Module Six Discussion
Two Hundred Thousand Over
Bayhead Marine's proposal ranked first, but at $11.4 million it is $200,000 above our vessel budget. The easy position is to tell the yard to cut its price. That is also the position most likely to fail: a yard that bid a realistic price will either refuse or cut corners we will pay for later.
So we listed what each side actually needs. We need the boat by May 2029, because the old ferry's certificate will not be renewed, and a price the board can approve within the budget. Bayhead's proposal and its clarification questions showed what it needs: steady cash during construction, since a small yard carrying an $11 million hull on its own credit pays heavy interest, and protection from battery prices, which the adjustment clause already gives. Our alternative is Tern Harbor's proposal at $12.1 million, which we would accept rather than rebid, but which costs $700,000 more. Bayhead knows it was not the only credible bidder.
Galinsky and Mussweiler (2001) found that first offers anchor final agreements, and that the anchor lost much of its pull on negotiators who kept in mind what the opposing party could get elsewhere, or their own best outcome. We opened, rather than waiting, with a written list of changes worth $280,000, not a demand for a lower price. Thompson and Hastie (1990) showed that negotiators often believe every gain for the other side is a loss for them, and so miss trades that would leave both better off. Payment timing was such a trade. Neale and Bazerman (1985) found that negotiators who framed outcomes as gains conceded more readily and settled more often than those who framed them as losses, so we described each change to the yard by what it saved rather than what it took away.
We moved more of the price into earlier milestones, keel laying and hull completion, which saves the yard financing cost and costs us only earlier use of grant money already in hand. We cut spare parts to our own list and took standard seating. In return the yard accepted liquidated damages of $2,500 a day for late delivery. The final price was $11.16 million, and both sides could show their boards a better contract than the one they started with.
Which term in your contract costs you little but matters a lot to the seller?
References
Galinsky, A. D., & Mussweiler, T. (2001). First offers as anchors: The role of perspective-taking and negotiator focus. Journal of Personality and Social Psychology, 81(4), 657-669. https://doi.org/10.1037/0022-3514.81.4.657
Neale, M. A., & Bazerman, M. H. (1985). The effects of framing and negotiator overconfidence on bargaining behaviors and outcomes. Academy of Management Journal, 28(1), 34-49. https://doi.org/10.5465/256060
Thompson, L., & Hastie, R. (1990). Social perception in negotiation. Organizational Behavior and Human Decision Processes, 47(1), 98-123. https://doi.org/10.1016/0749-5978(90)90048-E
What the QSO 349 Module 6 instructions ask for
The QSO 349 Module 6 discussion commonly turns to negotiation in procurement. Students are asked to describe how they would prepare for and conduct a contract negotiation: identifying each party's interests and positions, the best alternative to a negotiated agreement, the issues on the table, the range within which agreement is possible and the tactics or concessions they would use. Strong posts look past price to terms such as payment, delivery, warranties and risk allocation, find trades that cost one side little and matter to the other, plan the opening offer and cite negotiation research. Replies should ask a classmate what their alternative would be if talks failed or which issue the seller values most.
How this QSO 349 Module 6 discussion example is built
The post plans the Casco Narrows Ferry District's negotiation with Bayhead Marine, a fictional shipyard whose $11.4 million ferry proposal ranked first but exceeds the $11.2 million budget. It separates positions from interests: the district needs on-time delivery and a price within budget, while the yard needs steady cash flow during construction and protection from battery prices. The district's alternative is Tern Harbor's higher-priced proposal. Galinsky and Mussweiler on first offers as anchors and Thompson and Hastie on the fixed-pie assumption shape the plan. Trades of earlier milestone payments, a smaller spare parts package and standard seating against firm liquidated damages brought the price to $11.16 million.
Where the QSO 349 Module 6 rubric puts the points
The QSO 349 Module 6 thread rewards careful preparation, a clear line between what each party says it wants and what it needs, a believable fallback for the buyer, several issues on the table rather than one, trades that make sense and a planned opening, along with cited research and replies that make a classmate's plan stronger. The best posts show a trade that left both sides better off instead of meeting in the middle. Marks fall when negotiation is reduced to bargaining over price, the fallback is never named, concessions are handed over for nothing or replies only say good post. Grammar and APA citations are part of the score too.
QSO 349 Module 6 help: the mistakes that cost points
Begin with what each side needs, not what it says: a seller insisting on a price may really need cash flow or protection from a cost it cannot control. Write down your best alternative if talks fail, since it sets the point at which you should walk away. List every issue that could be traded, price, payment timing, delivery, warranties, penalties, scope, and rank them by their value to each side; trades work when an issue costs one side little and matters a lot to the other. Plan your opening offer, which tends to anchor the result. A common mistake is negotiating one issue at a time; another is assuming the other side's gain is your loss. Close by asking classmates what their walk-away point would be.
Get QSO 349 Module 6 written to your instructions
Paste the QSO 349 Module 6 prompt and describe the negotiation you face. A writer sets out each side's positions and interests, the buyer's best alternative, the issues that can be traded, the opening offer and the concessions to hold back, citing negotiation research, and asks QSO 349 classmates a question. Your first QSO 349 post is free, written within about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 349 papers and related BS Operations Management samples
- QSO 349 Module 1 Discussion: Why Buying the Ferry Is Most of the Project
- QSO 349 Module 2 Make-or-Buy Assignment: Designing the Ferry In-House or With a Naval Architect
- QSO 349 Module 3 Project One: The Procurement Management Plan
- QSO 349 Module 4 Discussion: Fixed Price or Cost-Plus for a First-of-Its-Kind Boat?
- QSO 349 Module 5 Source Selection Assignment: Scoring Three Shipyard Proposals
- QSO 349 Module 7 Project Two: Changes, a Battery Delay and Closeout
- QSO 349 Module 8 Discussion: A Losing Shipyard's Protest
- INT 220 Module 3 Milestone One: Three Economies Through a Grower's Eyes
- QSO 328 Module 5 Supplier Sustainability Assignment: Scoring Clay, Glaze and Packaging Suppliers
- MKT 355 Module 6 Sponsor Value Assignment: Showing Sponsors What Social Media Delivers
- INT 422 Module 6 Value Chain Configuration Assignment: Which Plant Makes What
QSO 349 Module 6 questions, answered
Where can I find a free QSO 349 Module 6 Discussion sample?
This page holds the full QSO 349 Module 6 post: an invented ferry district's negotiation with a shipyard whose winning bid was over budget.
What is a BATNA?
The best alternative to a negotiated agreement: what a party will do if talks fail, which sets the point at which accepting an offer stops making sense.
How do positions differ from interests?
A position is the demand a party states, such as a price; an interest is the reason for that demand, for example cash flow or protection from risk.
Why does the first offer matter?
Research shows that first offers act as anchors, pulling the final agreement toward them, especially when the other side focuses on the offer rather than its own alternatives.
What can be negotiated in a procurement contract besides price?
Payment terms, delivery dates, scope and options, warranties, liquidated damages, risk allocation, inspection and acceptance terms and change order pricing.