QSO 325 Module 7 Project Two Example

Reviewed by Portia Lambrick, MBA

This QSO 325 Module 7 Project Two sample is a continuous improvement plan with a future-state value stream, prioritized improvements, kaizen events, measures and the routines that sustain the gains. SNHU QSO 325 (QSO-325) closes its BS Operations Management course on continuous improvement tools with this plan in Module 7. The company is Maumee Playworks, an invented Fort Wayne maker of playground structures with a 46-day lead time, 7.4 percent coating rework and kits that ship short. The plan maps a future state with a 24-day lead time, schedules four kaizen events, sets a scorecard and builds daily huddles, standard work and leader walks so improvement continues after the events end.

CourseQSO 325 Continuous Improvement Tools and Techniques
ModuleModule 7
Paper typeundergraduate continuous improvement plan with a future-state value stream, prioritized improvements, kaizen events, measures and routines to sustain gains
LengthAbout 1,130 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 325 Module 7

1

From Nine Weeks to Five: A Continuous Improvement Plan for Maumee Playworks

[Student Name]

Southern New Hampshire University

QSO 325: Continuous Improvement Tools and Techniques

Project Two: Continuous Improvement Plan

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe future state, events and targets for Maumee Playworks in this QSO 325 plan are made up.
2

From Nine Weeks to Five: A Continuous Improvement Plan for Maumee Playworks

Introduction

The current-state map in Module 2 showed that a mid-size play structure at Maumee Playworks takes 46 working days from quote to shipment for about 14 hours of work that adds value, with the longest queues before powder coating and in slide inventory. Project One traced most coating rework to thin coverage with three confirmed causes, the control charts in Module 5 showed a coating process stable but off center and Module 6 proposed mistake-proofing for hardware kits. This plan brings those findings together: a future-state value stream, a prioritized set of improvements carried out through kaizen events, a scorecard and the routines that will keep the gains.

What this page is doingRestates the starting point and the aim.
3

The Future-State Value Stream

In the future state, an order released to production triggers a single schedule for that structure, set at the packing step, rather than a weekly list pushed to every department. Coating and slide molding schedule by structure for the ten colors that make up about 80 percent of orders, running small batches of each color in a fixed daily sequence, while rare colors are batched weekly. Setup reduction cuts the slide color change from 3.5 hours to under 1.75, making small batches affordable. Coated parts flow to deck coating and kitting in carts sized for one structure, and kitting pulls parts for the next structure only when packing signals it is ready. Design approval moves to a standard menu of 40 configurations that cover about half of school orders, so those customers can approve from a catalog rather than a custom drawing.

Current and future-state lead time by step, mid-size structures (working days)

Step or queueCurrent stateFuture state
Waiting for design approval74
Order entry31
Steel stock22
Queue before coating93
Slide inventory62
Queue before deck coating42
Queue before kitting32
Queue before packing53
Queue before shipping32
Processing and moves43
Total4624
What this page is doingDescribes how the process should work.
4

Prioritizing Improvements

Improvements were ranked by their effect on lead time, quality and customer complaints and by how quickly they could be done without capital. Coating defects come first, because the coating queue is the largest and rework adds to it, and Project One already identified causes and countermeasures. Slide changeovers come second, because long changeovers drive overproduction and the slide warehouse. Kitting mistake-proofing comes third, because missing hardware is the top customer complaint. Design approval comes fourth: its payoff in lead time is large, yet it hinges on school boards and the sales team, so it needs the longest runway.

What this page is doingRanks the work by impact and ease.
5

Kaizen Event 1: Coating Defects

A five-day September event, staffed by coating operators from days and nights plus maintenance and quality, will install standoff guides on all manual guns, set rack loading standards with marked racks, commission a dehumidifier and re-center powder flow to target a thickness of 3.25 mils. The hourly control chart from Module 5 will be put into daily use. Goal: coating rework below 3 percent within eight weeks, from 7.4 percent.

What this page is doingApplies the Project One countermeasures.
6

Kaizen Event 2: Slide Color Changes

A four-day event in October will apply setup reduction to the rotomold color change. McIntosh et al. (2000), in a critical evaluation of Shingo's SMED method, argued that the method's familiar sequence of separating, converting and streamlining setup tasks is useful but that design changes to equipment and tools often deliver the largest reductions. The team will film two color changes, separate the tasks that can be done while the oven runs, such as preparing the next color's powder and preheating molds, from those that require stopping it and redesign mold clamps to quick-release fittings. Goal: color change under 1.75 hours.

What this page is doingReduces setup time on rotomolding.
7

Kaizen Event 3: Kitting Mistake-Proofing

A three-day event in November will build foam shadow trays for the 20 most common kits, install a packing scale linked to each kit's expected weight and pilot pick-to-light on one rack. Goal: kits shipped short below 0.5 percent of shipments, from 3.9 percent.

What this page is doingImplements the Module 6 devices.
8

Kaizen Event 4: Design Approval

A four-day event in January with designers, sales representatives and two school district facilities managers as advisers will define 40 standard configurations and a one-page approval form. Goal: average time from quote to approved design cut from about 7 working days to 4.

What this page is doingShortens the office queue.
9

Scorecard

Continuous improvement scorecard

MeasureBaselineTarget, end of next yearReviewed
Lead time, mid-size structures46 working days24 working daysMonthly
On-time shipping78 percent95 percentWeekly
Coating rework7.4 percentUnder 3 percentDaily
Kits shipped short3.9 percentUnder 0.5 percentWeekly
Slide color change time3.5 hoursUnder 1.75 hoursEach change
Suggestions implemented per employee per yearNot tracked4Monthly
What this page is doingDefines measures, baselines and targets.
10

Sustaining the Gains

Farris et al. (2009), studying kaizen events across several manufacturing organizations, found that the human outcomes of events, such as employees' attitudes toward improvement and their skills, were linked to factors including goal clarity, management support and the team's autonomy. Netland (2016) found that practitioners in 83 factories rated leadership commitment and employee involvement as critical to lean success. Anand et al. (2009) argue that improvement becomes a lasting capability only with infrastructure: purpose, structures for participation, training and ways to share learning. The plan builds that infrastructure into daily work in four ways.

Each work area will open every shift by gathering for ten minutes at a visual board showing yesterday's results on its scorecard measures and the improvement ideas in progress. Every new method will be written as standard work, with photos, and posted at the station. Supervisors will spend the first hour of each day on the floor, and the plant manager will walk one area each week with the people who work there, asking what is getting in their way. And a simple suggestion system will track ideas from proposal to result on the huddle board, with a target of four implemented ideas per employee per year.

What this page is doingDesigns the routines that hold improvement.
11

Costs and Benefits

The plan's direct costs are about $165,000: $40,000 for standoff guides, rack marking and the dehumidifier, $55,000 for quick-release mold fittings, $45,000 for shadow trays, the packing scale and a pick-to-light pilot and $25,000 in overtime for event teams. Expected annual benefits are about $520,000: $260,000 from lower coating rework, $90,000 from smaller slide inventory and less warping, $110,000 from fewer installer callbacks for missing hardware and $60,000 from less overtime. The shorter lead time should also win orders from schools that need structures within a semester, which is not counted.

What this page is doingEstimates the value of the plan.
12

Risks

The biggest risk is the one that undid past efforts: production pressure in the spring pushing improvement aside. The events are scheduled from September to January, the slow season, and the daily routines are designed to take minutes rather than hours. Scheduling by structure will be piloted for four weeks before it replaces the weekly list.

What this page is doingNotes what could derail the plan.
13

References

Anand, G., Ward, P. T., Tatikonda, M. V., & Schilling, D. A. (2009). Dynamic capabilities through continuous improvement infrastructure. Journal of Operations Management, 27(6), 444-461. https://doi.org/10.1016/j.jom.2009.02.002

Farris, J. A., Van Aken, E. M., Doolen, T. L., & Worley, J. (2009). Critical success factors for human resource outcomes in Kaizen events: An empirical study. International Journal of Production Economics, 117(1), 42-65. https://doi.org/10.1016/j.ijpe.2008.08.051

McIntosh, R. I., Culley, S. J., Mileham, A. R., & Owen, G. W. (2000). A critical evaluation of Shingo's "SMED" (single minute exchange of die) methodology. International Journal of Production Research, 38(11), 2377-2395. https://doi.org/10.1080/00207540050031823

Netland, T. (2016). Critical success factors for implementing lean production: The effect of contingencies. International Journal of Production Research, 54(8), 2433-2448. https://doi.org/10.1080/00207543.2015.1096976

What the QSO 325 Module 7 instructions ask for

The final QSO 325 project typically asks students to develop a continuous improvement plan for the process they have studied. Expect to present a future-state map or design, prioritize improvement opportunities, plan specific improvement projects or kaizen events with goals and teams, define measures and targets and explain how improvements will be sustained through standard work, visual management, regular review and leadership. Strong plans build directly on the earlier analyses, explain why the improvements are sequenced as they are, set measurable targets for each and treat sustaining as a designed part of the plan rather than a closing paragraph. Costs and expected benefits should be estimated where possible.

How this QSO 325 Module 7 project two example is built

The plan improves the value stream for mid-size structures at Maumee Playworks, a fictional manufacturer. A future-state map schedules coating and slide molding by structure rather than by color for the ten most common colors, halves the slide color change from 3.5 hours with setup reduction, links coating and kitting with a pull signal and cuts lead time from 46 to about 24 working days. Four kaizen events follow in sequence: coating defects, slide changeovers, kitting mistake-proofing and design approval. A scorecard tracks lead time, on-time shipping, rework and kit accuracy. Farris and colleagues on kaizen event success, the McIntosh team on SMED, Netland on lean success factors and Anand and colleagues on improvement infrastructure shape the daily routines that hold the gains.

Where the QSO 325 Module 7 rubric puts the points

Instructors grading QSO 325 Project Two generally weigh a future state grounded in the current-state analysis, a sensible prioritization of improvements, kaizen events with clear scope, teams and targets, appropriate measures with baselines, a credible plan for sustaining gains through standard work, visual management and leadership routines and estimates of cost and benefit. Plans that earn the highest marks link every improvement to a problem found earlier, show how the improvements interact and build sustaining routines into daily work. Credit falls when the future state is a wish list, events lack measurable goals, measures are missing baselines or sustaining is left to good intentions. Organization and APA citations complete the rubric.

QSO 325 Module 7 help: the mistakes that cost points

Start from your current-state map and problem analyses and ask what the process would look like with the biggest wastes removed: draw the future state with new flows, pull signals and shorter queues, and estimate its lead time. List the improvements needed to get there and rank them by impact and ease, then turn the top ones into kaizen events with a scope, team, goal and date. Define a few measures with baselines and targets and say who reviews them and how often. Then design the sustaining system: standard work for the new methods, visual boards, daily huddles and regular leader walks. A common mistake is planning events but nothing after them; another is a future state that requires investments the company has not approved.

Get QSO 325 Module 7 written to your instructions

Upload the QSO 325 Project Two guidelines with your earlier maps and analyses. A writer designs the future-state value stream, prioritizes improvements, plans kaizen events with scope, team and targets, builds a scorecard and sets out the daily routines and leadership practices that will keep the gains. Your first QSO 325 Project Two is free, delivered in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 325 papers and related BS Operations Management samples

QSO 325 Module 7 questions, answered

Where can I find a free QSO 325 Module 7 Project Two sample?

This page holds the complete QSO 325 Project Two: a continuous improvement plan for an invented playground equipment maker, from future-state map to daily routines.

What is a future-state value stream map?

A map of how the process should work once major wastes are removed, showing new flows, pull signals and shorter queues, used to guide improvement projects.

What is a kaizen event?

A focused improvement project, usually lasting a few days, in which a cross-functional team analyzes a process and implements changes with specific goals.

How do you sustain process improvements?

Build them into standard work, make the new standard visible, review measures in daily huddles, audit regularly and have leaders check the process in person.

What makes kaizen events successful?

Research points to clear goals, management support, team autonomy and follow-up after the event, with gains more likely to last when the work area owns the result.