papers and related BS Operations Management samples

QSO 455 Module 2 questions, answered

Where can I find a free QSO 455 Module 2 Integration Assessment Assignment sample?

The complete QSO 455 Module 2 assignment is on this page: an assessment of internal, customer and supplier integration at an invented manufacturer.

What are the dimensions of supply chain integration?

Commonly internal integration across a firm's functions, customer integration with buyers and supplier integration with vendors, each covering information sharing and joint planning.

What is the cash-to-cash cycle?

The number of days between paying suppliers for materials and collecting cash from customers, calculated as inventory days plus receivable days minus payable days.

What is the SCOR model?

The Supply Chain Operations Reference model, which describes supply chain processes such as plan, source, make, deliver and return and defines standard measures for them.

Why does internal integration come first?

Because a company that cannot agree on one plan internally cannot share a reliable plan with suppliers or customers, so external collaboration depends on it.