QSO 328 Module 2 Environmental Footprint Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 328 Module 2 Environmental Footprint Assignment sample builds an operation's baseline for energy, emissions, water and waste and identifies the processes behind each. SNHU QSO 328 (QSO-328) assigns this measurement step early in its BS Operations Management sustainable operations course. The operation is Cumberland Clay Tile, an invented Tennessee maker of porcelain and ceramic tile. The paper converts 2025 natural gas and electricity use into about 79,400 metric tons of carbon dioxide from the plant's own operations, estimates emissions from suppliers and shipping, measures water use and recycling and counts landfilled fired scrap and glaze sludge, normalizing each per thousand square feet.

CourseQSO 328 Sustainable Operations
ModuleModule 2
Paper typeundergraduate assignment building an operation's environmental footprint baseline for energy, emissions, water and waste and identifying the processes behind each
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 328 Module 2

1

Gas, Power, Water and Broken Tile: An Environmental Baseline for Cumberland Clay Tile

[Student Name]

Southern New Hampshire University

QSO 328: Sustainable Operations

Environmental Footprint Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingEvery quantity and emission figure for Cumberland Clay Tile in this QSO 328 assignment is invented.
2

Gas, Power, Water and Broken Tile: An Environmental Baseline for Cumberland Clay Tile

Introduction

Cumberland Clay Tile has never measured its environmental footprint as a whole. Energy appears in the budget as a cost, waste as a hauling bill and water as a utility charge. This assignment builds a baseline for 2025 in physical units for four categories, energy and emissions, water and waste, normalizes each by production and traces each to the processes that cause it. The baseline will be used in Project One to assess the plant's sustainability and in Project Two to set targets. It covers the Lebanon plant and its outbound shipping; the company's small sales office is excluded.

What this page is doingStates the purpose and scope.
3

Production

In 2025 the plant fired about 20.2 million square feet of tile and shipped about 19.0 million; the difference is fired scrap. All intensities below are per thousand square feet shipped.

What this page is doingSets the denominator.
4

Energy

Natural gas use was 1.15 million MMBtu, of which about 78 percent went to the three kilns and 18 percent to the spray dryer that turns wet clay slurry into pressing powder, with the rest for space heating. Gas cost about $4.6 million. Electricity use was 46,000 megawatt-hours, about $3.9 million, used mainly by ball mills that grind raw materials and glazes, presses, conveyors, compressed air and lighting. A sub-meter study in October found compressed air alone used about 11 percent of electricity, with an estimated 30 percent of that lost to leaks.

What this page is doingMeasures gas and electricity use.
5

Emissions

Greenhouse gas baseline, 2025 (invented data; metric tons of carbon dioxide equivalent)

SourceQuantityFactorEmissions
Natural gas, kilns, dryer and heating1.15 million MMBtuabout 53 kg per MMBtu61,000
Purchased electricity46,000 MWhabout 0.40 t per MWh, regional grid18,400
Own operations total79,400
Purchased clay, feldspar, glaze materialsEstimatedSupplier and industry data22,000
Outbound truckingEstimatedTon-miles times truck factor14,000
Packaging materialsEstimatedIndustry averages5,000

Emissions from the plant's own fuel and purchased electricity total about 79,400 metric tons, or about 4.2 tons per thousand square feet shipped. Gas accounts for 77 percent of that. Emissions from suppliers, outbound shipping and packaging are estimated at about 41,000 tons, but these figures are rough, built from supplier tonnages, distances and published averages rather than suppliers' own data. Matos and Hall (2007) studied how firms used life cycle assessment to bring sustainability into supply chain decisions and found that its usefulness depended on data quality and on involving suppliers, which is the next step for these estimates.

What this page is doingConverts energy to carbon dioxide.
6

Water

The plant withdrew about 96 million gallons from the city system in 2025. Water is used to make clay slurry for the spray dryer, prepare glazes, clean glazing lines and cool equipment. About 38 percent is recycled through a settling pond that returns clarified water to slurry preparation. Glaze line cleaning is the largest single use of fresh water and the source of glaze sludge, because wash water carrying glaze residue cannot be reused in slurry without affecting color.

What this page is doingMeasures withdrawal and reuse.
7

Waste

Waste streams, 2025 (invented data)

StreamQuantityDestinationAnnual cost
Fired scrap (cracked, warped or rejected tile)11,500 tonsLandfill$560,000
Unfired scrap (green and dried tile)7,800 tonsReturned to slurryInternal
Glaze sludge from wash water1,900 tonsLandfill$210,000
Cardboard and shrink wrap640 tonsPartly recycled$40,000
Broken wood pallets310 tonsMulch contractor$15,000

Unfired scrap is already recycled: green tile that breaks before firing is returned to the slurry tank. Fired scrap is the largest waste stream and the most wasteful, since it has already absorbed all the energy of drying and firing. At a fired scrap rate of about 6 percent, roughly 6 percent of the plant's kiln gas, about 54,000 MMBtu, is spent firing tile that ends in a landfill.

What this page is doingCounts what leaves the plant.
8

Trends Since 2022

Records going back to 2022 allow a rough trend. Total gas use rose about 9 percent over three years as output grew, but gas per thousand square feet shipped fell slightly, from about 62 to 60.5 MMBtu, mainly because a second roller kiln took volume from the older tunnel kiln. Electricity per thousand square feet rose about 4 percent after a new polishing line added grinding load. The fired scrap rate has hovered between 5.8 and 6.6 percent with no clear direction, which suggests that no one has been managing it as an environmental issue. Fresh water per thousand square feet was flat. The trend shows that the plant's footprint moves mainly with equipment choices, which is useful for planning: the largest gains will come from changing kilns and processes rather than from small behavioral programs.

What this page is doingShows how the footprint has changed.
9

Who Owns Each Number

For the baseline to be maintained, each figure needs an owner. Gas and electricity will be reported monthly by the maintenance manager from utility bills and sub-meters, water by the facilities supervisor from meter readings and waste by the shipping supervisor from hauling tickets. Production data come from the plant's scheduling system. The environmental coordinator, a new half-time role, will compile the figures each quarter and calculate intensities. Assigning owners now avoids the common problem of a baseline that is built once for a report and never updated.

What this page is doingAssigns responsibility for the data.
10

Intensity Summary

Per thousand square feet shipped, the plant used about 60.5 MMBtu of gas, 2.4 megawatt-hours of electricity and 5,050 gallons of fresh water, emitted 4.2 tons of carbon dioxide from its own operations and landfilled about 0.7 tons of waste. These figures give Project One and Project Two a basis for comparison.

What this page is doingNormalizes the baseline.
11

What the Baseline Points To

Three impacts stand out. Kiln gas is by far the largest source of emissions and a large cost. Fired scrap is the largest waste stream and wastes energy as well as material. Glaze wash water is the largest fresh water use and the source of the second waste stream. King and Lenox (2002) found that pollution reduction through waste prevention was associated with financial gains, while other means of pollution reduction were not, and Kleindorfer et al. (2005) emphasized integrating environmental goals with operational efficiency. Both point to reducing fired scrap and kiln losses at the source rather than finding better disposal.

What this page is doingIdentifies the impacts worth reducing.
12

Data Gaps

Supply chain emissions are estimates. Water use by process is estimated from equipment flow rates rather than meters. The baseline does not include emissions from refrigerants or from the tile's use and eventual disposal, which are small for a durable floor tile but should be reviewed.

What this page is doingStates what the baseline cannot yet show.
13

References

King, A., & Lenox, M. (2002). Exploring the locus of profitable pollution reduction. Management Science, 48(2), 289-299. https://doi.org/10.1287/mnsc.48.2.289.258

Kleindorfer, P. R., Singhal, K., & Van Wassenhove, L. N. (2005). Sustainable operations management. Production and Operations Management, 14(4), 482-492. https://doi.org/10.1111/j.1937-5956.2005.tb00235.x

Matos, S., & Hall, J. (2007). Integrating sustainable development in the supply chain: The case of life cycle assessment in oil and gas and agricultural biotechnology. Journal of Operations Management, 25(6), 1083-1102. https://doi.org/10.1016/j.jom.2007.01.013

What the QSO 328 Module 2 instructions ask for

The QSO 328 Module 2 assignment usually asks students to measure the environmental footprint of an operation as a baseline for improvement. Expect to gather data on energy use, greenhouse gas emissions, water use and waste, convert energy to emissions with appropriate factors, distinguish emissions from the organization's own fuel use, from purchased electricity and from its supply chain, express the results per unit of output and identify which processes drive each impact. Strong submissions state every assumption and conversion factor, use physical units as well as costs, recognize data gaps honestly and end by naming the impacts most worth reducing. The baseline should be detailed enough that progress can be measured against it.

How this QSO 328 Module 2 environmental footprint assignment example is built

The assignment builds a 2025 baseline for Cumberland Clay Tile, a fictional plant producing about 19 million square feet of tile. Natural gas use of 1.15 million MMBtu, at about 53 kilograms of carbon dioxide per MMBtu, produces about 61,000 metric tons; 46,000 megawatt-hours of electricity at a regional grid factor of about 0.40 tons per megawatt-hour adds about 18,400, for a total near 79,400 tons from the plant's own operations, about 4.2 tons per thousand square feet. Supplier and shipping emissions are estimated at another 41,000 tons. Water withdrawal is 96 million gallons, 38 percent recycled; 11,500 tons of fired scrap and 1,900 tons of glaze sludge are landfilled. Matos and Hall, Kleindorfer and colleagues and King and Lenox frame the baseline.

Where the QSO 328 Module 2 rubric puts the points

The QSO 328 footprint assignment is generally assessed on complete and correctly measured impact categories, accurate conversion of energy to emissions with stated factors, a clear distinction among direct, purchased-energy and supply chain emissions, normalization per unit of output, identification of the processes behind each impact and honest treatment of data gaps. Submissions that earn the highest marks show their arithmetic, explain where each number came from and point to the impacts most worth reducing. Credit drops when units are mixed, conversion factors are missing, supply chain impacts are ignored without comment or the baseline cannot be used to track progress. Tables and APA citations complete the rubric.

QSO 328 Module 2 help: the mistakes that cost points

Collect a year of utility bills, fuel records, water meter readings and waste hauling invoices, and record production for the same year. Convert fuel and electricity to emissions using published factors, and state each factor and its source in a note. Separate emissions from fuel burned on site, from purchased electricity and, if you can estimate them, from purchased materials and transport. Divide each total by output to get an intensity, since a growing plant can cut intensity while total emissions rise. Then trace each impact to the processes that cause it, using sub-meters, equipment ratings or engineering estimates. A common mistake is reporting costs instead of physical quantities; another is ignoring waste streams that are recycled, which still have a footprint.

Get QSO 328 Module 2 written to your instructions

Share the QSO 328 Module 2 instructions and what you know of your operation's energy, water and waste. A writer builds the baseline in physical units, converts energy to emissions with stated factors, separates direct, purchased and supply chain emissions, normalizes everything per unit of output and traces each impact to the process behind it. Your first QSO 328 footprint assignment is free, back within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 328 papers and related BS Operations Management samples

QSO 328 Module 2 questions, answered

Where can I find a free QSO 328 Module 2 Footprint Assignment sample?

The complete QSO 328 Module 2 assignment is on this page: an energy, emissions, water and waste baseline for an invented ceramic tile plant.

How do you calculate emissions from natural gas use?

Multiply the fuel burned, in MMBtu or therms, by an emission factor, about 53 kilograms of carbon dioxide per MMBtu for natural gas, and convert to metric tons.

What are direct, purchased-energy and supply chain emissions?

Direct emissions come from fuel burned on site; purchased-energy emissions come from generating the electricity the site buys; supply chain emissions come from suppliers, transport and product use and disposal.

Why normalize a footprint per unit of output?

Because totals rise and fall with production; intensity per unit shows whether the operation is actually becoming more efficient.

What is a life cycle assessment?

A method for measuring the environmental impacts of a product across its life, from raw material extraction through production, transport, use and disposal.