MKT 229 Module 3 Milestone One Example

Reviewed by Portia Lambrick, MBA

This MKT 229 Module 3 Milestone One sample defines who an integrated campaign must reach, what it should say and what it must achieve. SNHU MKT 229 (MKT-229) asks BS Marketing students in Milestone One to set target audiences, a consumer insight and measurable communication objectives before choosing media. Bluestem Botanical Garden, a composite nonprofit garden in Wichita, Kansas, plans Winter Glow, its first winter light walk, and a membership drive alongside it. The milestone profiles four audiences, draws an insight from reviews and member surveys, states one core idea and sets objectives from awareness to ticket sales and new memberships, with research on how advertising works shaping their form.

CourseMKT 229 Principles of Integrated Marketing Communications
ModuleModule 3
Paper typeundergraduate milestone defining target audiences, a consumer insight and communication objectives
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 229 Module 3

1

Something Is Always Growing: Audiences, Insight and Objectives for Bluestem's Winter Glow

[Student Name]

Southern New Hampshire University

MKT 229: Principles of Integrated Marketing Communications

Milestone One: Audiences and Objectives

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingBluestem Botanical Garden, Winter Glow and all targets are fictional and illustrative.
2

Something Is Always Growing: Audiences, Insight and Objectives for Bluestem's Winter Glow

Introduction

The communication audit found that Bluestem Botanical Garden speaks with five different voices, spends most of its paid media on summer families and wedding couples and says almost nothing to potential winter visitors or future members. This winter the garden will open Winter Glow, a light walk through the prairie and woodland gardens on 38 nights from November 20 to January 3, with timed tickets at $22 for adults and $16 for members. The campaign has two business goals: sell enough tickets to cover the event's cost and turn first-time winter visitors into members. This milestone defines the audiences, the insight, the core idea and the communication objectives.

What this page is doingBuilds on the audit.
3

Audiences

Winter Glow audiences

AudienceSize in the Wichita areaWhat they needWhat stops them now
Families with children aged 4 to 14About 61,000 householdsA safe, memorable evening out in winterDo not know the garden opens in winter
Adults 25 to 44 planning a night outAbout 98,000 adultsSomething new to do with a partner or friendsSee the garden as a daytime, older-visitor place
Current members6,300 householdsA reason to visit outside summerMember news focuses on conservation, not events
Lapsed members2,100 householdsA reason to returnNo contact since their membership ended

Families are the priority audience, because they buy several tickets at once and are the most likely to become members; adults on a night out come second. Members and lapsed members are cheap to reach, and their early visits will seed word of mouth for the later weeks. Couples planning weddings, the audience the garden spends most on today, are left out of this campaign on purpose; Winter Glow is not a wedding product.

What this page is doingDefines who the campaign must reach.
4

Insight

Three sources point to the same feeling. In the garden's 2,140 online reviews, the most common praise is some version of "there was something new this time." In a survey of 820 members, 64 percent said they visit less in winter because "there is nothing to see," and the members who visit most often say they come to see what has changed. Lapsed members, in exit surveys, most often said they "stopped going after we had seen it all." The insight is that people come back to a garden when they believe it will be different this time. That belief is fragile: it depends on the garden telling people what has changed, which its current communications rarely do. Winter Glow is the most dramatic possible proof that something has changed, but the insight applies all year, which is why it can anchor more than one campaign.

What this page is doingFinds the truth the campaign builds on.
5

Core Idea

The idea every touchpoint will carry reads "something is always growing at Bluestem." In spring it can mean blooms; in summer, new plantings; in winter, light growing across the prairie each night; for members, a relationship that deepens with each season. It is short enough for a sign, an ad, a social post or a ticket. It also fits the garden's conservation mission without making that mission the headline.

What this page is doingStates what every touchpoint will say.
6

Objectives

Communication and business objectives

StageObjectiveMeasureDate
Awareness60 percent of Wichita metro adults aged 25 to 54 aware of Winter GlowOnline panel surveyNovember 15
Interest25,000 visits to the Winter Glow ticket pageWeb analyticsNovember 19
Action, early9,000 advance tickets sold, at least 3,000 to members and lapsed membersTicketing systemNovember 19
Action, total42,000 tickets across 38 nightsTicketing systemJanuary 3
Relationship1,200 new member households from Winter Glow visitorsMembership recordsJanuary 31
What this page is doingSets measurable targets.
7

Choosing the Form of the Objectives

The objectives follow a familiar ladder from awareness to action. Lavidge and Steiner (1961) pictured advertising as a staircase: people first become aware and learn, then come to like and prefer, then grow convinced and finally buy, with a measure possible at every stair. Vakratsas and Ambler (1999), reviewing more than 250 studies, found little support for any fixed order of effects and argued that affect, cognition and experience interact depending on context. For Winter Glow, both views are useful. The ladder gives the team measures to check in sequence, but the campaign should not assume people must learn before they feel; a beautiful photograph of the lit prairie may create desire before anyone reads the details. Objectives at each stage are therefore checked, but no stage is treated as a gate.

What this page is doingUses research on how advertising works.
8

The Membership Objective

Tickets cover this winter; members support the garden every year. Bhattacharya et al. (1995), studying art museum members, found that members' identification with the museum rose with perceived prestige, length of membership, visit frequency, donating and the confirmation of their expectations. Winter Glow can contribute to several of these at once: it gives members a reason to visit more often, it is the kind of event that raises the garden's local prestige and it lets first-time visitors see what membership offers. The objective of 1,200 new households, about 4 percent of non-member ticket buyers, is ambitious but grounded in that link between visiting and belonging.

What this page is doingExplains why it matters most in the long run.
9

What the Objectives Mean for the Budget

The ticket objective sets the scale of the campaign. Winter Glow can admit about 1,400 people a night, or 53,200 over 38 nights, so 42,000 tickets means filling 79 percent of capacity, a demanding but plausible goal for a new event in a metro area of about 650,000 people. At an average price near $20.50 after member discounts, 42,000 tickets would bring in about $860,000, against an event cost of roughly $610,000 for lights, staffing, security and parking. The campaign budget must fit inside that margin, and the advance ticket objective matters because early sales show within days whether the awareness work is landing, while there is still time to shift money. If fewer than 5,000 tickets are sold by November 12, the plan will move spending from awareness media toward direct offers to members and lapsed members.

What this page is doingChecks that the goals are realistic.
10

Conclusion

The campaign will speak first to families and then to adults planning a night out, with members and lapsed members filling the early nights. Every touchpoint will carry one idea, that something is always growing at Bluestem, and the objectives give the team numbers to check from mid-November to the end of January.

What this page is doingSets up the creative and media work.
11

References

Bhattacharya, C. B., Rao, H., & Glynn, M. A. (1995). Understanding the bond of identification: An investigation of its correlates among art museum members. Journal of Marketing, 59(4), 46-57. https://doi.org/10.1177/002224299505900404

Lavidge, R. J., & Steiner, G. A. (1961). A model for predictive measurements of advertising effectiveness. Journal of Marketing, 25(6), 59-62. https://doi.org/10.1177/002224296102500611

Vakratsas, D., & Ambler, T. (1999). How advertising works: What do we really know? Journal of Marketing, 63(1), 26-43. https://doi.org/10.1177/002224299906300103

What the MKT 229 Module 3 instructions ask for

Milestone One in MKT 229 generally asks you to identify the target audiences for an integrated campaign, describe what you know about them and set the campaign's communication objectives, often alongside a central message or creative idea. A strong milestone defines each audience by what it needs from the organization rather than by demographics alone, draws a consumer insight from evidence such as reviews, surveys or behavior, states one core idea every channel can carry and writes objectives that are measurable, dated and linked to stages such as awareness, interest and action. It explains which audience matters most and why, and it recognizes that communication objectives must ultimately support a business result such as ticket sales or memberships.

How this MKT 229 Module 3 milestone one example is built

The sample sets the audiences and objectives for Winter Glow, Bluestem Botanical Garden's first winter light walk, running 38 nights. The audiences are Wichita families with children, adults planning a night out, the garden's 6,300 member households and 2,100 lapsed members. An insight from 2,140 reviews and a member survey, that people want a reason to return in every season, yields the core idea "something is always growing at Bluestem." Objectives include 60 percent awareness among metro adults by mid-November, 9,000 advance tickets, 42,000 tickets in all and 1,200 new member households. Lavidge and Steiner's hierarchy, Vakratsas and Ambler's review and Bhattacharya, Rao and Glynn's museum study inform the choices.

Where the MKT 229 Module 3 rubric puts the points

Milestone One rubrics usually evaluate the definition of target audiences, the quality of insight, the clarity of the core idea, the measurability of objectives and writing. Top milestones base audiences and insight on evidence, prioritize audiences explicitly, write a core idea short enough to appear on every touchpoint and set objectives with numbers, dates and a stated way of measuring them. Points drop for audiences described only by age and income, for insights that are really product features, for slogans offered in place of an idea and for objectives such as "raise awareness" without a number. Instructors also look for objectives that connect communication results to the organization's goals. Correctly cited research adds weight.

MKT 229 Module 3 help: the mistakes that cost points

Begin with the audit's findings and the organization's goal for the campaign. List the audiences who could help reach it and decide which matters most. For each, write what they need and what stops them now. Read reviews, surveys or comments for a repeated feeling you can build on; that is your insight. Turn it into a core idea of a few words that any channel could express. Then set objectives for awareness, interest and action, each with a number, a date and a measure. Keep business results, such as tickets or memberships, in view so the objectives add up to something. Short, specific audience profiles beat long imagined ones.

Get MKT 229 Module 3 written to your instructions

Send the MKT 229 Milestone One brief along with your audit notes. We define the audiences, draw an insight from real evidence, write the core idea and set communication objectives with numbers and dates, shaped by research on how advertising works. The first milestone costs nothing and normally arrives on the second day. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 229 papers and related BS Marketing samples

MKT 229 Module 3 questions, answered

Where can I find a free MKT 229 Module 3 Milestone One sample?

A complete MKT 229 Module 3 Milestone One appears on this page, setting audiences, insight and objectives for a botanical garden's winter light walk.

What is a consumer insight in marketing communications?

A truth about how the audience thinks or feels, found in evidence such as reviews or surveys, that a campaign can build on.

What are communication objectives?

Measurable goals for what the audience should know, feel or do, such as awareness, consideration or ticket purchases, set with numbers and dates.

Is the hierarchy of effects still valid?

It remains a useful way to organize objectives, but a review of more than 250 studies found little support for a fixed order in which advertising effects occur.

How do you choose a core idea for an integrated campaign?

Find the insight the audiences share and express it in a few words that every channel, from ads to signs, can carry in its own way.