Module Six Discussion
A Fire in February, Not August
Every snow thrower Ashby Falls sells uses an engine from one plant in Asia. The supplier is good: its engines are reliable and its price is low. But its lead time is 16 weeks, it receives our purchase orders and nothing else, and our contract commits us to volumes in April with no flexibility.
Two years ago a fire in the supplier's paint shop shut the plant for six weeks. It happened in February, when we were building mowers with domestic engines, so we barely noticed. If it had happened in August, at the peak of the snow thrower build, we would have lost about 40,000 machines, roughly a fifth of a season and perhaps $7 million in margin, because no other engine fits our frames without redesign.
Tang (2006), reviewing supply chain risk management, distinguishes robust strategies that help in normal times as well as in disruptions from those that only pay off when something goes wrong. A strategic stock of 15,000 engines is the second kind: it would cost about $340,000 a year to hold and would cover only about three weeks of building. A second source is more robust. A domestic engine maker has an engine that fits our largest model with modest changes, about 30 percent of volume, at about $12 more per engine, or about $740,000 a year at that volume. A flexible contract with the current supplier, with monthly forecasts shared and 20 percent volume flexibility, would also help. Lambert and Cooper (2000) describe supplier relationship management as a process of structuring relationships deliberately with key suppliers, and this one has never been structured at all.
Qualify the domestic engine for the large model and renegotiate the main contract for shared forecasts and flexible volume. The domestic engine's short lead time also gives us reactive capacity for late assembly, which Fisher et al. (1997) showed is valuable when demand is this uncertain.
What would a disruption at the worst possible time of year cost your company?
References
Fisher, M., Hammond, J., Obermeyer, W., & Raman, A. (1997). Configuring a supply chain to reduce the cost of demand uncertainty. Production and Operations Management, 6(3), 211-225. https://doi.org/10.1111/j.1937-5956.1997.tb00427.x
Lambert, D. M., & Cooper, M. C. (2000). Issues in supply chain management. Industrial Marketing Management, 29(1), 65-83. https://doi.org/10.1016/S0019-8501(99)00113-3
Tang, C. S. (2006). Perspectives in supply chain risk management. International Journal of Production Economics, 103(2), 451-488. https://doi.org/10.1016/j.ijpe.2005.12.006
What the QSO 455 Module 6 instructions ask for
The QSO 455 Module 6 discussion usually concerns supply chain risk and resilience: identifying vulnerabilities such as single sources, long lead times or concentrated geography, estimating their impact and choosing mitigation strategies. Strong posts describe a specific risk with its likelihood and potential cost, explain why timing matters, compare mitigation options such as second sources, flexible contracts, safety or strategic stock and supplier development on cost and effect, consider the relationship with the existing supplier and draw on research about supply chain risk management. A good reply asks a classmate what a disruption at the worst possible time would cost their company.
How this QSO 455 Module 6 discussion example is built
The post examines the single supplier of every snow thrower engine used by Ashby Falls Outdoor Power, a fictional Wisconsin manufacturer: a plant in Asia with a 16-week lead time, no forecast sharing and no flexibility. A fire there two years ago shut it for six weeks in February, when Ashby Falls was building mowers. In August, the same outage would have cost about 40,000 machines. The post compares a second source, a flexible-volume contract and a strategic stock of engines. Tang's review of supply chain risk management, Lambert and Cooper on managing supplier relationships and Fisher and colleagues on flexibility under uncertain demand support a recommendation to qualify a domestic engine for one model while renegotiating the main contract.
Where the QSO 455 Module 6 rubric puts the points
The QSO 455 Module 6 thread is graded on a specific risk with its likelihood and potential cost, attention to timing, a comparison of mitigation options on cost and effect, consideration of the existing supplier relationship, research that tests the recommendation and replies asking what a badly timed outage would cost a classmate's company. The best posts show that a mitigation can also add everyday flexibility. Posts lose marks for listing risks without estimates, proposing dual sourcing as free, ignoring the current supplier's response or replying with agreement only. Grammar and APA citations count too.
QSO 455 Module 6 help: the mistakes that cost points
Start with one risk and describe it concretely: which part, which supplier, where, with what lead time and what alternatives. Estimate how likely a disruption is and what it would cost, and consider when it would hurt most; a seasonal business can be ruined by bad timing. Then compare ways to reduce the risk: a second source, a contract with flexible volume and shorter commitments, a strategic stock of the part or helping the supplier strengthen its own plant. Price each and say what it protects. Consider how the current supplier will react. Recommend a combination and who will manage it. A common mistake is treating risk as a list of what could go wrong; another is assuming a second source costs nothing to qualify. Close by asking classmates about their worst-timed disruption.
Get QSO 455 Module 6 written to your instructions
Paste the QSO 455 Module 6 prompt and describe the supply risk you want to examine. A writer estimates its likelihood and impact, compares mitigation options such as dual sourcing, flexible contracts and strategic stock on cost and benefit, recommends a combination and explains how it would be managed, citing research on supply chain risk, and asks QSO 455 classmates a question. Your first QSO 455 post is free, delivered within roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 455 papers and related BS Operations Management samples
- QSO 455 Module 1 Discussion: What Functional Silos Cost a Seasonal Manufacturer
- QSO 455 Module 2 Integration Assessment Assignment: How Integrated the Chain Really Is
- QSO 455 Module 3 Project One: A Sales and Operations Planning Process
- QSO 455 Module 4 Discussion: Forecasting Jointly With the Big-Box Chains
- QSO 455 Module 5 Inventory Positioning Assignment: Where to Hold Snow Throwers
- QSO 455 Module 7 Project Two: The Integrated Supply Chain Plan
- QSO 455 Module 8 Discussion: Measuring the Chain as One System
- INT 422 Module 3 Milestone One: What Gives Larkspur an Edge Abroad?
- QSO 450 Module 1 Discussion: What Transportation Costs and Why It Matters
- ACC 425 Module 4 Project One: An Interview Outline for a Corroborative Witness
- MKT 225 Module 5 Milestone Two: Channel Strategy and Budget
QSO 455 Module 6 questions, answered
Where can I find a free QSO 455 Module 6 Discussion sample?
This page holds the full QSO 455 Module 6 post: single-source engine risk at an invented snow thrower maker and how to reduce it.
What is single sourcing risk?
The vulnerability created when a company depends on one supplier for a part, so that any disruption at that supplier stops the company's production.
What are common supply risk mitigation strategies?
Dual or multiple sourcing, flexible contracts, safety or strategic stock, supplier development and monitoring, nearshoring and designing products to use interchangeable parts.
Why does timing matter in supply disruptions?
For seasonal products, a disruption during the build or selling season can cost a large share of annual sales, while the same disruption at another time may cost little.
What is supply chain resilience?
The ability of a supply chain to prepare for, respond to and recover from disruptions while continuing to serve customers.