Free sample paper for INT 315 Module 6
The Feel of the Cement: Moving Tacit Know-How Between Medford and Binh Duong
[Student Name]
Southern New Hampshire University
INT 315: International Management
Knowledge Transfer Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Feel of the Cement: Moving Tacit Know-How Between Medford and Binh Duong
Introduction
Siskiyou Trail Works has sent detailed specifications to contract factories in Vietnam for fifteen years. Its own plant in Binh Duong will need more than that. The company's reputation rests on shoes that survive hundreds of miles of rough trail, and much of what makes them durable is known by Medford's engineers and sample makers but has never been written down. This assignment identifies the knowledge the plant needs, separates codified from tacit knowledge, explains why transfers of this kind often stick, applies research on how practices take root in subsidiaries and how tacit knowledge is shared and recommends mechanisms and measures, including for knowledge that should flow from Vietnam back to Oregon.
What Must Move
Some of Siskiyou's knowledge is codified: specifications, bills of materials, test protocols for sole adhesion and abrasion and quality checklists. These can be sent, translated and stored in the plant's systems. Much of the rest is tacit. Experienced sample makers in Medford judge by touch when cement has reached the right tack before pressing a sole, adjust stitch tension by sound and feel on lightweight mesh and know how a last should be shaped for a particular model's fit. Engineers know why certain specifications exist, such as the reason for a reinforced toe on one model, which matters when the plant proposes changes.
Why Transfers Stick
Szulanski (1996) studied transfers of best practice within firms and concluded that motivation was rarely the problem; transfers stalled when the receiving unit could not yet absorb the knowledge, when nobody could say exactly why the practice worked and when the two sides had a strained, distant relationship. Each applies here. The plant's workers are experienced in footwear but new to Siskiyou's lightweight materials. Medford's engineers sometimes cannot explain why a technique works. And the relationship between Medford and Binh Duong is new, distant and conducted across languages.
Taking Root
Kostova (1999) argued that transferring a practice to a subsidiary succeeds fully only when the practice is both implemented, followed in its formal rules, and internalized, valued and believed in by employees. Internalization depends on the regulatory, cognitive and normative fit between the practice and the local context and on relationships between the units. A quality practice imposed through checklists alone might be implemented but not internalized: workers would tick boxes without understanding why. Nonaka (1994) described organizational knowledge creation as a spiral in which tacit knowledge is shared through common experience, made explicit through dialogue and documentation, combined with other knowledge and internalized again through practice. Transferring Siskiyou's know-how means going around that spiral with Vietnamese colleagues, not simply sending documents.
Mechanisms
Knowledge types and transfer mechanisms
| Knowledge | Type | Mechanism |
|---|---|---|
| Specifications and bills of materials | Codified | Translated digital files, controlled document system |
| Test protocols | Codified with judgment | Training plus joint testing of first lots |
| Cement tack, stitch tension, lasting feel | Tacit | Paired sample makers working side by side for eight weeks |
| Reasons behind specifications | Partly tacit | Resident engineer, design intent notes in Vietnamese |
| Process improvements found in the plant | Tacit to codified | Joint problem-solving forum, shared improvement log |
Before the doors open, three of Medford's sample makers will work for two months at the benches next to the Vietnamese lead workers who will train others. Short video work instructions, filmed in Binh Duong with Vietnamese narration, will show each critical step. The resident Oregon engineer will write design intent notes explaining why each key specification exists, translated into Vietnamese. And a monthly joint problem-solving forum, by video, will bring plant engineers and Medford designers together around specific defects.
Reverse Transfer
Knowledge should flow both ways. Vietnamese lead workers and engineers bring experience from other brands' factories that Siskiyou lacks, such as faster ways to stitch complex uppers. The improvement log will record ideas from the plant, and the best will be tested in Medford's sample room and shared with contract factories. Recognizing those contributions publicly will also strengthen the relationship Szulanski identified as critical, and it signals to the plant's engineers that their expertise is valued rather than merely supervised.
Measures
Siskiyou will track first-pass quality yield on each model compared with the contract factories, sole adhesion failures in testing, the time new workers take to reach standard output on critical steps, the number of plant-originated improvements adopted elsewhere and an annual survey asking plant engineers and lead workers whether they understand why key specifications exist. The last measure speaks directly to internalization. Results will be reviewed after each of the first three production seasons, and mechanisms that are not working, for example videos that workers skip, will be replaced rather than repeated.
Risks
The sample makers' eight weeks may not be enough for the most complex models, so Siskiyou should plan follow-up visits in the first peak season. Turnover among trained lead workers would drain tacit knowledge, linking this plan to the HR milestone's retention measures. And if Medford treats the plant only as a recipient, reverse transfer will wither. A last risk is language: technical terms in footwear do not always have settled Vietnamese equivalents, and inconsistent translations can confuse workers. The plant will build a bilingual glossary of key terms, maintained by the resident engineer and the quality manager, and use it in every document and video.
Cost and Timing
The sample makers' eight-week stay costs about $70,000 in travel, lodging and wages. Video instructions for the first twenty critical steps cost about $25,000 to produce locally. The resident engineer is already budgeted in the staffing plan. The joint forum and improvement log require mainly time. The work must begin about three months before opening so that lead workers are trained before the first production orders, and the first measures get their first review once the opening peak season is over.
Conclusion
Siskiyou's specifications can travel by email; the know-how that makes its shoes durable must travel through people. Pairing, video instruction, design intent notes and joint problem-solving, measured carefully and running in both directions, give the Binh Duong plant its best chance to make a Siskiyou shoe that feels and lasts like one.
References
Kostova, T. (1999). Transnational transfer of strategic organizational practices: A contextual perspective. Academy of Management Review, 24(2), 308-324. https://doi.org/10.2307/259084
Nonaka, I. (1994). A dynamic theory of organizational knowledge creation. Organization Science, 5(1), 14-37. https://doi.org/10.1287/orsc.5.1.14
Szulanski, G. (1996). Exploring internal stickiness: Impediments to the transfer of best practice within the firm. Strategic Management Journal, 17(S2), 27-43. https://doi.org/10.1002/smj.4250171105
What the INT 315 Module 6 instructions ask for
The knowledge transfer assignment in INT 315 usually asks you to analyze how a multinational shares knowledge, practices or technology between headquarters and subsidiaries, or among subsidiaries. Expect to identify the knowledge involved, explain barriers such as tacitness, absorptive capacity, cultural and institutional distance and motivation, and recommend mechanisms such as expatriates, training, teams, documentation and information systems. A strong paper distinguishes kinds of knowledge, uses research to explain why transfers succeed or fail, considers whether the practice will be understood and valued locally rather than merely copied, recommends mechanisms matched to each kind of knowledge and proposes ways to measure whether transfer occurred, including reverse flows.
How this INT 315 Module 6 knowledge transfer assignment example is built
The sample examines what Siskiyou Trail Works must move from Medford to its Binh Duong plant. Specifications, bills of materials and test standards are codified and easy to send. Much of what makes a Siskiyou shoe durable is tacit: judging when cement has reached the right tack, how much tension a stitch needs on a light mesh, how a last should feel in the hand. Using Szulanski's finding that transfers stick because of the recipient's absorptive capacity, causal ambiguity and difficult relationships, Kostova's distinction between implementing and internalizing a practice, and Nonaka's cycle of knowledge creation, it recommends paired engineers, video work instructions, a joint problem-solving forum and measures in both directions.
Where the INT 315 Module 6 rubric puts the points
The assignment is generally scored on identification of the knowledge to be transferred, analysis of barriers, application of knowledge transfer research, the fit of recommended mechanisms and the use of sources and APA style. The highest-scoring papers separate codified from tacit knowledge, explain stickiness with evidence, match mechanisms to knowledge types, consider whether local staff will value the practice and include reverse transfer. Papers lose credit for treating transfer as emailing manuals, for ignoring tacit knowledge, for overlooking the recipient's capacity and motivation, for missing measures and for assuming headquarters always knows best. A measure aimed at whether staff understand why a practice exists, not just whether they follow it, tends to impress.
INT 315 Module 6 help: the mistakes that cost points
List the specific knowledge that must move, then sort it into what can be written down, such as specifications, and what lives in people's hands and judgment, such as how a material should feel. Each kind needs a different mechanism: documents and systems for the first, apprenticeship, pairing and observation for the second. Use research on why transfers stick, including the recipient's ability to absorb knowledge and the relationship between source and recipient. Ask whether local staff will understand and value the practice or merely comply. Include knowledge flowing back from the subsidiary. Finish with measures, such as defect rates or time to master a process, that show whether transfer happened.
Get INT 315 Module 6 written to your instructions
Upload the INT 315 Module 6 instructions and the knowledge your company needs to move. We sort codified from tacit knowledge, explain what makes the transfer sticky, apply knowledge transfer research and recommend mechanisms and measures in both directions. About two days; first assignments are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More INT 315 papers and related BS International Business samples
- INT 315 Module 1 Discussion: What Changes When the Factory Is Yours
- INT 315 Module 2 Organizational Structure Assignment: How Much Should Binh Duong Decide?
- INT 315 Module 3 Milestone One: Staffing the Plant
- INT 315 Module 4 Discussion: Leading Line Supervisors in Vietnam
- INT 315 Module 5 Milestone Two: Pay, Training and the Union at Binh Duong
- INT 315 Module 7 Final Project: The International Management Plan
- INT 315 Module 8 Discussion: Overtime in Peak Season
- BUS 400 Module 7 Project Two: The Business Case and the Plan
- HRM 360 Module 3 Milestone One: Who Leaves, and When
- INT 221 Module 5 Milestone Two: Correspondent Banks, Letters of Credit and the Retreat
- FIN 450 Module 7 Final Project: Portfolio Analysis and Performance Evaluation
INT 315 Module 6 questions, answered
Where can I find a free INT 315 Module 6 Knowledge Transfer Assignment sample?
The full INT 315 Module 6 assignment is on this page, analyzing how a shoe company moves tacit know-how between Oregon and Vietnam.
What is tacit knowledge?
Knowledge that is hard to write down or explain, held in people's skills, judgment and experience, such as knowing by touch when a material is ready.
What is internal stickiness?
Szulanski's term for the difficulty of transferring best practices within a firm, caused by factors such as the recipient's limited absorptive capacity, causal ambiguity and strained relationships.
What is the difference between implementing and internalizing a practice?
Kostova distinguished following a practice's rules from valuing and believing in it; transfers succeed more fully when subsidiary staff internalize the practice.
How do multinationals transfer knowledge to subsidiaries?
Through expatriates and visits, training, joint teams, documentation and information systems, with personal contact especially important for tacit knowledge.