| Course | FIN 470 Undergraduate Finance Capstone |
|---|---|
| Module | Module 5 |
| Paper type | undergraduate milestone valuing a public company |
| Length | About 1,030 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Finance |
| Updated | October 2026 |
Free sample paper for FIN 470 Module 5
Valuation of Graco Inc.: Discounted Cash Flow and Relative Multiples
[Student Name]
Southern New Hampshire University
FIN 470: Undergraduate Finance Capstone
Milestone Two
[Instructor Name]
[Date]
Valuation of Graco Inc.: Discounted Cash Flow and Relative Multiples
Introduction
This milestone estimates what a share of Graco Inc. is worth and compares that with its market price of about $78 in early October 2026. The primary method is a discounted cash flow model, which Kaplan and Ruback (1995) tested on highly leveraged buyouts: discounted forecasts landed, on average, within about a tenth of the prices actually paid, a record that matched or beat valuations built from similar companies' multiples. A relative valuation serves as a check.
Normalizing Free Cash Flow
Graco's 2025 free cash flow was $638 million: $684 million of operating cash flow less $46 million of capital spending. That capital spending figure was unusually low, following $185 million in 2023 and $107 million in 2024 while a new plant was built, and below 2025 depreciation and amortization of $107 million. The 10-K states that management expects about $100 million of capital spending in 2026 (Graco Inc., 2026). Replacing $46 million with $100 million gives normalized free cash flow of about $584 million, rounded to $580 million as the base.
The Forecast
Growth of 5 percent a year is assumed for 2026 through 2030. That is above management's 2026 guidance of low single-digit organic growth, but consistent with its mid-single-digit guidance including acquisitions, and it assumes margins hold near current levels, as Milestone One supported.
Free cash flow forecast and present values at 9 percent (millions of dollars)
| Year | Free cash flow | Discount factor | Present value |
|---|---|---|---|
| 2026 | 609.0 | 0.917 | 558.7 |
| 2027 | 639.5 | 0.842 | 538.3 |
| 2028 | 671.4 | 0.772 | 518.4 |
| 2029 | 705.0 | 0.708 | 499.4 |
| 2030 | 740.2 | 0.650 | 481.1 |
| Sum of present values | 2,595.9 |
After 2030, cash flows are assumed to grow 3 percent a year forever, about the long-run growth of the nominal economy. The terminal value at the end of 2030 is $740.2 million x 1.03, divided by the gap between 9 percent and 3 percent, or about $12,707 million, worth about $8,259 million today.
From Enterprise Value to Value per Share
Equity value per share (millions of dollars except per share)
| Item | Amount |
|---|---|
| Present value of 2026 through 2030 cash flows | 2,595.9 |
| Present value of terminal value | 8,259.1 |
| Enterprise value | 10,855.0 |
| Plus cash and equivalents | 624.1 |
| Less debt | 0.0 |
| Equity value | 11,479.1 |
| Shares outstanding at fiscal 2025 year end | 165.15 million |
| Value per share | About $69.50 |
The terminal value supplies about 76 percent of enterprise value, so the long-run assumptions matter far more than the five-year forecast. On these inputs, the stock's value is about $69.50, roughly 11 percent below a price of $78.
Sensitivity
Value per share by discount rate and terminal growth
| Discount rate | Terminal growth 2% | Terminal growth 3% | Terminal growth 4% |
|---|---|---|---|
| 8% | $71.80 | $82.80 | $99.20 |
| 9% | $61.90 | $69.50 | $80.10 |
| 10% | $54.60 | $60.00 | $67.30 |
The grid shows that the stock is fairly valued if investors require 8 percent and expect about 3 percent growth forever, or if they require 9 percent and expect 4 percent. A single point on either input moves the value by $10 to $20 a share.
What the Price Implies
Holding the 9 percent discount rate and 3 percent terminal growth fixed, the five-year growth rate that makes the model equal $78 is about 7.8 percent a year. That is well above management's 2026 outlook of low single-digit organic growth and mid-single-digit growth including acquisitions, and above Graco's own record of 2.4 percent, minus 3.7 percent and 5.8 percent sales growth in the last three years. The market appears to be pricing either faster growth, a lower required return than 9 percent, or both.
Testing the Growth Assumption
The 5 percent growth rate rests on three pieces. Organic growth in the low single digits, which management guided to for 2026, accounts for perhaps 2 to 3 points. Acquisitions, which added roughly two points of growth in 2025, could add a similar amount if Graco keeps buying at its recent pace. Pricing, which the industry analysis found Graco can usually sustain, adds the rest. A 5 percent rate therefore assumes Graco keeps acquiring, which also means part of the cash counted as free cash flow will be spent on purchases that must earn the 9 percent hurdle. The rate is also below the 7.8 percent the price implies, the gap identified in the previous section, which means the market is assuming either a faster pace of acquisitions, stronger organic growth than management has guided to, or a lower required return than this analysis uses. If acquisitions stop, growth near 3 percent would be more realistic, and the base-case value would fall to about $64.
Margin and Reinvestment Check
Growth requires investment. A company growing 5 percent needs more inventory, receivables and, over time, plant capacity. Graco's recent expansion left it with spare factory capacity, so the $100 million a year of capital spending in the model, close to depreciation, should support modest growth for several years. Working capital is a smaller concern: inventory days have fallen and could fall further. The forecast also holds free cash flow margins roughly constant at about 26 percent of sales, which matches 2025 once capital spending is normalized. If the free cash flow margin slipped two points, much as operating margin did in 2024, value would fall by about $5 a share, to roughly $64.
Relative Valuation
At $78 and 2025 diluted earnings of $3.08, Graco trades at about 25 times earnings. Its enterprise value of about $12.2 billion is about 20 times 2025 operating earnings, adjusted for the one-time contingent consideration gain, and about 5.5 times sales. Liu et al. (2002) found that forward earnings multiples generally value companies more accurately than multiples of sales or cash flow, which makes the earnings multiple the most useful of the three. A price-to-earnings ratio of 25 is high for an industrial manufacturer, but Graco's net margin above 23 percent, its lack of debt and the stability shown in Milestone One are the kinds of traits investors pay a premium for. The multiples agree with the DCF that the price already assumes a strong future.
Conclusion
The base-case value is about $69.50 a share, with a reasonable range of roughly $60 to $83. At about $78, Graco's shares look fully valued: the price implies cash flow growth close to 8 percent a year, ahead of management's own guidance. The final project will weigh this against the company's quality and its use of cash.
References
Graco Inc. (2026). Form 10-K for the fiscal year ended December 26, 2025. U.S. Securities and Exchange Commission. https://www.sec.gov/Archives/edgar/data/42888/000004288826000081/ggg-20251226.htm
Kaplan, S. N., & Ruback, R. S. (1995). The valuation of cash flow forecasts: An empirical analysis. The Journal of Finance, 50(4), 1059-1093. https://doi.org/10.1111/j.1540-6261.1995.tb04050.x
Liu, J., Nissim, D., & Thomas, J. (2002). Equity valuation using multiples. Journal of Accounting Research, 40(1), 135-172. https://doi.org/10.1111/1475-679X.00042
What the FIN 470 Module 5 instructions ask for
Milestone Two in FIN 470 usually asks you to estimate the intrinsic value of your company's stock and compare it with the market price. Expect to project free cash flow for several years, discount it at the cost of capital from your earlier module, add a terminal value, and convert enterprise value to value per share by adjusting for cash and debt. Many versions also ask for a relative valuation using multiples such as price to earnings or enterprise value to EBITDA, and for a discussion of the assumptions that drive the result. A strong milestone states every input with its source, normalizes unusual years, shows a sensitivity table and explains what the market price implies rather than declaring the stock simply cheap or expensive.
How this FIN 470 Module 5 milestone two example is built
The sample starts from Graco's 2025 cash flow: $684 million from operations and $46 million of capital spending, unusually low after a plant expansion. Using management's planned $100 million of capital spending gives normalized free cash flow of about $580 million. Growing that 5 percent a year for five years and discounting at 9 percent, with 3 percent growth after year five, gives an enterprise value of about $10.9 billion. Adding $624 million of cash and dividing by 165.15 million shares yields about $69.50 a share, against a price near $78. A grid shows values from about $55 to $99 across reasonable inputs, the price implies roughly 7.8 percent yearly growth, and multiples of 25 times earnings confirm a premium valuation.
Where the FIN 470 Module 5 rubric puts the points
Valuation milestones are typically graded on the reasonableness and sourcing of forecast assumptions, the correct mechanics of discounting, terminal value and the bridge to equity value per share, the sensitivity analysis, the relative valuation and the interpretation of results against the market price. Top papers normalize unusual cash flows, keep terminal growth below long-run economic growth, show how much of value sits in the terminal period and explain what the market is assuming. Points are lost for growth rates copied from a single strong year, for discounting at a rate inconsistent with the cash flows, for forgetting cash or debt in the equity bridge and for treating one value as precise.
FIN 470 Module 5 help: the mistakes that cost points
The most damaging error in a first valuation is building the forecast on an unusual year. Look at capital spending, working capital and one-time items in the base year and adjust them, explaining why. Keep terminal growth at or below about 3 percent and report what share of total value comes from the terminal period, since it is usually most of it. Then turn the question around: instead of only asking what the stock is worth, solve for the growth rate the current price requires and compare it with management's guidance and the industry outlook. Use multiples as a check, not a second answer, and explain why a company with high margins and no debt might deserve a premium.
Get FIN 470 Module 5 written to your instructions
Send the FIN 470 Milestone Two guidelines, your Milestone One file and the discount rate from your cost of capital work. We normalize free cash flow, build the forecast and terminal value, add a sensitivity grid and the growth the price implies, and test it all against multiples. About two days, with the first milestone free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 470 papers and related BS Finance samples
- FIN 470 Module 1 Discussion: Choosing a Company Worth a Whole Term
- FIN 470 Module 2 Industry Analysis Assignment: Graco's Place in Fluid Handling
- FIN 470 Module 3 Milestone One: Three Years of Statements and Ratios
- FIN 470 Module 4 Cost of Capital Assignment: A WACC for a Company With No Debt
- FIN 470 Module 6 Capital Allocation Assignment: Dividends, Buybacks and the 2025 Repurchase
- FIN 470 Module 7 Final Project: The Integrated Analysis and Recommendation
- FIN 470 Module 8 Discussion: What the Capstone Changed in How I Read a Company
- BUS 496 Module 2 Project Proposal Assignment: Scope, Deliverables and a Timeline Agreed With the Client
- SPT 208 Module 7 Final Project: The Hoarfrost Sport Marketing Plan
- SPT 333 Module 3 Milestone One: The Issue and Its Stakeholders
- OL 317 Module 6 Operations and Staffing Assignment: Booth Rental Versus Employees
FIN 470 Module 5 questions, answered
Where can I find a free FIN 470 Module 5 Milestone Two sample?
This page has the full FIN 470 Module 5 milestone: a Graco Inc. discounted cash flow, a sensitivity grid, the growth the share price implies and a check against multiples.
How do you calculate a terminal value?
A common method grows the final forecast year's free cash flow by a long-run rate and divides by the discount rate minus that rate, then discounts the result back to today.
What is normalized free cash flow?
Free cash flow adjusted to remove unusual items in the base year, such as abnormally low capital spending or one-time working capital swings, so the forecast starts from a sustainable level.
What does the market price imply in a DCF?
Solving the model for the growth rate or discount rate that makes the estimated value equal the current price shows what investors are assuming.
Why use multiples as well as a DCF?
Multiples show how the market prices similar earnings or cash flows and provide a check on whether the DCF's assumptions are far from what investors accept.