QSO 325 Module 5 Control Chart Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 325 Module 5 Control Chart Assignment sample builds control charts for a process measure, interprets whether the process is stable and calculates its capability. SNHU QSO 325 (QSO-325) assigns statistical process control in Module 5 of its BS Operations Management continuous improvement course. The process is powder coating at Maumee Playworks, an invented Fort Wayne maker of playground structures, where coating thickness must fall between 2.5 and 4.0 mils. X-bar and R charts built from 25 hourly subgroups reveal four out-of-control points linked to color changes and humidity. Once special causes are removed, the capability indices show a process that could meet specification but runs too close to the lower limit.

CourseQSO 325 Continuous Improvement Tools and Techniques
ModuleModule 5
Paper typeundergraduate assignment building control charts for a process measure, interpreting stability and calculating process capability
LengthAbout 1,120 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 325 Module 5

1

Thin by Design: Control Charts and Capability for Powder-Coat Thickness at Maumee Playworks

[Student Name]

Southern New Hampshire University

QSO 325: Continuous Improvement Tools and Techniques

Control Chart Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingEvery thickness reading, limit and index for Maumee Playworks in this QSO 325 assignment is invented.
2

Thin by Design: Control Charts and Capability for Powder-Coat Thickness at Maumee Playworks

Introduction

Powder-coat thickness at Maumee Playworks must fall between 2.5 and 4.0 mils, thousandths of an inch, on every steel post, rail and deck. Coating thinner than 2.5 mils leaves bare spots and weakens corrosion protection; coating thicker than 4.0 mils wastes powder and can chip. Project One found that thin coverage is the most common coating defect, yet nothing measures thickness during production; inspectors find thin parts only at the end of the line. This assignment applies statistical process control to coating thickness: it builds X-bar and R charts, interprets them, investigates out-of-control points and calculates process capability.

What this page is doingStates the measure and the purpose.
3

Data

During 25 production hours over five days in May, an inspector used a magnetic thickness gauge to measure five randomly chosen parts each hour as they left the curing oven, at the same marked spot on each part. The five readings each hour form a subgroup, so the data contain 25 subgroups of five, 125 readings in all. Each subgroup's average and range were recorded, along with notes on color changes, humidity and the coater on duty.

What this page is doingDescribes how the measurements were taken.
4

Chart Selection

Thickness is measured on a continuous scale and the readings come in small subgroups taken at the same time, which makes X-bar and R charts appropriate. The X-bar chart tracks the average thickness of each subgroup, showing whether the process center shifts. The R chart tracks the range within each subgroup, showing whether the spread changes. Woodall (2000) notes that disputes about control charts often stem from confusing their two uses, understanding a process's past behavior and monitoring it going forward; this assignment uses the first 25 subgroups to establish limits and understand the process, and the limits will then be used to monitor it.

What this page is doingExplains why X-bar and R charts were chosen.
5

Control Limits

The grand average of the 25 subgroup averages is 2.90 mils, and the average range is 0.62 mils. Published control chart tables give the factors for five readings per subgroup: 0.577 for the X-bar limits, and 0 and 2.114 for the lower and upper range limits.

Control chart calculations for coating thickness (invented data)

ChartCenter lineLower control limitUpper control limit
X-bar2.90 mils2.90 minus 0.577 × 0.62 = 2.54 mils2.90 + 0.577 × 0.62 = 3.26 mils
R0.62 mils0 × 0.62 = 02.114 × 0.62 = 1.31 mils
What this page is doingCalculates the center lines and limits.
6

Interpreting the Charts

Four subgroups signal special causes. On the X-bar chart, subgroups 6, 14 and 19 fall below the lower limit of 2.54 mils, with averages between 2.41 and 2.49. On the R chart, subgroup 22 exceeds the upper limit, with a range of 1.44 mils. The notes explain each. Subgroups 6, 14 and 19 were the first hours after a color change, when the line is purged and the guns are adjusted for the new powder; coaters reduce powder flow until the new color settles, and parts in that hour run thin. Subgroup 22 came on a humid afternoon, when moist powder sprayed unevenly and produced both thin and thick spots. Apart from these points, the charts show no long runs or trends, which suggests that the remaining variation is common-cause variation built into the process.

What this page is doingIdentifies signals and their causes.
7

Stability After Removing Special Causes

With the four special-cause subgroups removed, the remaining 21 subgroups have a grand average of 2.93 mils and an average range of 0.58 mils. The X-bar limits become 2.60 and 3.26, and all 21 points fall within them, so the process is stable once color changes and humidity are controlled. Dividing the 0.58-mil average range by 2.326, the published factor that converts a five-reading range into a standard deviation, puts the spread of single readings near 0.25 mils. For simplicity, and to be conservative, the original estimate of about 0.27 mils from the full data is used in the capability calculations below.

What this page is doingRecalculates for the stable process.
8

Process Capability

The specification runs from 2.5 to 4.0 mils, a width of 1.5 mils. The process spread, six standard deviations, is about 6 × 0.267 = 1.60 mils.

Cp = (4.0 minus 2.5) / 1.60 = 0.94

Cpk takes the smaller of the distances from the process center to each specification limit, divided by three standard deviations. With a center of 2.90 mils, the distance to the lower limit is 0.40 and to the upper limit 1.10, so Cpk = 0.40 / (3 × 0.267) = 0.50.

A Cp just under 1 means the process spread is about as wide as the specification, so even perfectly centered it would produce some parts outside it. A Cpk of 0.50, far below Cp, means the process is running much closer to the lower limit than it needs to. About 7 percent of parts would be expected to fall below 2.5 mils at this center and spread, which matches the thin coverage seen in inspection data.

What this page is doingCompares the process with the specification.
9

What the Indices Say to Do

Two improvements follow. First, the process should be centered higher. Moving the center from 2.90 to 3.25 mils, the midpoint of the specification, would raise Cpk to about 0.94, equal to Cp, and cut parts below 2.5 mils to under 1 percent. That means a modest increase in powder flow and a standard gun distance, which Project One found drifts on the night shift. Second, the spread should be narrowed. If the standoff guides, rack loading standards and humidity control proposed in Project One cut the standard deviation to about 0.20 mils, Cp would rise to 1.25 and, centered, so would Cpk. Stewart and Grout (2001) argue that errors are best prevented by designing them out rather than by inspection, and a standoff guide on each gun is that kind of design. Higher centering will use slightly more powder, about $18,000 a year, against the roughly $410,000 a year now spent on rework.

What this page is doingTurns capability into action.
10

Ongoing Monitoring

The chart will be kept at the coating line. Each hour, a coater will measure five parts and plot the average and range. Any point outside the limits, or a streak of seven hourly averages all above or all below the center line, will trigger a check of gun settings, powder moisture and rack loading before more parts are coated. The first hour after every color change will be measured twice. Shah and Ward (2007) include process control among the measures of lean production, and moving measurement from end-of-line inspection into the process is the main change this assignment recommends.

What this page is doingSets up the chart for daily use.
11

Limitations

The capability calculations assume that thickness readings are roughly normally distributed, which a histogram of the stable subgroups supports. Thickness was measured at one spot per part, while thin coverage often occurs in corners and inside tubes, so the charts may understate the problem on complex parts. Measurements on rails and posts should be added once the chart is running.

What this page is doingNotes what the analysis assumes.
12

References

Shah, R., & Ward, P. T. (2007). Defining and developing measures of lean production. Journal of Operations Management, 25(4), 785-805. https://doi.org/10.1016/j.jom.2007.01.019

Stewart, D. M., & Grout, J. R. (2001). The human side of mistake-proofing. Production and Operations Management, 10(4), 440-459. https://doi.org/10.1111/j.1937-5956.2001.tb00086.x

Woodall, W. H. (2000). Controversies and contradictions in statistical process control. Journal of Quality Technology, 32(4), 341-350. https://doi.org/10.1080/00224065.2000.11980013

What the QSO 325 Module 5 instructions ask for

The QSO 325 Module 5 assignment typically asks students to apply statistical process control to a process measure. Expect to select an appropriate chart, often X-bar and R charts for measured data in subgroups or p charts for proportions, calculate the center line and control limits, plot the data, identify out-of-control signals using standard rules, investigate their causes and, once the process is stable, calculate process capability against specifications. Strong submissions explain the difference between control limits, which describe what the process does, and specification limits, which describe what the customer needs, show the calculations clearly and explain what the capability indices mean for the business. Charts should be interpreted, not only drawn.

How this QSO 325 Module 5 control chart assignment example is built

The assignment charts powder-coat thickness at Maumee Playworks, a fictional manufacturer. An inspector measured five parts every hour for 25 hours of production. The X-bar chart has a center line of 2.90 mils with limits of 2.54 and 3.26; the R chart has an average range of 0.62 mils with an upper limit of 1.31. Four points fall outside the limits, three after color changes and one on a humid afternoon. With those subgroups removed and their causes addressed, the estimated standard deviation is about 0.27 mils, giving a Cp of 0.94 and a Cpk of 0.50 against specifications of 2.5 to 4.0 mils. Woodall's discussion of control chart controversies, Shah and Ward on lean measures and Stewart and Grout on error prevention guide the interpretation.

Where the QSO 325 Module 5 rubric puts the points

The QSO 325 control chart assignment is usually scored on an appropriate choice of chart, correct calculation of center lines and limits, accurate identification of out-of-control signals, sensible investigation of their causes, a clear distinction between control and specification limits, correct capability calculations for a stable process and interpretation that leads to action. Submissions that earn the most explain why capability is calculated only after special causes are removed and what the gap between Cp and Cpk says about centering. Credit drops when limits are confused with specifications, capability is calculated for an unstable process, out-of-control points are ignored or interpretation is missing. Clear tables and APA citations complete the grade.

QSO 325 Module 5 help: the mistakes that cost points

Decide what you are measuring and how: for continuous measurements taken in small groups, use X-bar and R charts; for the share of defective items, use a p chart. Calculate the grand average and average range, then the limits using the standard constants for your subgroup size. Plot the points in time order and look for signals: points outside the limits, long runs on one side of the center line or trends. For each signal, ask what was different at that time. Only when the process is stable should you calculate capability, comparing the process spread and its center with the specification limits. A common mistake is using specification limits as control limits; another is reporting Cp without Cpk, which hides a process that is off center.

Get QSO 325 Module 5 written to your instructions

Send the QSO 325 Module 5 instructions and your process data. A writer chooses the right control charts, calculates center lines and limits, interprets out-of-control signals and their likely causes, checks stability before calculating capability and explains Cp and Cpk in terms of what the process needs. Your first QSO 325 control chart assignment is free, ready in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 325 papers and related BS Operations Management samples

QSO 325 Module 5 questions, answered

Where can I find a free QSO 325 Module 5 Control Chart Assignment sample?

This page holds the full QSO 325 Module 5 assignment: X-bar and R charts and capability analysis for an invented playground maker's powder-coat thickness.

How do control limits differ from specification limits?

Control limits are calculated from the process data and show its natural variation; specification limits are set by customer or design requirements and show what is acceptable.

When is a process out of control?

When points fall outside the control limits or show nonrandom patterns, such as long runs on one side of the center line or steady trends, suggesting a special cause.

What do Cp and Cpk measure?

Cp compares the width of the specification with the process spread; Cpk also accounts for where the process is centered, so a process that is off center has a lower Cpk than Cp.

Why calculate capability only for a stable process?

Because capability predicts future performance, which is only meaningful when the process is in statistical control and free of special causes.