| Course | INT 422 International Strategic Management |
|---|---|
| Module | Module 6 |
| Paper type | undergraduate assignment on configuring a multinational's global value chain |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS International Business |
| Updated | October 2026 |
Free sample paper for INT 422 Module 6
Design in Indiana, Coatings in Cork, Screws in Heredia: Configuring Larkspur Orthopedics' Value Chain
[Student Name]
Southern New Hampshire University
INT 422: International Strategic Management
Value Chain Configuration Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Design in Indiana, Coatings in Cork, Screws in Heredia: Configuring Larkspur Orthopedics' Value Chain
Introduction
Larkspur Orthopedics designs and makes knee and hip replacements and trauma devices at three plants: Warsaw, Indiana; Cork, Ireland; and Heredia, Costa Rica. It is planning a narrow joint venture in China to make a value knee for tender markets. Each plant grew for historical reasons rather than as part of a deliberate design. This assignment maps Larkspur's value chain, explains which activities create the most value and knowledge, compares locations for each and recommends a configuration that supports the company's strategy of defending premium positions while competing for volume where it must.
The Value Chain
Larkspur's value chain has seven main activities. Design and registry research create new implants and generate the outcome evidence behind its premium positioning. Coating applies the porous titanium layer that helps bone grow into implants. Implant machining shapes knee and hip components from cobalt-chrome and titanium. Trauma manufacturing makes screws and plates. Sterilization and packaging prepare products for hospitals. Distribution moves products to regional warehouses and hospitals. Surgeon education trains surgeons and sales staff in Larkspur's systems.
Where Value Concentrates
Mudambi (2008) described a smile curve along which value added is highest at the two ends of the chain, research and design at one end and marketing, service and customer relationships at the other, and lowest in the middle stages of standardized manufacturing. Knowledge-intensive firms, he argued, tend to keep control of the high-value ends while locating or outsourcing middle stages where costs are lower. For Larkspur, design, registry research and surgeon education sit at the high-value ends; machining of mature products and trauma manufacturing sit lower; the coating process is unusual, a manufacturing step that carries distinctive know-how.
Location Factors
Location factors for Larkspur's sites
| Factor | Warsaw, Indiana | Cork, Ireland | Heredia, Costa Rica | China joint venture |
|---|---|---|---|---|
| Labor cost | High | Medium to high | Low to medium | Low |
| Engineering and regulatory skills | Very high | High | Medium, growing | Medium |
| Proximity to main markets | U.S. | Europe | U.S. | China |
| Regulatory track record | Strong | Strong | Good | New |
| Knowledge protection | Strong | Strong | Good | Limited |
| Disruption risk | Low | Low | Moderate | Moderate to high |
Sourcing and Advantage
Kotabe and Murray (2004) argued that global sourcing decisions affect not only cost but whether firms retain the capabilities that sustain advantage, warning that outsourcing activities tied to core competencies can hollow out a company over time. Ghemawat (2007) described arbitrage, exploiting differences between countries such as labor costs, as one of three ways to create value across borders, while cautioning that pursuing it alongside adaptation and aggregation is difficult. Together these suggest Larkspur should use arbitrage for mature, standardized activities while keeping coating, design and education under firm control.
Current Configuration
Today the three plants overlap more than they should. Warsaw machines premium knees and hips, makes trauma plates and houses engineering, the outcome studies and the largest teaching center. Cork machines premium implants for Europe and runs the only coating line, which supplies every plant. Heredia makes trauma screws and handles sterilization and packaging for the Americas. Distribution runs through regional warehouses in Indiana, the Netherlands, Japan and Shanghai. The arrangement leaves trauma production split between two high- and low-cost sites, makes every implant dependent on one coating line in Ireland and gives Heredia less work than its capacity allows.
Recommended Configuration
Recommended configuration
| Activity | Location | Reason |
|---|---|---|
| Design and registry research | Warsaw | Highest value, close to engineering talent and U.S. surgeons |
| Porous titanium coating | Cork as center of excellence, second line in Warsaw | Distinctive know-how developed in Cork; second line for resilience |
| Premium implant machining | Warsaw and Cork | Skills, quality and proximity to main markets |
| Trauma plates and screws | Heredia | Mature products, lower cost, short shipping to U.S. |
| Value knee for China tenders | China joint venture | Local cost position; no premium designs or coating |
| Sterilization and packaging | Heredia and a qualified contract sterilizer in Indiana | Dual sources reduce disruption risk |
| Surgeon education | Warsaw, Germany and Japan centers | Customer-facing, high value, kept in-house |
The Moves
Three changes would follow. Moving trauma plate machining from Warsaw to Heredia, which already makes trauma screws, should cut labor and overhead by roughly $6 million annually once a two-year transfer, which itself costs about $9 million for validation and regulatory filings, is complete. Building a second coating line in Warsaw would cost about $14 million but would protect Larkspur if the Cork line were disrupted, since nearly all implants depend on it. Qualifying a contract sterilizer in Indiana would reduce reliance on a single sterilization source, a risk exposed when regulators tightened rules on ethylene oxide emissions in the United States.
Alternatives Considered
Two bolder configurations were rejected. Moving premium implant machining to Costa Rica would save more money but would place Larkspur's most valuable products in a plant still building its engineering depth, and European regulators would need new documentation for every product moved. Outsourcing machining entirely to contract manufacturers, as some device firms do, would free capital but would weaken control over quality and the know-how that keeps Larkspur's defect rate low, exactly the hollowing out that research on sourcing warns against. Keeping everything where it is, the third alternative, would avoid disruption but leave Larkspur exposed to a single coating line and higher trauma costs than rivals.
Risks
The Heredia transfer could disrupt supply if validation takes longer than planned, so Larkspur would build safety stock first. Expanding coating in Warsaw could weaken Cork's sense of ownership; Cork would lead the new line's setup and retain the center of excellence role. And the China joint venture must be kept walled off from premium designs and coating know-how, as the joint venture agreement requires.
Conclusion
Larkspur's value chain should keep its highest-value and most knowledge-intensive activities, design, registry research, coating and education, under firm control in skilled locations, use Costa Rica for mature products and confine China to the value line. That configuration supports a strategy of premium differentiation with selective cost competition, and it should be revisited every three years, or sooner if the China venture grows faster than expected or a new plant becomes necessary to serve Asia.
References
Ghemawat, P. (2007). Managing differences: The central challenge of global strategy. Harvard Business Review, 85(3), 58-68.
Kotabe, M., & Murray, J. Y. (2004). Global sourcing strategy and sustainable competitive advantage. Industrial Marketing Management, 33(1), 7-14. https://doi.org/10.1016/j.indmarman.2003.08.004
Mudambi, R. (2008). Location, control and innovation in knowledge-intensive industries. Journal of Economic Geography, 8(5), 699-725. https://doi.org/10.1093/jeg/lbn024
What the INT 422 Module 6 instructions ask for
The value chain configuration assignment in INT 422 typically has you decide how a multinational ought to arrange and site its activities across countries, such as research and development, manufacturing, sourcing, logistics, marketing and service. Expect to describe the current configuration, evaluate location factors such as costs, skills, infrastructure, risk and proximity to markets, discuss what to keep in-house versus outsource and recommend changes. A strong paper explains which activities create the most value and knowledge, weighs location choices against both cost and capability, considers risks such as disruption and knowledge leakage and links the configuration to the company's overall strategy. Many versions also ask how the configuration should change if the company's strategy shifts.
How this INT 422 Module 6 value chain configuration assignment example is built
The sample maps Larkspur Orthopedics' value chain: implant design and registry research, the porous titanium coating process, machining of knee and hip components, trauma screws and plates, sterilization and packaging, regional distribution and surgeon education. Using Mudambi's smile curve, which places most value at the research and market ends of the chain, Kotabe and Murray on how sourcing choices shape lasting advantage and Ghemawat's arbitrage strategy, it recommends keeping design and registry research in Warsaw, making Cork the coating center of excellence, shifting trauma plate machining to Heredia, dual-sourcing sterilization and confining the China joint venture to the value knee, with costs and risks for each move.
Where the INT 422 Module 6 rubric puts the points
The rubric for this assignment typically weighs the mapping of the value chain, analysis of location factors, treatment of make-or-buy and knowledge protection, alignment with strategy and the use of sources and APA style. Strong papers identify where value and knowledge are concentrated, compare locations on more than labor cost, address supply risk and knowledge leakage and tie each placement to the strategy. Papers lose points for moving everything to the cheapest country, for ignoring skills and regulatory requirements, for overlooking disruption risk, for leaving out what should stay in-house and for recommendations disconnected from earlier analysis. Explaining why bolder moves were rejected, not only what was chosen, signals balanced judgment.
INT 422 Module 6 help: the mistakes that cost points
List every major activity in the company's value chain and note where it happens today. Then ask, for each, how much value and knowledge it carries: research, design and customer relationships usually carry more than routine assembly. Compare candidate locations on cost, skills, regulatory approvals, proximity to customers and risk, not only wages. Decide what must stay in-house to protect know-how. Consider resilience, such as having two qualified sites for critical steps. Use research on value chain geography and sourcing to support choices. Recommend a configuration in a table, then explain the moves, their costs and how they support the company's strategy. Describe the current configuration first, since the recommendation only makes sense against what exists.
Get INT 422 Module 6 written to your instructions
Upload the INT 422 Module 6 instructions and the operations you are configuring. We map the value chain, show where value and knowledge concentrate, weigh each location's costs and risks and recommend which site should do what. About two days; first assignments are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More INT 422 papers and related BS International Business samples
- INT 422 Module 1 Discussion: Which Global Strategy Fits a Knee Implant?
- INT 422 Module 2 Industry Analysis Assignment: One Industry, Four Regions
- INT 422 Module 3 Milestone One: What Gives Larkspur an Edge Abroad?
- INT 422 Module 4 Discussion: The Domestic Chinese Challengers
- INT 422 Module 5 Milestone Two: Joint Venture, License or Retreat in China
- INT 422 Module 7 Final Project: The International Strategic Plan
- INT 422 Module 8 Discussion: Judging the Strategy Region by Region
- ACC 430 Module 6 Discussion: Data Governance and Fairness in a Credit Model
- OL 322 Module 8 Discussion: Sustaining Change
- MKT 337 Module 2 Secondary Data Analysis Assignment: What the Ticketing Records Already Say
- QSO 310 Module 3 Project One: Blueprinting a Dealer Title Desk
INT 422 Module 6 questions, answered
Where can I find a free INT 422 Module 6 Value Chain Configuration Assignment sample?
The full INT 422 Module 6 assignment is on this page, configuring an implant maker's value chain across Indiana, Ireland, Costa Rica and China.
What is the smile curve?
A depiction of value along a value chain, with higher value at the research and design end and at the marketing and service end, and lower value in the middle stages of manufacturing and assembly.
How do multinationals decide where to locate activities?
By weighing costs, skills, infrastructure, regulations, proximity to customers and suppliers, risk and the need to protect knowledge for each activity.
What is arbitrage strategy in international business?
Ghemawat's term for creating value by exploiting differences between countries, such as lower labor costs or specialized skills, in locating activities.
Why keep some activities in-house?
To protect valuable knowledge, maintain quality and keep control of capabilities that give the company its competitive advantage.