QSO 310 Module 5 Service Quality Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 310 Module 5 Service Quality Assignment sample measures service quality with expectation and perception data and operational measures, and recommends improvements. SNHU QSO 310 (QSO-310) assigns this measurement work in Module 5 of its BS Operations Management service operations course. The business is Liberty Bell Tag & Title, an invented chain of vehicle registration offices. A short survey of 610 customers at three offices compares what customers expected with what they experienced across five dimensions of quality, and operational data on first-visit completion and wait times show where the scores come from. The largest gaps are in responsiveness and reliability, and the paper recommends targeted fixes for each.

CourseQSO 310 Management of Service Operations
ModuleModule 5
Paper typeundergraduate assignment measuring service quality with expectation and perception data and operational measures, and recommending improvements
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 310 Module 5

1

Measuring the Gaps at Three Offices: A Service Quality Assessment for Liberty Bell Tag & Title

[Student Name]

Southern New Hampshire University

QSO 310: Management of Service Operations

Service Quality Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe survey, scores and wait data for Liberty Bell's three offices in this QSO 310 assignment are fictional.
2

Measuring the Gaps at Three Offices: A Service Quality Assessment for Liberty Bell Tag & Title

Introduction

Module 4 traced Liberty Bell Tag & Title's complaints to gaps in expectations, standards, delivery and communication. This assignment measures service quality more systematically at three offices that differ in size and customer mix: Doylestown, a suburban office with mostly private customers; Norristown, the busiest office, which also handles the most dealer packets at its counters; and Allentown, in the Lehigh Valley. It combines a short customer survey with operating data, identifies the largest gaps and their causes and recommends improvements.

What this page is doingStates the purpose and approach.
3

Measurement Approach

Parasuraman et al. (1985) proposed that customers judge service quality by comparing what they expect with what they perceive, along dimensions later grouped as reliability, responsiveness, assurance, empathy and tangibles. The survey used 15 short items, three per dimension, each asked twice: how important it was to the customer that the office would do it, and how well the office did it on this visit, both on a seven-point scale. Customers received the survey by text message after their transaction in two weeks of September, one including the last days of the month. The response rate was 24 percent, giving 610 responses: 208 from Doylestown, 231 from Norristown and 171 from Allentown. Operating data for the same weeks came from the queue system and transaction records.

What this page is doingDescribes the survey and data.
4

Results by Dimension

Average perception minus expectation, by dimension and office (seven-point scale)

DimensionDoylestownNorristownAllentownAll three
Reliability-0.6-1.4-0.8-0.9
Responsiveness-0.9-2.1-1.1-1.4
Assurance-0.3-0.9-0.4-0.5
Empathy+0.2-0.3+0.10.0
Tangibles-0.2-0.4-0.6-0.4

Every dimension except empathy falls short of expectations, and responsiveness, which covers prompt service and willingness to help, has the largest gap. Reliability, which covers getting the transaction right the first time and as promised, is second. Customers rate clerks' courtesy and attention well, which suggests that the problems lie in the system rather than in staff attitudes. Norristown has the largest gaps on every dimension.

What this page is doingReports the gaps.
5

Linking Gaps to Operations

Operating measures for the survey weeks

MeasureDoylestownNorristownAllentown
Median wait, minutes92112
90th-percentile wait, minutes316839
First-visit completion, title transfers89 percent78 percent86 percent
Dealer packets processed at counters per day226130

The operating data explain the survey. Norristown processes almost three times as many dealer packets at its counters as Doylestown, and its clerks switch between dealer work and walk-ins most often, which lengthens waits and increases errors. Its first-visit completion for title transfers is the lowest, which drags down reliability scores: a customer who must come back rates the office poorly even if the second visit goes smoothly. Allentown's lower tangibles score reflects an older building with limited parking.

What this page is doingExplains the scores with operating data.
6

Why the Gaps Matter

Zeithaml et al. (1996) found across several industries that customers' assessments of service quality are related to their intentions to remain loyal, spend more and recommend, or to complain and switch. Among survey respondents who rated responsiveness below expectation by two points or more, 41 percent said they would use the state website or another agent next time, compared with 9 percent of those whose expectations were met. For a business that competes with a free website, those intentions are a direct threat.

What this page is doingConnects quality to business results.
7

Recommendations

First, adopt a responsiveness standard: 90 percent of walk-in customers served within 25 minutes, measured daily from the queue system and used to set month-end staffing. Norristown would also be the first office to stop processing dealer packets at counters once the Dealer Title Desk from Project One opens.

Second, address reliability with a reference guide for the 20 most common difficult cases, such as lien releases, out-of-state titles and estates, and a document checklist sent by text when customers join the queue. The target is first-visit completion of 92 percent for title transfers.

Third, install a live wait display at each office and on the website, showing the current wait and the number of people ahead. Buell and Norton (2011) found in a series of experiments that showing customers the work being done for them raised the value they placed on a service, even when it took longer. Honest information about the wait also closes the communication gap created by the old website promise.

What this page is doingMatches fixes to the largest gaps.
8

Survey Items That Stood Out

Within the dimensions, a few items drove the gaps. On responsiveness, "I was served within a reasonable time" had the largest gap of any item, minus 2.6 at Norristown and minus 1.2 at Doylestown. "Staff told me how long my wait would be" was the second largest, which shows that customers want information as much as speed. On reliability, "My transaction was completed on this visit" had a gap of minus 1.9 at Norristown, matching its low first-visit completion rate. On assurance, "Staff knew the answer to my question" was the weakest item, consistent with the inconsistent answers reported in complaints. On empathy, "Staff were courteous" exceeded expectations at all three offices, and on tangibles, "Parking was easy to find" pulled down Allentown's score. These items give managers specific targets: the wait itself, information about the wait, completing transactions in one visit and consistent answers.

What this page is doingReports the individual items behind the dimensions.
9

Segment Differences

Customers doing a simple renewal reported smaller gaps than those transferring a title, mainly because renewals are short and rarely fail. Customers over 60 reported larger gaps on tangibles, especially seating, and smaller gaps on empathy, while customers under 30 placed more weight on knowing the wait time. First-time customers reported larger reliability gaps than repeat customers, likely because they did not know what documents to bring. This suggests the document checklist should be aimed first at first-time customers, for example by sending it automatically when a new customer joins the text queue.

What this page is doingCompares types of customers.
10

Limitations

The survey reached only customers who completed a transaction and responded by text, so customers who left the line are missing, and the two survey weeks may not represent the whole year. Asking expectations and perceptions after the visit can also blur the two.

What this page is doingNotes what the measurement cannot show.
11

Conclusion

Service quality at Liberty Bell is weakest where its system, not its staff, fails customers: waits and first-visit completion. The gaps are largest at the office that mixes the most dealer work with walk-in service, which is why the dealer desk from Project One and the staffing work coming in Project Two matter so much.

What this page is doingSummarizes the assessment.
12

References

Buell, R. W., & Norton, M. I. (2011). The labor illusion: How operational transparency increases perceived value. Management Science, 57(9), 1564-1579. https://doi.org/10.1287/mnsc.1110.1376

Parasuraman, A., Zeithaml, V. A., & Berry, L. L. (1985). A conceptual model of service quality and its implications for future research. Journal of Marketing, 49(4), 41-50. https://doi.org/10.1177/002224298504900403

Zeithaml, V. A., Berry, L. L., & Parasuraman, A. (1996). The behavioral consequences of service quality. Journal of Marketing, 60(2), 31-46. https://doi.org/10.1177/002224299606000203

What the QSO 310 Module 5 instructions ask for

The QSO 310 Module 5 assignment typically asks students to assess the quality of a service using a structured approach, often the dimensions of service quality and the gaps between customer expectations and perceptions. Expect to define the dimensions you will measure, describe how data were or would be collected, report the results, compare locations or segments if possible, explain the causes of the largest gaps and recommend improvements. Many versions ask students to link customer perceptions to operational measures such as wait times, error rates or first-contact resolution. Strong submissions pair survey results with operating data, explain why one location differs from another and choose a few improvements that address the largest gaps rather than a long list.

How this QSO 310 Module 5 service quality assignment example is built

The assignment assesses three offices of Liberty Bell Tag & Title, a fictional registration chain: Doylestown, Norristown and Allentown. A two-part survey of 610 customers asked what they expected and what they experienced on 15 items across reliability, responsiveness, assurance, empathy and tangibles. Gaps were largest for responsiveness and reliability, smallest for empathy, and worst at Norristown, which handles the most dealer packets at its counters and has the lowest first-visit completion. Operational data on 90th-percentile waits explain the pattern. Parasuraman, Zeithaml and Berry's gaps model, the Zeithaml team's loyalty research and Buell and Norton's labor illusion experiments support three fixes: a wait standard, a lien reference guide and a live wait display.

Where the QSO 310 Module 5 rubric puts the points

This QSO 310 assignment is scored on whether the quality dimensions are defined accurately, whether the measurement approach is sound, how clearly gap scores are reported, whether locations or segments are compared, how well survey results are tied to operational data, how convincingly causes are explained and whether recommendations target the largest gaps. Top submissions show where the numbers come from, explain why one site differs and connect each fix to a measured gap. Credit drops when results are reported without causes, when survey data stand alone without operating measures, when recommendations are generic or when sample limits are ignored. Tables, organization and APA citations complete the grade.

QSO 310 Module 5 help: the mistakes that cost points

Decide on the dimensions you will measure and write two or three short items for each, asking customers both what they expect and what they experienced, or measure only perceptions if expectations are hard to collect. Keep the survey short so customers finish it. Report the gap for each dimension and location, then find operating data that explain the largest gaps, such as wait times, error rates or repeat visits. Explain why one location or group scores differently. A common mistake is treating the survey as the answer; it shows where quality is weak but not why. Another is recommending improvements for every item. Pick the two or three largest gaps and propose a specific fix for each, with a way to measure whether it worked.

Get QSO 310 Module 5 written to your instructions

Send the QSO 310 Module 5 instructions and describe the service you are assessing. A writer designs a short expectations-and-perceptions measure, reports gap scores by dimension and location, links them to operational data, explains the causes and recommends improvements matched to each gap. Your first QSO 310 quality assignment is drafted at no cost, in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 310 papers and related BS Operations Management samples

QSO 310 Module 5 questions, answered

Where can I find a free QSO 310 Module 5 Service Quality Assignment sample?

The full QSO 310 Module 5 assignment is on this page: service quality gaps measured at three offices of an invented vehicle registration chain.

What are the five dimensions of service quality?

Reliability (doing what was promised), responsiveness (prompt help), assurance (competence and trust), empathy (individual attention) and tangibles (facilities, equipment and appearance).

How do you measure a service quality gap?

Ask customers to rate what they expected and what they experienced on the same items; the difference between perception and expectation is the gap for each item and dimension.

Why link survey results to operational data?

Surveys show where customers feel quality is weak; operational measures such as waits and repeat visits show why, which points to the right fix.

What is operational transparency?

Showing customers the work being done for them, such as progress or queue status; experiments found it can raise perceived value even when waits are longer.