| Course | FIN 470 Undergraduate Finance Capstone |
|---|---|
| Module | Module 1 |
| Paper type | undergraduate discussion post on selecting a company for the capstone |
| Length | About 360 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Finance |
| Updated | October 2026 |
Free sample paper for FIN 470 Module 1
Module One Discussion
Why Graco, and What I Want to Find Out
I chose Graco Inc. (NYSE: GGG), a Minneapolis manufacturer of equipment that moves, measures and sprays fluids and powders: the airless paint sprayers contractors carry onto job sites, pumps that move sealants on automotive lines, powder coating systems and pumps for semiconductor plants. In its fiscal 2025 Form 10-K, Graco reported revenue of $2.24 billion, net income of $522 million and $684 million of operating cash flow, with $624 million of cash and no long-term debt (Graco Inc., 2026).
I first considered a large conglomerate, but its dozens of businesses would make the industry module a survey. Graco has one coherent business sold mostly through distributors, reported since January 2025 in three segments: Contractor, about 48 percent of sales, Industrial, 45 percent, and Expansion Markets, 7 percent. That is enough structure to analyze without losing the thread. Its lack of debt simplifies the cost of capital, which lets me focus on the harder input, the cost of equity. Finance chiefs surveyed by Graham and Harvey (2001) named the capital asset pricing model far more often than any rival as their main tool for pricing equity, so I will use it and then test it. Fama and French (1993) showed that firm characteristics such as size and value relate to stock returns, so a mid-sized, highly profitable company is a useful test case. Graco also has a long public record, a fiscal year that ends on the last Friday of December and a 10-K that explains its segment change in plain language, which matters when three years of data must be lined up. Its stock trades heavily on the New York Stock Exchange, so a price and a beta are easy to find.
Four questions will guide the work. Why has a manufacturer kept operating margins near 28 percent? What explains its very high current ratio? Is the stock, near $78 in early October 2026, worth what investors pay? And was the $423 million buyback in 2025 a good use of cash?
Does choosing a company with no debt make the capstone too easy, or does it make the equity questions harder?
References
Fama, E. F., & French, K. R. (1993). Common risk factors in the returns on stocks and bonds. Journal of Financial Economics, 33(1), 3-56. https://doi.org/10.1016/0304-405X(93)90023-5
Graco Inc. (2026). Form 10-K for the fiscal year ended December 26, 2025. U.S. Securities and Exchange Commission. https://www.sec.gov/Archives/edgar/data/42888/000004288826000081/ggg-20251226.htm
Graham, J. R., & Harvey, C. R. (2001). The theory and practice of corporate finance: Evidence from the field. Journal of Financial Economics, 60(2-3), 187-243. https://doi.org/10.1016/S0304-405X(01)00044-7
What the FIN 470 Module 1 instructions ask for
The first FIN 470 discussion usually asks you to introduce the company you will analyze through the capstone and explain why you chose it. Prompts may ask about the company's business, industry, recent news and what you expect to learn. Choose with the later modules in mind: you will need three years of financial statements, a stock price, a beta, any debt and its cost, and enough business detail to explain ratios and forecast cash flows. A strong post names the company and its main business, gives a few headline figures from its latest 10-K, lists the questions the capstone will answer and explains why this company suits those questions better than an alternative. Close by asking peers something about their own picks.
How this FIN 470 Module 1 discussion example is built
The sample chooses Graco Inc., the Minneapolis maker of paint sprayers, pumps and fluid-handling equipment. It gives headline figures from the fiscal 2025 10-K: revenue of $2.24 billion, net income of $522 million and no long-term debt. It explains that Graco's three segments, Contractor at about 48 percent of sales, Industrial at 45 percent and Expansion Markets at 7 percent, give the industry module something specific to examine, while its $423 million buyback in 2025 sets up the capital allocation module. It lists four questions for the term and compares the choice with a larger, more complex company before asking classmates whether a debt-free company makes the cost of capital module too simple.
Where the FIN 470 Module 1 rubric puts the points
Opening capstone discussions are generally graded on a clear introduction of the company, a reasoned explanation of the choice, use of current data from a primary source, connection to the capstone's later analysis and engagement with peers. Strong posts use the 10-K, not only news articles, and prove the student has already looked for the data later modules will need. Points come off for choosing a company only because it is famous, for posts that read like a company profile with no questions, and for replies that never touch a classmate's choice. A citation and a closing question complete the expectations.
FIN 470 Module 1 help: the mistakes that cost points
The most common regret in this course is choosing a company that is hard to analyze. Very large conglomerates, banks and insurers have statements that do not fit standard ratio tools, and firms with recent mergers have broken trend lines. Before you commit, open the latest 10-K and check that you can find three years of income statements, balance sheets and cash flows, a segment breakdown and the debt note. Then write down what you want to learn, since a question gives every later module a purpose. In the post, give two or three headline numbers with the fiscal year they cover. In replies, ask a classmate one practical question about their company, such as how its fiscal year ends or whether it has debt.
Get FIN 470 Module 1 written to your instructions
Send the FIN 470 Module 1 prompt and the companies you are weighing. We test each against what the later modules will demand, pick the one that gives you the most to analyze, and draft a post that sets your questions for the term. Turnaround is close to two days; your opening post is on the house. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 470 papers and related BS Finance samples
- FIN 470 Module 2 Industry Analysis Assignment: Graco's Place in Fluid Handling
- FIN 470 Module 3 Milestone One: Three Years of Statements and Ratios
- FIN 470 Module 4 Cost of Capital Assignment: A WACC for a Company With No Debt
- FIN 470 Module 5 Milestone Two: Discounted Cash Flow and Multiples
- FIN 470 Module 6 Capital Allocation Assignment: Dividends, Buybacks and the 2025 Repurchase
- FIN 470 Module 7 Final Project: The Integrated Analysis and Recommendation
- FIN 470 Module 8 Discussion: What the Capstone Changed in How I Read a Company
- MKT 455 Module 1 Discussion: Campaign Versus Always-On Social Media
- ACC 427 Module 1 Discussion: Where the Digital Evidence Lives
- BUS 400 Module 3 Market Analysis Assignment: Sizing the Boston Market for Herbs and Microgreens
- HRM 425 Module 8 Discussion: Exits That Pass Knowledge On
FIN 470 Module 1 questions, answered
Where can I find a free FIN 470 Module 1 Discussion sample?
This page has the full FIN 470 Module 1 post, which explains why Graco Inc. suits the finance capstone and lists the questions the analysis will answer.
How do you choose a company for a finance capstone?
Choose a public company with a business you can explain, at least three years of comparable statements, segment detail, a traded stock and enough complexity in debt or capital allocation to make the later modules meaningful.
Where do you find a company's financial statements?
In its annual Form 10-K, filed with the Securities and Exchange Commission and available free on the SEC's EDGAR system and the company's investor relations site.
Is a company with no debt a good choice for a capstone?
It can be, because the analysis can focus on operations and cash use, though the cost of capital module will rest almost entirely on the cost of equity.
What does Graco make?
Equipment that moves, measures, mixes, dispenses and sprays fluids and powders, such as paint sprayers for contractors, pumps for factories and dispensing systems for many industries.