QSO 328 Module 3 Project One Example

Reviewed by Portia Lambrick, MBA

This QSO 328 Module 3 Project One sample assesses the environmental and economic sustainability of an operation across its product's life cycle, with the stakeholder pressures it faces and its priorities. SNHU QSO 328 (QSO-328) collects this assessment in Module 3 of its BS Operations Management sustainable operations course. The operation is Cumberland Clay Tile, an invented Tennessee maker of porcelain and ceramic tile. Following one square foot of tile from clay pit to landfill, the paper finds that drying and firing dominate energy and emissions, with raw materials and trucking a large second share, then weighs pressure from retailers, architects and the local landfill and ranks five priorities for improvement.

CourseQSO 328 Sustainable Operations
ModuleModule 3
Paper typeundergraduate project assessing the environmental and economic sustainability of an operation across its product's life cycle, with stakeholder pressures and priorities
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 328 Module 3

1

From Clay Pit to Kitchen Floor: A Life Cycle Sustainability Assessment of Cumberland Clay Tile

[Student Name]

Southern New Hampshire University

QSO 328: Sustainable Operations

Project One: Sustainability Assessment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe life cycle figures, stakeholders and comparisons for Cumberland Clay Tile in this QSO 328 project are fictional.
2

From Clay Pit to Kitchen Floor: A Life Cycle Sustainability Assessment of Cumberland Clay Tile

Introduction

The Module 2 baseline measured Cumberland Clay Tile's energy, emissions, water and waste at the plant. This project widens the view. It follows a square foot of porcelain floor tile from the clay pit to the end of its life, estimating where its environmental impacts arise, then examines the costs and risks those impacts create, the pressures from stakeholders and how the plant compares with efficient producers. It ends with ranked priorities that Project Two will turn into a plan. Hart (1995) argued that firms can gain advantage from pollution prevention, product stewardship and, in the longest view, sustainable development; a life cycle view shows where each of those strategies applies.

What this page is doingStates the purpose and approach.
3

The Life Cycle of a Square Foot of Tile

Clay, feldspar and sand are mined in Tennessee, Kentucky and North Carolina, processed and trucked to the plant. There they are ground with water into a slurry, spray dried into a fine powder, pressed into tile, dried again, glazed and fired at about 2,200 degrees. Fired tile is sorted, boxed in cardboard, stacked on wood pallets and shrink-wrapped, then trucked to distribution centers and job sites, mostly within 600 miles. A porcelain floor tile lasts 50 years or more with little maintenance, and at the end of a building's life it is usually landfilled with demolition debris.

Estimated life cycle carbon emissions of Cumberland's porcelain tile (invented estimates)

StageShare of life cycle emissionsControlled or influenced
Raw material mining and processing18 percentInfluenced
Spray drying and firing51 percentControlled
Other plant operations, mainly electricity15 percentControlled
Packaging4 percentControlled and influenced
Trucking to customers12 percentInfluenced
Use and end of lifeUnder 1 percentInfluenced

Two-thirds of life cycle emissions arise inside the plant, mainly in drying and firing, where the company has direct control. Matos and Hall (2007), studying how firms applied life cycle assessment, found that it was most useful when it shaped design and supply chain choices and least useful when it produced a report no one acted on; the table matters only if it changes where the company invests.

What this page is doingEstimates impacts by stage.
4

Water and Waste Across the Life Cycle

Water use is concentrated in the plant, in slurry preparation and glaze cleaning. Waste occurs at three points: fired scrap and glaze sludge at the plant, cutting offcuts on job sites, typically 7 to 10 percent of tile purchased, and demolition at end of life. The job-site offcuts are tile the plant made and fired, so reducing them, or taking them back, would cut life cycle waste and energy.

What this page is doingExtends the view beyond carbon.
5

The Economic Picture

Energy is about 14 percent of the plant's cost of goods. Gas prices have swung widely in the past five years, so energy efficiency is also a hedge against price risk. Landfill costs for fired scrap and sludge total about $770,000 a year, and the county has announced a 30 percent increase in tipping fees over three years as the local landfill nears capacity. Fired scrap also wastes about $1.4 million a year in raw materials, labor and energy already spent. On the revenue side, the plant's largest home improvement customer has said that from 2027 it will give preference to suppliers with environmental product declarations and published reduction targets.

What this page is doingTies impacts to costs and risks.
6

Stakeholder Pressures

The home improvement chain, which buys about 35 percent of output, wants product declarations, a carbon reduction target and less packaging. Architects specifying tile for commercial projects want declarations to earn green building credits and favor products with recycled content. The county wants less waste in its landfill. Employees want cooler working conditions near the kilns. Lenders financing a planned kiln replacement have begun asking about energy and emissions risk. Klassen and Vachon (2003) found that collaboration with customers and suppliers on environmental issues was associated with plants investing more in pollution prevention rather than only control, which suggests that the customer's questionnaire could become an opportunity rather than only a burden.

What this page is doingDescribes what each stakeholder wants.
7

Comparison With Industry Practice

Efficient roller kilns with heat recovery use roughly 15 to 25 percent less gas per square foot than the plant's older tunnel kiln, according to equipment makers and an industry energy guide. Many tile plants grind a share of fired scrap back into new tile bodies, which Cumberland does not. Closed-loop glaze water systems are common in newer plants. On these measures Cumberland is behind efficient peers but has clear paths to catch up.

What this page is doingBenchmarks the plant.
8

Risks of Doing Nothing

If the plant makes no changes, its position worsens in three ways. Landfill costs rise by about $230,000 a year by 2028 as the county's fee increase takes effect. The home improvement chain's 2027 supplier preference could shift volume to competitors that already publish declarations, and even a 10 percent loss of that customer's business would cost about $3 million in sales. And the tunnel kiln, now 26 years old, will need major repairs within five years, so continuing to run it without a plan risks an expensive emergency rather than a planned replacement. These risks make the improvement plan a matter of competitiveness, not only of environmental performance.

What this page is doingExplains the cost of standing still.
9

Priorities

Five priorities emerge, ranked by size of impact, degree of control and economic return. First, cut kiln and dryer gas through heat recovery and, over time, replacement of the tunnel kiln. Second, cut fired scrap at the source through better process control and grind the remainder into new tile bodies. Third, close the glaze water loop to cut fresh water and sludge. Fourth, reduce packaging and set up pallet returns with the largest customer. Fifth, work with raw material suppliers and carriers on emissions data and lower-carbon shipping. The first three are within the plant's control and should save money; the last two depend on partners.

What this page is doingRanks what to improve.
10

Limits of the Assessment

The life cycle shares rest on estimates for mining, packaging and trucking drawn from industry averages, so they could be off by several percentage points, and they cover carbon more fully than water or land use. A formal declaration will require a third-party review of these figures.

What this page is doingNotes what the estimates cannot show.
11

Conclusion

Most of the tile's life cycle impact arises in drying and firing, where Cumberland has control and where efficiency and cost savings align. Project Two will plan the first four priorities with costs, paybacks and targets.

What this page is doingSets up Project Two.
12

References

Hart, S. L. (1995). A natural-resource-based view of the firm. Academy of Management Review, 20(4), 986-1014. https://doi.org/10.5465/amr.1995.9512280033

Klassen, R. D., & Vachon, S. (2003). Collaboration and evaluation in the supply chain: The impact on plant-level environmental investment. Production and Operations Management, 12(3), 336-352. https://doi.org/10.1111/j.1937-5956.2003.tb00207.x

Matos, S., & Hall, J. (2007). Integrating sustainable development in the supply chain: The case of life cycle assessment in oil and gas and agricultural biotechnology. Journal of Operations Management, 25(6), 1083-1102. https://doi.org/10.1016/j.jom.2007.01.013

What the QSO 328 Module 3 instructions ask for

QSO 328 Project One typically asks students to assess the sustainability of an operation, often using a life cycle perspective that follows a product from raw materials through production, distribution, use and end of life. Expect to identify the main environmental impacts at each stage, assess the economic costs and risks related to them, describe the pressures from customers, regulators, communities and investors, compare the operation with industry practice and identify priorities for improvement. Strong projects use quantitative estimates wherever possible, distinguish impacts the operation controls from those it can only influence, connect environmental performance to cost and competitiveness and set up the improvement plan for Project Two.

How this QSO 328 Module 3 project one example is built

The project assesses Cumberland Clay Tile, a fictional plant making about 19 million square feet of tile a year. Following one square foot through its life, it estimates that raw material mining and processing account for about 18 percent of life cycle carbon emissions, spray drying and firing about 51 percent, other plant operations 15 percent, packaging 4 percent, trucking 12 percent and disposal under 1 percent, with negligible emissions during decades of use. It adds pressure from a home improvement chain demanding environmental product declarations, architects seeking low-impact materials and a county landfill raising fees, compares the plant's gas use with efficient peers and ranks five priorities. Hart's natural-resource-based view, Matos and Hall on life cycle assessment and Klassen and Vachon on supply chain collaboration support the assessment.

Where the QSO 328 Module 3 rubric puts the points

Instructors marking QSO 328 Project One look for a complete life cycle view with impacts estimated at each stage, an economic analysis of costs and risks tied to environmental performance, a clear account of stakeholder pressures, a fair comparison with industry practice, a distinction between what the operation controls and what it can influence and well-reasoned priorities. Projects that score highest quantify the stages, show which priorities also save money and connect stakeholder demands to specific operational changes. Credit falls when the assessment covers only the factory gate, omits costs, lists stakeholders without their demands or ranks priorities without evidence. Organization, tables and APA citations count too.

QSO 328 Module 3 help: the mistakes that cost points

Draw the product's life cycle as a chain of stages, from raw materials to end of life, and estimate the main impacts at each stage using your baseline data, supplier information and published averages. Mark which stages the operation controls directly, such as its own processes, and which it can only influence, such as suppliers and customers. Add the economics: what each impact costs now and what risks it carries, such as rising energy prices or landfill fees. List the stakeholders pressing for change and what each wants. Compare key measures with industry benchmarks if you can find them. A common mistake is ending the assessment at the factory gate; another is ranking priorities by visibility rather than by size and cost. End with three to five priorities.

Get QSO 328 Module 3 written to your instructions

Upload the QSO 328 Project One guidelines and describe the operation you are assessing. A writer follows its product through its life cycle, estimates where impacts arise, adds the economic picture and stakeholder pressures, compares the operation with industry practice and ranks the priorities for improvement. Your first QSO 328 project is drafted at no charge, usually within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 328 papers and related BS Operations Management samples

QSO 328 Module 3 questions, answered

Where can I find a free QSO 328 Module 3 Project One sample?

This page holds the full QSO 328 Project One: a life cycle sustainability assessment of an invented ceramic tile maker with its stakeholder pressures and priorities.

What is a life cycle perspective in operations?

Looking at a product's impacts across every stage of its life, from raw materials to disposal, rather than only inside the factory.

What is an environmental product declaration?

A standardized, independently verified report of a product's life cycle environmental impacts, often requested by architects and large buyers.

How do stakeholders influence sustainable operations?

Customers, regulators, investors and communities set requirements, ask for data and create costs or opportunities that push operations to change.

How do you prioritize sustainability improvements?

By the size of each impact, how much the operation controls it, what it costs now and what improving it would save or earn, favoring changes that are large, controllable and profitable.