| Course | INT 315 International Management |
|---|---|
| Module | Module 4 |
| Paper type | undergraduate discussion post on cross-cultural leadership |
| Length | About 360 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS International Business |
| Updated | October 2026 |
Free sample paper for INT 315 Module 4
Module Four Discussion
Silence at the Stitching Line
Two months before opening, Siskiyou's resident product engineer from Oregon held a meeting on the pilot line in Binh Duong to review a new stitching sequence for our lightest trail shoe. Twelve line supervisors attended, along with the plant's Vietnamese production manager. The engineer asked, as he would in Medford, for everyone to point out problems. No one spoke. He took the silence as agreement. That afternoon, three supervisors separately told the production manager about problems with thread tension and a seam that would rub the heel.
Javidan et al. (2006), summarizing the GLOBE project, reported that managers almost everywhere prized honesty, a sense of direction and the knack of building a team, while others, such as participative behavior and status consciousness, were valued very differently. Asking supervisors to criticize a plan publicly, in front of their own manager, assumed a participative norm and a low sensitivity to status that this group may not share. Hofstede (2011) cautions that national culture scores describe societies, not individuals, so the silence may also reflect the people, the newness of the plant and fear of seeming disloyal in a first job.
In hospital intensive care units, Nembhard and Edmondson (2006) saw that people further down the professional ladder felt safer raising concerns when their unit leaders actively asked for their views and thanked them for it. The supervisors were the lowest-status people in that meeting, facing a foreign engineer and their own boss. Inclusiveness would have to be shown, not just announced.
First, collect input before the group meeting, through the production manager and in small groups of three or four supervisors. Second, ask specific questions, such as where the thread will be hardest to control, rather than whether there are problems. Third, credit the supervisors by name when their ideas change the sequence, so speaking up visibly pays. The engineer should also ask the production manager how she prefers to hear concerns, since she knows these supervisors far better than anyone from Oregon.
How does bad news reach managers where you work, and does it travel through the meeting or around it?
References
Hofstede, G. (2011). Dimensionalizing cultures: The Hofstede model in context. Online Readings in Psychology and Culture, 2(1). https://doi.org/10.9707/2307-0919.1014
Javidan, M., Dorfman, P. W., de Luque, M. S., & House, R. J. (2006). In the eye of the beholder: Cross cultural lessons in leadership from Project GLOBE. Academy of Management Perspectives, 20(1), 67-90. https://doi.org/10.5465/amp.2006.19873410
Nembhard, I. M., & Edmondson, A. C. (2006). Making it safe: The effects of leader inclusiveness and professional status on psychological safety and improvement efforts in health care teams. Journal of Organizational Behavior, 27(7), 941-966. https://doi.org/10.1002/job.413
What the INT 315 Module 4 instructions ask for
The leadership discussion in INT 315 usually asks how culture shapes what people expect from leaders and how managers should lead teams from other cultures. Prompts may ask you to apply the GLOBE study or Hofstede's dimensions, to discuss whether some leadership qualities are universal or to analyze a cross-cultural leadership situation. A good post examines one specific encounter, uses research to explain what the people involved likely expected, separates universal leadership qualities from culturally contingent ones, avoids treating national averages as descriptions of individuals, proposes concrete behavior changes and invites peers to describe how authority and feedback actually travel where they work. Some prompts also ask how a leader should handle disagreement once it does surface.
How this INT 315 Module 4 discussion example is built
The sample describes a pilot-line meeting at Siskiyou Trail Works' plant in Binh Duong where the resident Oregon product engineer asked twelve line supervisors, in front of the plant's production manager, to point out problems with a new stitching sequence. No one spoke. Afterward, three supervisors privately described problems that would have caused defects. The post uses Javidan and colleagues' GLOBE findings on universally valued and culturally contingent leader behaviors, Hofstede's caution against reading individuals from national averages and Nembhard and Edmondson's evidence that leader inclusiveness raises psychological safety for lower-status staff, then proposes three changes and asks peers how feedback reaches their managers. Each proposed change is tied to a research finding, so the advice reads as reasoned rather than generic.
Where the INT 315 Module 4 rubric puts the points
The leadership thread in INT 315 tends to be scored on understanding of cross-cultural leadership research, analysis of the encounter, avoidance of stereotypes, practical recommendations and engagement with classmates. Top posts explain behavior with evidence, separate what is universal from what is culture-specific, show awareness of status and hierarchy and offer specific changes. Credit is lost for generalizations about Asian workers, for advice limited to being respectful, for ignoring the role of status in the meeting, for missing research and when a reply swaps stories without saying what a leader should do differently. Noticing who held power in the room, not only which country people came from, tends to mark a post as analytical.
INT 315 Module 4 help: the mistakes that cost points
Describe one moment closely: who was in the room, who spoke, what was asked and what happened afterward. Then ask what the people involved likely expected from a leader in that setting. Research such as GLOBE shows that some leader qualities, like integrity and vision, are valued nearly everywhere, while others, like participative styles, vary. Remember that status in the room matters as much as national culture. Avoid statements about whole peoples. Propose changes a manager could make tomorrow, such as collecting input privately or in small groups first. End by asking classmates how bad news reaches managers in their own workplaces, which draws honest replies.
Get INT 315 Module 4 written to your instructions
Send the INT 315 Module 4 prompt and a moment when leading across cultures did not go as planned. We explain it with leadership research, suggest practical changes and end by asking peers how bosses hear bad news in their own jobs. Turnaround is a couple of days; opening posts carry no fee. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More INT 315 papers and related BS International Business samples
- INT 315 Module 1 Discussion: What Changes When the Factory Is Yours
- INT 315 Module 2 Organizational Structure Assignment: How Much Should Binh Duong Decide?
- INT 315 Module 3 Milestone One: Staffing the Plant
- INT 315 Module 5 Milestone Two: Pay, Training and the Union at Binh Duong
- INT 315 Module 6 Knowledge Transfer Assignment: Moving Medford's Know-How
- INT 315 Module 7 Final Project: The International Management Plan
- INT 315 Module 8 Discussion: Overtime in Peak Season
- MKT 337 Module 5 Milestone Two: The Questionnaire and Measurement Plan
- OL 125 Module 2 Communication Analysis Assignment: Communication Breakdown at Shift Change
- BUS 496 Module 8 Final Reflection: What a Semester of Client Work Taught
- PSY 270 Module 3 Selection System Memo: Hiring technicians who stay
INT 315 Module 4 questions, answered
Where can I find a free INT 315 Module 4 Discussion sample?
The full INT 315 Module 4 post is on this page, explaining why Vietnamese supervisors stayed silent in a group meeting and how to lead differently.
Are some leadership traits valued in every culture?
The GLOBE study found that traits such as integrity, vision, decisiveness and being a team builder were widely seen as contributing to effective leadership across cultures.
Which leadership behaviors vary across cultures?
GLOBE found that participative style, status consciousness, individualism and risk taking were valued very differently from one society to another.
Why might employees stay silent in group meetings?
Status differences, fear of embarrassing a superior or colleague, uncertainty about consequences and norms about disagreement in public can all discourage speaking up.
How can a foreign manager get honest feedback from a team?
Ask in smaller groups or privately first, involve local supervisors in collecting input, respond visibly to concerns raised and avoid putting individuals on the spot in front of superiors.