QSO 325 Module 3 Project One Example

Reviewed by Portia Lambrick, MBA

This QSO 325 Module 3 Project One sample analyzes a quality problem with check sheets, a Pareto chart and a cause-and-effect diagram, and verifies the root causes with data. SNHU QSO 325 (QSO-325) sets this root cause study in Module 3 of its BS Operations Management continuous improvement course. The problem is powder-coat rework at Maumee Playworks, an invented Fort Wayne maker of playground structures, where 7.4 percent of coated steel parts must be stripped or touched up. Six weeks of check sheets record 1,820 defects; the Pareto chart shows three types making up 69 percent; and of 23 possible causes on the cause-and-effect diagram, three are confirmed by data before countermeasures are proposed.

CourseQSO 325 Continuous Improvement Tools and Techniques
ModuleModule 3
Paper typeundergraduate project analyzing a quality problem with check sheets, a Pareto chart, a cause-and-effect diagram and verification of root causes
LengthAbout 1,090 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 325 Module 3

1

Thin Spots, Runs and Dirt: A Root Cause Analysis of Powder-Coat Rework at Maumee Playworks

[Student Name]

Southern New Hampshire University

QSO 325: Continuous Improvement Tools and Techniques

Project One: Quality Problem Analysis

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe defect counts, causes and test results for Maumee Playworks in this QSO 325 project are fictional.
2

Thin Spots, Runs and Dirt: A Root Cause Analysis of Powder-Coat Rework at Maumee Playworks

Problem Statement

Powder coating gives Maumee Playworks' steel posts, decks and rails their color and corrosion protection. In the first quarter of 2026, 7.4 percent of coated parts failed inspection and were either stripped and recoated or touched up by hand. Rework costs about $410,000 a year in powder, labor and oven time, and it adds days to the queue before coating that the value stream map identified as the plant's largest. The goal of this project is to find the main causes of coating defects and propose countermeasures that cut rework to under 3 percent.

What this page is doingDefines the problem with data.
3

Scope

The study covers the main coating line, which handles all posts, rails and decks, and excludes the small touch-up booth used for field repairs. It measures defects found at final coating inspection, not those found later by customers, which are tracked separately through warranty claims. The analysis focuses on the defect types with the largest share of rework and treats cost as proportional to the number of reworked parts, since a stripped and recoated post costs roughly the same as a rail. Changes to powder suppliers and to the oven itself are outside the project's scope, because they require capital approval, but any evidence pointing to them will be reported.

What this page is doingSets the boundaries of the study.
4

Data Collection

Inspectors at the end of the coating line recorded every defect for six weeks in March and April on a check sheet with columns for defect type, part type, color, shift, rack number and time, and a note on the day's humidity from the shop's sensor. Over that period, 24,600 parts were coated and 1,820 were rejected, a rate of 7.4 percent, matching the quarter's figure.

What this page is doingDescribes the check sheet.
5

Pareto Analysis

Coating defects by type, six weeks (invented data)

Defect typeCountShareCumulative share
Thin coverage69238 percent38 percent
Runs and orange peel30917 percent55 percent
Dirt inclusions25514 percent69 percent
Weld spatter showing through20011 percent80 percent
Scratches from handling1649 percent89 percent
Wrong color or shade1096 percent95 percent
Other915 percent100 percent

Three defect types, thin coverage, runs and orange peel and dirt inclusions, account for 69 percent of defects. Thin coverage alone accounts for more than a third, so it is analyzed first. Breaking it down further, 61 percent of thin coverage defects occurred on the night shift, which coats only 45 percent of parts, and 70 percent occurred on posts and rails rather than flat decks.

What this page is doingIdentifies the main defect types.
6

Cause-and-Effect Diagram

A team of two coaters from each shift, the line supervisor, a maintenance technician and the quality inspector built a cause-and-effect diagram for thin coverage, organized under methods, machines, materials, people, measurement and environment. It listed 23 possible causes, including gun-to-part distance, gun voltage, powder flow rate, worn nozzles, poor grounding of racks, rack density, line speed, powder moisture, humidity, operator training and inspection method. The team voted on the five most likely; the three with data available were tested.

What this page is doingLists possible causes of thin coverage.
7

Testing the Causes

Gun-to-part distance. The manual touch-up guns are meant to be held 8 to 10 inches from parts, but the night shift has fewer experienced coaters. A coater observed for two hours on each shift held the gun an average of 9 inches away on days and 13 inches on nights, and thin coverage on parts coated during the observation ran three times higher on nights. This cause is confirmed.

Humidity. Powder absorbs moisture and sprays unevenly in humid air. Comparing days by humidity, thin coverage averaged 2.1 percent of parts on days below 60 percent relative humidity and 4.6 percent on days above it. Humid days were concentrated late in April. This cause is confirmed, and it will matter more in summer.

Rack density. To keep up during the spring build-up, racks were sometimes loaded with more parts than the standard, so parts shield one another from the spray. Racks loaded above the standard had a thin coverage rate of 5.8 percent against 2.4 percent for standard racks. This cause is confirmed.

Two other candidates, worn nozzles and poor rack grounding, could not be tested with existing data and remain possible.

What this page is doingVerifies which causes matter.
8

Why the Causes Persist

Woodall (2000) observed that statistical process control is most useful when it is used to understand and reduce variation, not only to detect problems after the fact, and that much of the controversy over control charts arises from misusing them. At Maumee, inspection detects defects at the end of the line but nothing measures coating thickness during coating, so drift in gun distance or humidity goes unnoticed for hours. Stewart and Grout (2001) argue that many human errors are best prevented by changing the work environment so the error becomes difficult, rather than by asking people to try harder; the night shift's gun distance is a training problem, but also a design problem, since nothing shows a coater how far away the gun is. Shah and Ward (2003) found that lean practices perform best in bundles, and the causes here touch quality, maintenance and staffing at once.

What this page is doingConnects causes to the system.
9

Proposed Countermeasures

For gun distance, attach a simple standoff guide to each manual gun and pair each new night-shift coater with an experienced coater for two weeks. For humidity, install a dehumidifier for the powder storage room and booth, and add a rule to check powder moisture when humidity exceeds 60 percent. For rack density, mark the maximum load on each rack and add a rack standard to the coating line's work instructions. Each countermeasure will be tested for two weeks with the same check sheet, with the target of cutting thin coverage from 2.8 percent of parts to under 1 percent.

What this page is doingMatches fixes to confirmed causes.
10

Expected Benefit

If thin coverage falls from 2.8 percent of parts to under 1 percent, rework would drop by about 440 parts over a comparable six weeks, or roughly 3,800 parts a year, saving about $85,000 in powder, labor and oven time. Because reworked parts go back through the line, the coating line would also regain about 3 percent of its capacity, which matters during the spring peak when the queue in front of it is longest. Shortening that queue by even two days would take two days off the lead time on the value stream map.

What this page is doingEstimates what the countermeasures are worth.
11

Conclusion

Thin coverage, the largest coating defect, has three confirmed causes, each with a simple countermeasure. Runs and dirt inclusions, the next two bars on the Pareto chart, get the same treatment in May. Project Two will build these countermeasures into a continuous improvement plan.

What this page is doingSummarizes the analysis.
12

References

Shah, R., & Ward, P. T. (2003). Lean manufacturing: Context, practice bundles, and performance. Journal of Operations Management, 21(2), 129-149. https://doi.org/10.1016/S0272-6963(02)00108-0

Stewart, D. M., & Grout, J. R. (2001). The human side of mistake-proofing. Production and Operations Management, 10(4), 440-459. https://doi.org/10.1111/j.1937-5956.2001.tb00086.x

Woodall, W. H. (2000). Controversies and contradictions in statistical process control. Journal of Quality Technology, 32(4), 341-350. https://doi.org/10.1080/00224065.2000.11980013

What the QSO 325 Module 3 instructions ask for

QSO 325 Project One typically asks students to analyze a quality or process problem in an organization using continuous improvement tools. Expect to define the problem with data, collect data with a check sheet or similar method, use a Pareto chart to identify the most important categories, build a cause-and-effect diagram for the leading category, verify which causes actually drive the problem and propose countermeasures. Many versions ask for a problem statement, baseline measures and a plan to test solutions. Strong projects move from symptoms to verified causes with data at each step, distinguish possible causes from confirmed ones and propose countermeasures that address the verified causes, with a measure for each.

How this QSO 325 Module 3 project one example is built

The project studies powder-coat rework at Maumee Playworks, a fictional maker of play structures, where 7.4 percent of coated steel parts are stripped or touched up at a cost of about $410,000 a year. Six weeks of check sheets at the coating line record 1,820 defects by type, shift, part and color. A Pareto chart shows thin coverage at 38 percent, runs and orange peel at 17 percent and dirt inclusions at 14 percent. A cause-and-effect diagram for thin coverage lists 23 possible causes, and three are tested: gun-to-part distance drifting on the night shift, humidity above 60 percent and racks loaded too densely. Woodall on statistical process control, Stewart and Grout on mistake-proofing and Shah and Ward on lean bundles inform the countermeasures.

Where the QSO 325 Module 3 rubric puts the points

In QSO 325 Project One, marks follow a problem statement backed by numbers, sound data collection, a correctly built and interpreted Pareto chart, a thorough cause-and-effect diagram, verification of causes with data rather than opinion, countermeasures tied to verified causes and a plan to measure results. Projects that score highest show the data behind each step, explain how each cause was tested and admit which causes remain unconfirmed. Credit falls when the Pareto stops at defect types without asking why, when cause-and-effect diagrams are brainstorm lists with no testing, when countermeasures do not match causes or when the cost of the problem is missing. Tables and APA citations count as well.

QSO 325 Module 3 help: the mistakes that cost points

Write the problem in measurable terms: what, where, how much and since when, with its cost. Design a simple check sheet that records each defect with the categories you may need later, such as type, shift, product and time, and collect for long enough to capture normal variation. Build the Pareto chart and pick the largest category. Build a cause-and-effect diagram for it with the people who do the work, then pick the most likely causes and test each with data, for example by comparing defect rates under different conditions. A common mistake is treating the diagram itself as the answer; another is proposing fixes before any cause is confirmed. Propose countermeasures for the confirmed causes and say how you will know they worked.

Get QSO 325 Module 3 written to your instructions

Upload the QSO 325 Project One guidelines and describe the problem you are analyzing. A writer designs the check sheet, builds the Pareto chart, constructs a cause-and-effect diagram, shows how the leading causes were tested with data and proposes countermeasures with a way to measure them. The first QSO 325 project is drafted free, usually two days out. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 325 papers and related BS Operations Management samples

QSO 325 Module 3 questions, answered

Where can I find a free QSO 325 Module 3 Project One sample?

The full QSO 325 Project One is on this page: a root cause analysis of powder-coat rework at an invented playground equipment plant.

What is a Pareto chart used for?

Ranking problem categories by frequency or cost so that improvement efforts focus on the few categories that account for most of the problem.

What is a cause-and-effect diagram?

A fishbone sketch that groups a team's suspected causes under headings like methods, equipment, materials, people, measurement and surroundings, so each suspect can then be checked with data.

How do you verify a root cause?

Compare the problem's rate when the suspected cause is present and absent, or change the cause deliberately and measure the effect, rather than relying on opinion.

What is a check sheet?

A simple form for recording each occurrence of a problem with chosen details, such as type, location and time, so the data can be analyzed afterward.