| Course | FIN 470 Undergraduate Finance Capstone |
|---|---|
| Module | Module 3 |
| Paper type | undergraduate milestone analyzing financial statements and ratios |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Finance |
| Updated | October 2026 |
Free sample paper for FIN 470 Module 3
Financial Statement and Ratio Analysis of Graco Inc., Fiscal 2023 to 2025
[Student Name]
Southern New Hampshire University
FIN 470: Undergraduate Finance Capstone
Milestone One
[Instructor Name]
[Date]
Financial Statement and Ratio Analysis of Graco Inc., Fiscal 2023 to 2025
Introduction
This milestone analyzes Graco Inc.'s financial statements for fiscal 2023, 2024 and 2025, as reported in its Form 10-K filings (Graco Inc., 2026). Ratios that compare a year's flow with a balance sheet item use the average of the beginning and ending balances. Nissim and Penman (2001) show that disaggregating profitability into operating parts helps forecast future returns, so the analysis moves from margins to turnover to return on equity and ends with cash flow.
The Income Statement
Graco income statement summary (millions of dollars)
| Item | 2023 | 2024 | 2025 |
|---|---|---|---|
| Net sales | 2,195.6 | 2,113.3 | 2,236.6 |
| Gross profit | 1,161.0 | 1,122.5 | 1,173.2 |
| Operating earnings | 646.8 | 570.1 | 624.8 |
| Net earnings | 506.5 | 486.1 | 521.8 |
| Diluted earnings per share | $2.94 | $2.82 | $3.08 |
Sales grew 2.4 percent in 2023, fell 3.7 percent in 2024 as contractor and industrial demand softened, and rose 5.8 percent in 2025, helped by the late-2024 acquisition of Corob and two 2025 acquisitions. Operating earnings in 2025 include a $14 million gain from a change in the fair value of contingent acquisition payments, and 2024 includes $8 million of reorganization charges; adjusted for those, operating earnings rose from about $578 million to $611 million.
Profitability
Profitability ratios
| Ratio | 2023 | 2024 | 2025 |
|---|---|---|---|
| Gross margin | 52.9% | 53.1% | 52.5% |
| Operating margin | 29.5% | 27.0% | 27.9% |
| Net margin | 23.1% | 23.0% | 23.3% |
| Return on assets (average) | 19.6% | 16.6% | 16.3% |
| Return on equity (average) | 24.8% | 20.2% | 19.9% |
Graco's gross margin held within a band of six-tenths of a point through a sales decline and recovery, which supports the industry finding that the company has pricing power. Operating margin dipped in 2024 because operating expenses did not fall as fast as sales. Net margin was steadier still, partly because interest income on large cash balances and a moderate effective tax rate, about 18.6 percent in 2025, offset the operating dip.
DuPont Analysis
DuPont decomposition of return on equity (average balances)
| Component | 2023 | 2024 | 2025 |
|---|---|---|---|
| Net margin | 23.1% | 23.0% | 23.3% |
| Asset turnover | 0.85 | 0.72 | 0.70 |
| Equity multiplier | 1.26 | 1.22 | 1.22 |
| Return on equity | 24.8% | 20.2% | 19.9% |
Return on equity fell by almost five points while net margin did not change. The whole decline came from asset turnover. Total assets grew from $2.72 billion at the end of 2023 to $3.27 billion at the end of 2025, while sales grew only 2 percent. Three things enlarged the asset base: cash, which reached $675 million in 2024; acquisitions, which raised goodwill and other intangible assets by about $280 million; and a factory expansion that lifted net property and equipment from $608 million in 2022 to about $760 million. Fairfield and Yohn (2001) showed that a shift in how hard a firm works its assets carries information about where its profitability is heading next, so the turnover trend deserves a place in the forecast. The equity multiplier is low, about 1.2, because Graco has no long-term debt.
Efficiency
Working capital efficiency
| Ratio | 2023 | 2024 | 2025 |
|---|---|---|---|
| Days sales outstanding | 58 | 62 | 62 |
| Days inventory outstanding | 161 | 155 | 138 |
| Inventory at year end ($ millions) | 438.3 | 404.7 | 401.1 |
Inventory days fell sharply, from 161 to 138, as Graco worked down the inventory it had built during the supply chain problems of 2021 and 2022, when inventory reached $477 million. Receivable days rose slightly, consistent with acquired businesses and distributor terms. Lower inventory released cash, which helps explain the strong operating cash flow below.
Liquidity and Solvency
Liquidity and solvency
| Ratio | 2023 | 2024 | 2025 |
|---|---|---|---|
| Current ratio | 3.46 | 3.69 | 3.15 |
| Cash and equivalents ($ millions) | 538.0 | 675.3 | 624.1 |
| Long-term debt ($ millions) | 0 | 0 | 0 |
| Total liabilities to total assets | 18.3% | 17.7% | 18.9% |
A current ratio above 3 and no long-term debt mean Graco faces almost no liquidity or solvency risk. The more useful question is whether it holds more cash than it needs. Cash equaled about a fifth of total assets in each year. In 2025, Graco used part of that cash to repurchase $423 million of its shares, which the capital allocation module will examine.
Cash Flow
Cash flow summary (millions of dollars)
| Item | 2023 | 2024 | 2025 |
|---|---|---|---|
| Cash from operations | 651.0 | 621.7 | 683.6 |
| Capital expenditures | 184.8 | 106.7 | 45.7 |
| Free cash flow | 466.2 | 515.0 | 637.9 |
| Free cash flow to net income | 0.92 | 1.06 | 1.22 |
Operating cash flow exceeded net income in all three years. Free cash flow rose sharply in 2025 because capital spending fell to $46 million after the plant expansion was completed; the filing points to a return to roughly $100 million of plant spending in 2026, so 2025's free cash flow overstates the normal level. The valuation should use a normalized figure.
Quality of Earnings
A company's reported earnings deserve more trust when cash flow confirms them. Graco's operating cash flow exceeded net income in every year reviewed, by about 29 percent in 2023, 28 percent in 2024 and 31 percent in 2025, mainly because depreciation and amortization, about $107 million in 2025, and stock compensation are expenses that use no cash. Working capital did not flatter the result: the inventory reduction added cash, but receivables grew, partly offsetting it. The 2025 operating earnings did include a $14 million gain from lowering estimated payments owed to the sellers of an acquired business, which is accounting, not operations, and was excluded from the adjusted figures. The effective tax rate of about 18.6 percent in 2025 benefited from deductions on employee stock option exercises, which vary with the share price and should not be assumed to repeat at the same level. Taken together, the quality of Graco's earnings is high, and the adjustments needed are small.
Implications for Valuation
Four findings shape Milestone Two. Margins are high and stable, so the forecast can hold them near current levels. Growth is modest and cyclical, with acquisitions adding to organic growth. Free cash flow should be normalized for capital spending closer to $100 million. And because there is no debt, the cost of capital rests on the cost of equity.
Conclusion
Graco earns margins few manufacturers match, converts earnings fully into cash and carries no debt. Its return on equity has drifted down because cash and acquired assets have grown faster than sales, not because the business has weakened. The analysis points to a high-quality but slow-growing company whose value will depend on how well it uses its cash.
References
Fairfield, P. M., & Yohn, T. L. (2001). Using asset turnover and profit margin to forecast changes in profitability. Review of Accounting Studies, 6(4), 371-385. https://doi.org/10.1023/A:1012430513430
Graco Inc. (2026). Form 10-K for the fiscal year ended December 26, 2025. U.S. Securities and Exchange Commission. https://www.sec.gov/Archives/edgar/data/42888/000004288826000081/ggg-20251226.htm
Nissim, D., & Penman, S. H. (2001). Ratio analysis and equity valuation: From research to practice. Review of Accounting Studies, 6(1), 109-154. https://doi.org/10.1023/A:1011338221623
What the FIN 470 Module 3 instructions ask for
Milestone One in FIN 470 usually asks you to analyze your company's financial statements over at least three years. Expect to lay out the three statements, income, financial position and cash flows, compute ratios for profitability, efficiency, liquidity and solvency, and explain trends. Many versions ask for a DuPont analysis of return on equity and a comparison with industry or a peer. Show the formulas you used and whether balances are year-end or average. A strong milestone does not stop at the numbers: it explains each movement by something the company did, as reported in its 10-K, and identifies which findings matter for the valuation to come.
How this FIN 470 Module 3 milestone one example is built
The sample summarizes Graco's three years: revenue of $2.20 billion, $2.11 billion and $2.24 billion, and net income of $507 million, $486 million and $522 million. Gross margin stays between 52.5 and 53.1 percent and operating margin between 27.0 and 29.5 percent. A DuPont table shows return on equity falling from 24.8 to 19.9 percent while net margin held steady, because asset turnover fell from 0.85 to 0.70 as cash, acquisitions and new plant capacity enlarged the asset base. Inventory days fell from 161 to 138, receivable days rose slightly to 62, the current ratio exceeded 3 and Graco carried no long-term debt. Free cash flow rose to $638 million in 2025 as capital spending dropped to $46 million after a plant expansion cycle.
Where the FIN 470 Module 3 rubric puts the points
The milestone is typically scored on the accuracy of the statements and ratios, the completeness of ratio categories, the DuPont or comparable decomposition, the explanation of trends with evidence, and organization and citation. High-scoring papers show formulas, use consistent averages, explain changes through business events found in the 10-K and identify implications for valuation. Graders also look for a short note on data sources and fiscal year-ends. Points are lost for arithmetic errors, for mixing year-end and average balances, for ratios listed without interpretation, for calling a high current ratio simply good without asking about idle cash, and for ignoring the cash flow statement.
FIN 470 Module 3 help: the mistakes that cost points
The best way to strengthen this milestone is to pair every ratio with a reason. If return on equity fell, find which DuPont part moved and then which line on the balance sheet or income statement caused it. If a ratio looks very strong, ask whether it signals a choice, such as holding large cash balances, that has a cost. Use the management discussion section of the 10-K to find events behind the numbers: acquisitions, plant investments, reorganizations. Check the cash flow statement against earnings; free cash flow well above net income may reflect falling capital spending rather than better operations. Keep the formulas in a short table so your instructor can follow the arithmetic.
Get FIN 470 Module 3 written to your instructions
Upload the FIN 470 Milestone One guidelines with your company's ticker or 10-K. We pull three years of statements, compute each ratio group with the formula shown, break return on equity apart and explain every movement by what the business did. Most come back within two days, and a first milestone is not charged. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 470 papers and related BS Finance samples
- FIN 470 Module 1 Discussion: Choosing a Company Worth a Whole Term
- FIN 470 Module 2 Industry Analysis Assignment: Graco's Place in Fluid Handling
- FIN 470 Module 4 Cost of Capital Assignment: A WACC for a Company With No Debt
- FIN 470 Module 5 Milestone Two: Discounted Cash Flow and Multiples
- FIN 470 Module 6 Capital Allocation Assignment: Dividends, Buybacks and the 2025 Repurchase
- FIN 470 Module 7 Final Project: The Integrated Analysis and Recommendation
- FIN 470 Module 8 Discussion: What the Capstone Changed in How I Read a Company
- FIN 460 Module 6 Milestone Two: Retirement Accounts and Charitable Planning
- FIN 355 Module 7 Final Project: The Haskells' Insurance Plan
- ACC 311 Module 7 Project Two: A Make-or-Buy Memo on Hydraulic Valve Kits
- ACC 423 Module 8 Discussion: The CFO's Choice
FIN 470 Module 3 questions, answered
Where can I find a free FIN 470 Module 3 Milestone One sample?
This page has the full FIN 470 Module 3 milestone: three years of Graco Inc.'s statements, ratio groups, a DuPont breakdown and cash flow analysis, each explained.
What is DuPont analysis?
Splitting return on equity into three multiplied pieces, profit per dollar of sales, sales per dollar of assets and assets per dollar of equity, to see whether returns come from margins, efficiency or borrowing.
Should ratios use year-end or average balances?
Ratios that compare a full year's flow, such as sales or net income, with a balance sheet item are usually more accurate with the average of the beginning and ending balances.
Why might return on equity fall when profit margins hold steady?
Because assets grew faster than sales, for example through cash buildup or acquisitions, which lowers asset turnover even when each dollar of sales is just as profitable.
What is free cash flow?
Cash from operations minus capital expenditures, the cash a business generates after maintaining and expanding its productive assets.