| Course | QSO 310 Management of Service Operations |
|---|---|
| Module | Module 3 |
| Paper type | undergraduate project designing a new or redesigned service with a service blueprint separating front-office and back-office steps, fail points and wait points |
| Length | About 1,100 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 310 Module 3
Taking the Paperwork Off the Counter: A Service Blueprint for Liberty Bell's Dealer Title Desk
[Student Name]
Southern New Hampshire University
QSO 310: Management of Service Operations
Project One: New Service Design and Blueprint
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Taking the Paperwork Off the Counter: A Service Blueprint for Liberty Bell's Dealer Title Desk
Introduction
Liberty Bell Tag & Title's counters are designed for walk-in customers, but they also carry a large load of work no customer is waiting for: 118,000 packets a year of title and registration paperwork from 61 car dealers. Clerks process these packets between walk-ins, and at month-end, when walk-in demand nearly triples, the mix produces hour-long lines. This project designs a new service, a central Dealer Title Desk, that takes dealer work off the counters, along with a document check at each office door for walk-in title transfers. It maps the current process, presents the new service concept, builds a blueprint, marks fail points and wait points and estimates the effect.
The Current Process
Dealers drop packets at the nearest office, usually in the morning. Each packet holds a signed title, a bill of sale, a lien release where needed and the buyer's documents. A counter clerk processes it between customers, taking about 14 minutes on average, entering data into the state system, printing the registration and setting aside the plate for courier pickup. When a walk-in arrives, the clerk stops, serves the customer and returns to the packet. Chase and Tansik (1983) argued that high-contact and low-contact work should be separated, because customers' presence makes contact work unpredictable while low-contact work benefits from scheduling and batching. Liberty Bell's counters violate that principle in a way customers can see: a waiting customer watches a clerk shuffle paper. Errors also rise, because interrupted packets are finished in pieces; about 6 percent of dealer packets are rejected by the state and returned for correction.
The New Service Concept
The Dealer Title Desk would be a back-office processing center in leased space at the company's King of Prussia office, staffed by eight dedicated processors. Dealers would submit packets through a portal, which checks for missing documents before acceptance, and a courier would collect originals twice a day. The desk would promise completion within 24 hours, with plates and registrations returned by courier. Walk-in counters would no longer handle dealer packets at all. For walk-in customers, a greeter at each office door would check documents for title transfers before the customer joins the line, so that the one customer in eight who arrives without a needed document learns it in a minute rather than after a 30-minute wait.
The Blueprint
Bitner et al. (2008) describe service blueprinting as a way of visualizing a service from the customer's point of view in rows for customer actions, onstage employee actions, backstage actions and support processes, separated by lines of interaction, visibility and internal interaction. The new design has two linked blueprints.
Blueprint of a walk-in title transfer (private customer)
| Layer | Step 1 | Step 2 | Step 3 | Step 4 | Step 5 |
|---|---|---|---|---|---|
| Dealer actions | Uploads packet to portal | Hands originals to courier | Receives status text | Receives plates and registration | Resolves any flagged issue |
| Onstage (portal and courier) | Portal checks required fields | Courier scans packet | Status message sent | Courier delivers | Processor calls dealer |
| Line of visibility | |||||
| Backstage | Processor reviews flagged items | Packet logged on arrival | Data entered in state system | Registration printed, plate pulled | Corrections prepared |
| Support | Portal software | Courier route schedule | State system access | Plate inventory | Dealer account records |
| Layer | Step 1 | Step 2 | Step 3 | Step 4 | Step 5 |
| Customer actions | Arrives at office | Shows documents to greeter | Waits for number to be called | Signs at counter, pays | Leaves with plate |
| Onstage | Greeter welcomes | Greeter checks list, issues number | Display shows queue | Clerk verifies, enters data | Clerk hands over plate |
| Line of visibility | |||||
| Backstage | Queue system tracks arrival | Missing-item notes logged | Clerk prepares state form | Payment processed | Transaction filed |
| Support | Text-ahead queue system | Document checklist | State system | Card terminal | Records system |
Fail Points and Wait Points
Eight fail points were identified. For the Dealer Title Desk: incomplete uploads, prevented by the portal's required-field check; lost originals, prevented by courier scanning at pickup and arrival; data entry errors, reduced by uninterrupted processing and a second check on high-value packets; delays in the state system, handled by a same-day call to the dealer; and plate inventory shortages, prevented by a reorder point. For walk-ins: missing documents, caught by the greeter; incorrect fees, prevented by a fee table on the clerk's screen; and the customer leaving the line, addressed by text-ahead notices. Four wait points were identified: the dealer's wait for completion, the walk-in queue, the wait for a clerk after the number is called and the wait for a card payment. Sampson and Froehle (2006) argue that because customers supply the inputs to services, managing those inputs is central to design; the portal check and the greeter both manage customer inputs before they can cause failures.
Estimated Effect
At 14 minutes each, 118,000 dealer packets consume about 27,500 clerk hours a year, roughly 17 full-time positions, spread across counters. Moving them to a dedicated desk where uninterrupted processing is expected to take about 9 minutes per packet would need about 17,700 hours, or eight to nine processors. The counters would gain the equivalent of about 17 clerks' time for walk-ins, and at month-end, when dealer drop-offs continue at their usual pace, that time is worth the most. The greeter's document check is expected to cut failed visits from one in eight title-transfer customers to about one in twenty-five.
Effect on Staff Roles
The redesign changes jobs. Counter clerks will lose the quiet stretches when they caught up on dealer packets, and some may find a day of continuous walk-in service more tiring. The eight processors at the new desk will need training in batch processing and in working with dealers by phone and portal rather than in person. To reduce resistance, the processors would be chosen first from clerks who prefer back-office work, and counter schedules would add short breaks during long month-end shifts. Managers should also expect a brief rise in errors while the desk learns its new routine.
Introducing the Service
The desk would start with ten volunteer dealers for two months, then add the rest by region. Counter staff would be told in advance that dealer work is leaving and that their role is shifting entirely to walk-in service.
Conclusion
Separating dealer paperwork from the walk-in counter applies the customer contact model directly: the work customers do not see moves out of their sight, where it can be done faster and more accurately, and the counter is left to the customers who are standing in front of it. Project Two will plan the capacity, waiting line and pricing changes that build on this design.
References
Bitner, M. J., Ostrom, A. L., & Morgan, F. N. (2008). Service blueprinting: A practical technique for service innovation. California Management Review, 50(3), 66-94. https://doi.org/10.2307/41166446
Chase, R. B., & Tansik, D. A. (1983). The customer contact model for organization design. Management Science, 29(9), 1037-1050. https://doi.org/10.1287/mnsc.29.9.1037
Sampson, S. E., & Froehle, C. M. (2006). Foundations and implications of a proposed unified services theory. Production and Operations Management, 15(2), 329-343. https://doi.org/10.1111/j.1937-5956.2006.tb00248.x
What the QSO 310 Module 3 instructions ask for
QSO 310 Project One typically asks students to design a new service or redesign an existing one using the new service development process and a service blueprint. Expect to describe the service concept and the customer need it meets, map the process from the customer's point of view, separate front-office activities the customer sees from back-office activities and support processes, mark the line of visibility and identify fail points and wait points with ways to prevent them. Many versions also ask how the design affects capacity and quality and how it would be introduced. Strong projects compare the current and new process, base step times on data, design out failures rather than only noting them and explain the managerial reasons for each design choice.
How this QSO 310 Module 3 project one example is built
The project designs a new service for Liberty Bell Tag & Title, a fictional chain whose counter clerks process 118,000 dealer packets a year between walk-in customers, about 14 minutes each. The current blueprint shows a clerk switching from a waiting customer to a dealer stack, a fail point the customer sees. The new design moves dealer packets to a central Dealer Title Desk in King of Prussia, with courier pickup, a dealer portal and 24-hour turnaround, and adds a document check at each office door for walk-in title transfers. The blueprint marks customer actions, onstage and backstage steps, support processes, the line of visibility, eight fail points and four wait points. Bitner, Ostrom and Morgan, Chase and Tansik and Sampson and Froehle guide the design.
Where the QSO 310 Module 3 rubric puts the points
In QSO 310, Project One is generally graded on a clear service concept and customer need, an accurate map of the current process, a well-constructed blueprint showing customer actions, onstage and backstage activities, support processes and the line of visibility, identification of fail and wait points with preventive measures and a reasoned estimate of the design's effect on capacity and quality. The strongest projects base the design on data, show what changes from the current process and explain the trade-offs. Credit falls when blueprints leave out the customer, mix front and back office, list fail points without fixes or offer designs with no estimate of impact. Organization and APA citations count as well.
QSO 310 Module 3 help: the mistakes that cost points
Map today's process first, step by step, from the customer's arrival to departure, and time each step if you can. Then decide what the new service will do differently and for whom. Build the blueprint in rows: what the customer does, what employees do in front of the customer, what they do out of sight and what systems or other departments support them. Draw the line of visibility between front and back. Mark every point where the service could fail and every point where the customer waits, and design a prevention for each, such as a checklist or a confirmation message. A common mistake is a blueprint that shows only employees; another is ignoring the customer's own actions, which are often where failures begin. Estimate what the new design saves.
Get QSO 310 Module 3 written to your instructions
Upload the QSO 310 Project One guidelines and describe the service you are designing. A writer maps the current process, designs the new or redesigned service, builds a blueprint with customer actions, onstage and backstage steps, support processes and the line of visibility, marks fail and wait points and estimates the effect. The first QSO 310 project is drafted free, ready in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 310 papers and related BS Operations Management samples
- QSO 310 Module 1 Discussion: What Makes a Tag Office a Service?
- QSO 310 Module 2 Service Strategy Assignment: Competing With a Free State Website
- QSO 310 Module 4 Discussion: Where the Complaints Come From
- QSO 310 Module 5 Service Quality Assignment: Measuring the Gaps at Three Offices
- QSO 310 Module 6 Discussion: Why the Month-End Line Feels Longer
- QSO 310 Module 7 Project Two: The Service Operations Improvement Plan
- QSO 310 Module 8 Discussion: Is a Month-End Surcharge Fair?
- FIN 450 Module 4 Equity Selection Assignment: Index or Active, Fund by Fund
- HRM 310 Module 7 Final Project: A Labor Relations Plan After Certification
- INT 400 Module 3 Milestone One: Is Tamarack Ready to Export?
- OL 320 Module 3 Final Project Milestone Two Presentation: Five-slide pitch for SeatWell Apparel
QSO 310 Module 3 questions, answered
Where can I find a free QSO 310 Module 3 Project One sample?
This page holds the full QSO 310 Project One: a service blueprint that moves an invented tag and title chain's dealer paperwork to a central desk.
What is a service blueprint?
A diagram of a service process in rows for customer actions, front-stage employee actions, backstage actions and support processes, with a line of visibility and marked fail and wait points.
What is the line of visibility in a blueprint?
The line separating what the customer sees from what happens out of sight; work below it can often be scheduled and run more efficiently.
What are fail points in a service?
Steps at which errors or breakdowns tend to happen, such as missing documents or data entry errors; good designs add safeguards to prevent or quickly recover from them.
Why separate front-office and back-office work?
Because customer-facing work must respond to arrivals while back-office work can be batched and scheduled, so mixing them makes both slower and less consistent.