MKT 229 Module 8 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 229 Module 8 Discussion sample asks how an organization should judge the results of an integrated campaign, and why crediting each tool separately can mislead. SNHU MKT 229 (MKT-229) closes its BS Marketing course with evaluation and reflection. The post follows Bluestem Botanical Garden, a composite Wichita nonprofit, after Winter Glow, its first winter light walk. It sets ticket sales, awareness, memberships and earned media beside their targets, reads ticket source codes with care, uses research on media synergy, earned media and how advertising works to argue against cutting the tools that look weak in isolation and asks how next year's budget should be divided.

CourseMKT 229 Principles of Integrated Marketing Communications
ModuleModule 8
Paper typeundergraduate discussion post evaluating integrated campaign results and the attribution of effects to tools
LengthAbout 350 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 229 Module 8

1

Module Eight Discussion

The Billboards Got 9 Percent of the Credit

Winter Glow, the light walk at Bluestem Botanical Garden that I have followed through MKT 229, closed on January 3. It sold 39,600 tickets, short of the 42,000 target but enough to cover the event's cost. Advance sales reached 10,200, beating the goal of 9,000. Awareness among metro adults reached 54 percent, below the 60 percent target. Membership beat its target: 1,430 new households joined. Earned media reached 17 stories and about 7,900 tagged visitor posts.

What this page is doingThe results.
2

Source codes credit online video and social ads with 23 percent of sales, member email and postcards with 21 percent, search with 18, billboards with 9, press with 6 and school partners with 5; 18 percent had no code. On that evidence, someone on the board has already suggested cutting billboards next year and moving their $36,000 into video and search, the tools that look strongest in the report.

What this page is doingWhat the ticket codes say.
3

A billboard almost never gets the code, because nobody buys a ticket from a billboard; they search later, and the search ad collects the credit. The same is true of the radio spots and, partly, of the visitor photos that friends saw before buying. Naik and Raman (2003) found that a brand's television and print advertising each worked better because the other was running, and showed that synergy can justify spending more on the medium that looks weaker alone. Stephen and Galak (2012) found that social earned media not only raised sales directly but also drove press coverage, which suggests our 7,900 visitor posts helped produce some of the 17 stories. Vakratsas and Ambler (1999) argued that advertising does not work through a fixed sequence of steps, so a tool that builds feeling without producing a click can still matter.

What this page is doingWhy I would not cut them yet.
4

Keep billboards next year, but test them: run them in half the metro area for the first two weeks and compare ticket sales by ZIP code. The course's lesson for me is that integration makes evaluation harder, because the tools work together. How would you split next year's $148,000, and what test would you add?

What this page is doingWhat I would do, and a question.
5

References

Naik, P. A., & Raman, K. (2003). Understanding the impact of synergy in multimedia communications. Journal of Marketing Research, 40(4), 375-388. https://doi.org/10.1509/jmkr.40.4.375.19385

Stephen, A. T., & Galak, J. (2012). The effects of traditional and social earned media on sales: A study of a microlending marketplace. Journal of Marketing Research, 49(5), 624-639. https://doi.org/10.1509/jmr.09.0401

Vakratsas, D., & Ambler, T. (1999). How advertising works: What do we really know? Journal of Marketing, 63(1), 26-43. https://doi.org/10.1177/002224299906300103

What the MKT 229 Module 8 instructions ask for

The final MKT 229 discussion generally asks how integrated campaigns should be evaluated and what you have learned about integrated marketing communications, often using a campaign you have planned or studied. A strong post compares results with objectives using numbers, explains which results are solid and which are uncertain, recognizes that tools in an integrated campaign affect one another so their separate credit can mislead and uses research to support that point. It recommends what to change, based on evidence rather than on which tool looks best in a single report. A brief reflection connects the course's central idea, integration, to the evaluation problem rather than listing topics.

How this MKT 229 Module 8 discussion example is built

The sample reviews Winter Glow's results at Bluestem Botanical Garden: 39,600 tickets against a 42,000 target, 10,200 advance tickets, 54 percent awareness against 60, 1,430 new member households against 1,200, 17 stories and 7,900 tagged visitor posts. Ticket source codes credit video and social with 23 percent of sales, email and postcards with 21, search with 18 and billboards with 9. The post argues that cutting billboards on that basis would be a mistake, citing Naik and Raman on synergy between media, Stephen and Galak on social earned media driving press and sales and Vakratsas and Ambler on effects that do not follow a fixed path, and asks peers how they would divide next year's budget.

Where the MKT 229 Module 8 rubric puts the points

Grading for this closing discussion usually focuses on comparing results with objectives, the quality of reasoning about attribution and integration, research use, whether the next steps are sound and what the replies add. The posts that do best line up a few results against targets, explain why tools in an integrated campaign cannot be judged in isolation, use research to support that view and recommend changes with appropriate caution. Points are lost for declaring success or failure from one number, for reallocating money based only on last-touch credit, for ignoring earned media and for reflections that simply list course topics. A post that suggests a better way to test a tool's contribution next time shows real learning. Respectful, specific replies remain part of the grade.

MKT 229 Module 8 help: the mistakes that cost points

Put your main results beside the targets and say which were met. Then look at how credit was assigned: source codes and last clicks favor the tools closest to the purchase and undervalue those that create awareness. Use research on synergy or earned media to explain why. Recommend changes that respect how tools work together, and suggest a test, such as varying billboard spending by area, that could show a tool's real contribution. Keep the reflection brief and tie it to integration. Ask classmates how they would split next year's budget and why, which invites them to reveal their own assumptions about how communication works.

Get MKT 229 Module 8 written to your instructions

Share the MKT 229 Module 8 prompt and the campaign results you need to assess. We set them against the objectives, read the attribution with care, apply research on synergy and earned media and close with a question that splits the class productively. A first post is free, usually in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 229 papers and related BS Marketing samples

MKT 229 Module 8 questions, answered

Where can I find a free MKT 229 Module 8 Discussion sample?

The MKT 229 Module 8 post is published in full on this page, judging a botanical garden's integrated campaign results and attribution.

How do you evaluate an integrated marketing campaign?

Compare results with each objective, examine how tools contributed, recognize that they affect one another and test contributions where possible instead of relying on last-touch credit.

Why can source codes undervalue awareness media?

Codes record the last thing a buyer used, such as a search ad or email, while billboards and video may have created the interest that led to that search.

Does social earned media affect sales?

Research on an online marketplace found that social posts and press coverage both raised sales and that social activity helped generate press coverage.

How can a tool's real contribution be tested?

Vary its spending across comparable areas or periods and compare results, so differences can be linked to the tool rather than to other activity.