| Course | QSO 328 Sustainable Operations |
|---|---|
| Module | Module 1 |
| Paper type | undergraduate discussion post defining sustainable operations and applying it to an energy-intensive manufacturing plant |
| Length | About 370 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 328 Module 1
Module One Discussion
Gas, Clay and a Customer's Questionnaire
I work in production planning at Cumberland Clay Tile, a plant in Lebanon, Tennessee, that turns clay, feldspar and sand into porcelain and ceramic floor and wall tile. We press tile from a spray-dried powder, glaze it and fire it at about 2,200 degrees Fahrenheit in two roller kilns and an older tunnel kiln that run 24 hours a day. We make about 19 million square feet a year for home improvement chains, distributors and commercial projects.
Our footprint is dominated by heat. The kilns and the spray dryer burn about 1.15 million MMBtu of natural gas a year, which produces roughly 61,000 metric tons of carbon dioxide, about three-quarters of the emissions from our own operations. Electricity for presses, grinders and conveyors adds the rest. Water is used heavily in glaze preparation and cleaning. And about 6 percent of fired tile cracks, warps or fails visual inspection; because fired tile cannot simply be repressed, it goes to a landfill, about 11,500 tons a year. Last month our largest home improvement customer sent a questionnaire asking for an environmental product declaration for each tile line.
Kleindorfer et al. (2005) described sustainable operations management as integrating environmental and health concerns with the field's traditional focus on cost, quality and delivery, through green product design, lean and green operations and closed-loop supply chains. For us that means three measurable goals: less gas and electricity per square foot of tile, less fired scrap going to landfill and more water reused, all at the same or lower cost. Hart (1995) argued that firms can build competitive advantage through pollution prevention, product stewardship and sustainable development; for a commodity product like ours, pollution prevention, using less energy and wasting less tile, is where an advantage could come from. Corbett and Klassen (2006) argue that the link between lean and green comes from extending the horizon of analysis to include costs and effects that operations managers usually ignore. A cracked tile is a quality problem and an energy problem at once, because all the gas used to fire it is wasted.
Where does your organization's largest environmental footprint sit, and does anyone there measure it in physical units?
References
Corbett, C. J., & Klassen, R. D. (2006). Extending the horizons: Environmental excellence as key to improving operations. Manufacturing & Service Operations Management, 8(1), 5-22. https://doi.org/10.1287/msom.1060.0095
Hart, S. L. (1995). A natural-resource-based view of the firm. Academy of Management Review, 20(4), 986-1014. https://doi.org/10.5465/amr.1995.9512280033
Kleindorfer, P. R., Singhal, K., & Van Wassenhove, L. N. (2005). Sustainable operations management. Production and Operations Management, 14(4), 482-492. https://doi.org/10.1111/j.1937-5956.2005.tb00235.x
What the QSO 328 Module 1 instructions ask for
QSO 328 starts with introductions and a first discussion of what sustainable operations means and why it matters to operations managers, usually applied to an organization the student knows. Expect to define the concept, often in terms of the triple bottom line, and to identify where the organization's operations have the largest environmental and social effects, such as energy, materials, waste, water or transport. Strong posts move beyond general statements about being green to specific processes and measures, recognize that environmental and economic goals can align or conflict and use research rather than marketing language. Replies should ask a classmate how the impact they named could be measured.
How this QSO 328 Module 1 discussion example is built
The post introduces Cumberland Clay Tile, a fictional plant in Lebanon, Tennessee, that presses, glazes and fires about 19 million square feet of tile a year. Its kilns and spray dryer burn about 1.15 million MMBtu of natural gas annually, about 6 percent of fired tile breaks or fails inspection and goes to a landfill and a large home improvement customer has sent a questionnaire asking for environmental product declarations. The post defines sustainable operations for this plant as lower energy, emissions, water and waste per square foot at equal or better cost. Kleindorfer, Singhal and Van Wassenhove's survey, Hart's natural-resource-based view and Corbett and Klassen's case for extending the horizon of analysis support the definition, and the post asks peers where their footprint sits.
Where the QSO 328 Module 1 rubric puts the points
In the first QSO 328 thread, credit goes to a clear definition of sustainable operations, an organization described in terms of specific processes and impacts, attention to where environmental and economic goals align or conflict, accurate use of research and replies that help classmates measure what they describe. The strongest posts quantify the main impacts, even roughly, and connect them to operating decisions. Points drop when posts rely on slogans, describe a company's marketing rather than its operations, ignore costs or offer replies that only agree. Citations in APA form and readable prose earn the remaining credit in this opening module.
QSO 328 Module 1 help: the mistakes that cost points
Choose an operation you know and list what it consumes and produces: energy, water, materials, packaging, waste and transport. Estimate which is largest, in physical units if you can, and which process causes it. Then define what more sustainable operation would look like there in measurable terms, such as energy per unit made or waste per unit sold. Research suggests the strongest gains come from preventing waste and inefficiency at the source rather than treating them afterward, which often lowers cost too. A common mistake is focusing on visible but small issues, such as office recycling, while ignoring the process that dominates the footprint. Another is assuming that every green step pays. Ask classmates where their organization's biggest footprint sits.
Get QSO 328 Module 1 written to your instructions
Paste the QSO 328 Module 1 prompt and name an operation you know. A writer explains what sustainable operations would mean there in measurable terms, identifies where its largest environmental footprint sits, connects the case to research on sustainable operations and asks QSO 328 classmates about the footprints in their own workplaces. Your first QSO 328 post is free, delivered within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 328 papers and related BS Operations Management samples
- QSO 310 Module 2 Service Strategy Assignment: Competing With a Free State Website
- ACC 330 Module 1 Discussion: Who Should Pay, and How We Know
- ACC 311 Module 8 Discussion: Overhead, Cost-Plus Contracts and the IMA Standards
- QSO 320 Module 1 Discussion: What a Prescriptive Model Can Do for a Tree Farm
QSO 328 Module 1 questions, answered
Where can I find a free QSO 328 Module 1 Discussion sample?
The full QSO 328 Module 1 post is on this page: what sustainable operations means at an invented ceramic tile plant with gas-fired kilns.
What is sustainable operations management?
Managing the design and running of operations to deliver products and services profitably while reducing environmental and social harm, often framed as profit, people and planet.
What is the triple bottom line?
A way of judging an organization by its economic, social and environmental performance together rather than by profit alone.
Is lean also green?
Often, because removing waste in materials, energy and time also reduces environmental impact, though some lean practices, such as frequent small shipments, can raise transport emissions.
Where do manufacturers' biggest environmental impacts usually come from?
Typically from energy use in their own processes, the materials they buy and the transport of goods, with the balance depending on the industry.