FIN 355 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This FIN 355 Module 1 Discussion sample applies the personal risk management process to one household, from identifying exposures to choosing how to handle each. SNHU FIN 355 (FIN-355) opens its BS Finance course on risk management and insurance planning with this question about how families should think about risk. The composite Haskells of Tucson, a 61-year-old self-employed land surveyor and a 58-year-old school district HR manager, list what could damage their finances, from a swimming pool and a rented casita to disability and long-term care. The post ranks those exposures by frequency and severity, matches each to a technique and notes why people often leave the largest risks uninsured.

CourseFIN 355 Risk Management and Insurance Planning
ModuleModule 1
Paper typeundergraduate discussion post on the personal risk management process
LengthAbout 390 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Finance
UpdatedOctober 2026

Free sample paper for FIN 355 Module 1

1

Module One Discussion

What Could Go Wrong for the Haskells

Our composite clients for this course are Paul and Renata Haskell of Tucson. Paul, 61, is a self-employed land surveyor; Renata, 58, manages human resources for a school district. They own a home with a swimming pool, rent a backyard casita to a graduate student, have about $855,000 in retirement and other savings and help oversee the care of Renata's mother, 84, whose dementia now requires a memory care residence across town.

What this page is doingA household's risk inventory.
2

Listing exposures first, before any policy, gives this picture:

The Haskells' main exposures

ExposureFrequencySeverityTechnique
Minor car and home damageHighLowRetain through higher deductibles
Fire or monsoon storm damage to the homeLowHighTransfer: homeowners insurance
Injury to a guest at the pool or to the tenantLowVery highReduce (fence, alarm) and transfer (liability and umbrella coverage)
Professional error in a surveyLowHighTransfer: professional liability coverage
Paul's disabilityModerateHighTransfer: disability insurance
Death of either spouseLowModerateTransfer: life insurance, sized to need
Long-term care for either spouseModerateVery highPlan: insurance, savings or both
Outliving savingsModerateHighSocial Security timing and annuity income
What this page is doingRanking what could go wrong.
3

Many households insure small, frequent losses with low deductibles while leaving rare, severe ones uncovered. Kunreuther and Pauly (2004) explain that people tend to treat low-probability events as if they will not happen, often because figuring out the true risk feels costly, so they skip coverage until after a disaster. The Haskells fit the pattern: a $500 deductible on their cars but no umbrella policy, despite a pool and a tenant. The same habit shows up with natural hazards; Kousky (2019) notes that many homeowners outside mapped flood zones carry no flood coverage, which matters in a city where monsoon storms send water racing down dry washes.

What this page is doingWhere people get it backward.
4

Insurance works only if the insurer can price risk. Rothschild and Stiglitz (1976) showed that when the person buying coverage understands his or her own chance of a claim better than the company selling it, insurers screen and design contracts to separate high and low risks. That is why Paul will face detailed health questions when he applies for disability coverage at 61.

What this page is doingWhy insurers ask so many questions.
5

Which risk in your own household would you choose to keep rather than insure, and how large a loss could you pay without borrowing?

What this page is doingFor classmates.
6

References

Kousky, C. (2019). The role of natural disaster insurance in recovery and risk reduction. Annual Review of Resource Economics, 11, 399-418. https://doi.org/10.1146/annurev-resource-100518-094028

Kunreuther, H., & Pauly, M. (2004). Neglecting disaster: Why don't people insure against large losses? Journal of Risk and Uncertainty, 28(1), 5-21. https://doi.org/10.1023/B:RISK.0000009433.25126.87

Rothschild, M., & Stiglitz, J. (1976). Equilibrium in competitive insurance markets: An essay on the economics of imperfect information. The Quarterly Journal of Economics, 90(4), 629-649. https://doi.org/10.2307/1885326

What the FIN 355 Module 1 instructions ask for

The first FIN 355 discussion usually asks how individuals and families identify and manage risk, often through the steps of the risk management process: identifying exposures, measuring them by frequency and severity, choosing techniques such as avoidance, loss control, retention and transfer, and reviewing the results. Some prompts ask you to apply the process to your own household or a client, and others ask why people buy some kinds of insurance eagerly and neglect others. A strong post works through real exposures for one household, ranks them and explains why insurance fits some risks but not others. Use a source on insurance or decision making, and plan replies that challenge how a classmate ranked a risk.

How this FIN 355 Module 1 discussion example is built

The sample introduces the composite Haskells: Paul, a self-employed land surveyor, and Renata, a school district HR manager, with a home, a swimming pool, a casita rented to a graduate student and Renata's mother in memory care. It lists eight exposures and sorts them into a simple frequency and severity grid. Small, frequent losses such as a cracked windshield fit retention; rare, severe ones such as a lawsuit from a pool injury, Paul's disability or years of long-term care call for transfer or careful planning. The post notes that people often insure small risks and skip large ones, explains why insurers screen applicants so closely and asks classmates which exposure they would retain.

Where the FIN 355 Module 1 rubric puts the points

The rubric for this discussion typically looks for understanding of the risk management process, correct use of frequency and severity, appropriate matching of techniques to exposures, use of a source and thoughtful replies. Strong posts identify specific exposures, explain why each technique fits and recognize that insurance is not the answer to every risk. Posts lose points for listing types of insurance rather than exposures, for treating all risks as equally serious and for replies that only agree. A clear closing question and an APA citation typically complete the expectations. Instructors often reward a post that names one risk the household should simply keep, since that shows the student understands insurance is a cost as well as a protection.

FIN 355 Module 1 help: the mistakes that cost points

The quickest way to weaken this post is to list insurance products instead of risks. Start with what could actually happen to the household, such as an injury on the property, a fire, a disability or a long illness, and estimate roughly how likely and how costly each would be. Then pick a technique: avoid it, reduce it, keep it or transfer it. Insurance usually fits rare events that would be catastrophic, while frequent small losses are cheaper to pay yourself. Mention that people often get this backward, which is one of the most useful insights in the course. In replies, ask a classmate whether they would raise a deductible on a risk they currently insure. A rough dollar figure beside each exposure makes the ranking easier to defend.

Get FIN 355 Module 1 written to your instructions

Send the FIN 355 Module 1 prompt and any client scenario provided. We list and rank the household's exposures, match each to a risk technique and finish with a question peers will want to take up. Delivered in about 48 hours, with the first post free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 355 papers and related BS Finance samples

FIN 355 Module 1 questions, answered

Where can I find a free FIN 355 Module 1 Discussion sample?

This page has the complete FIN 355 Module 1 post, which lists a Tucson couple's exposures, ranks them and matches each to a risk management technique.

What are the steps of the risk management process?

Identify loss exposures, measure them by frequency and severity, choose techniques to handle each, implement the choices and review them over time.

What are the main risk management techniques?

Avoidance, loss prevention and reduction, retention and transfer, most often through insurance.

When should a household retain a risk instead of insuring it?

When losses are frequent but small enough to pay from savings, since insurance premiums include costs and profit on top of expected claims.

Why do people underinsure against large losses?

Many people ignore low-probability events until one happens, which leads them to skip coverage for rare but catastrophic risks.