| Course | FIN 355 Risk Management and Insurance Planning |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment analyzing homeowners and auto coverage |
| Length | About 1,050 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Finance |
| Updated | October 2026 |
Free sample paper for FIN 355 Module 2
Homeowners and Auto Coverage Review for the Haskell Household
[Student Name]
Southern New Hampshire University
FIN 355: Risk Management and Insurance Planning
Module Two Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Homeowners and Auto Coverage Review for the Haskell Household
Introduction
Paul and Renata Haskell, the composite Tucson couple in this course, have not changed their homeowners or auto coverage in years. This paper reviews both policies against their current exposures: a home that has risen sharply in rebuilding cost, a swimming pool, a casita rented to a graduate student, two cars and about $855,000 in savings that a lawsuit could reach. It explains how the key provisions work, calculates what a loss would pay under the current policy and recommends specific changes.
Current Coverage
The Haskells' current property and liability coverage
| Coverage | Current limit or term |
|---|---|
| Dwelling (HO-3, replacement cost) | $400,000 |
| Other structures | $40,000 (10% of dwelling) |
| Personal property | $200,000 |
| Loss of use | $80,000 |
| Personal liability | $300,000 per occurrence |
| Medical payments to others | $5,000 |
| Homeowners deductible | $2,500 |
| Auto liability | $100,000 / $300,000 / $100,000 |
| Auto deductibles | $500 collision and comprehensive |
| Umbrella | None |
Replacement Cost and the 80 Percent Condition
The Haskells' policy pays replacement cost for damage to the house, meaning the cost to repair or rebuild with materials of like kind and quality, without subtracting depreciation. But that promise carries a condition: the dwelling limit must be at least 80 percent of the home's full replacement cost at the time of loss. If it is lower, the insurer pays only the share of the loss that the limit bears to the required amount.
When they bought the policy, $400,000 was a reasonable estimate. Since then, construction labor and materials costs in southern Arizona have risen sharply, and a current estimate from the insurer's own tool puts rebuilding cost at about $560,000. Eighty percent of that is $448,000, so the house is underinsured under the condition.
What a Loss Would Pay
Suppose a kitchen fire causes $60,000 of damage. The policy pays the loss multiplied by the coverage carried divided by the coverage required, minus the deductible:
Payment = $60,000 x ($400,000 / $448,000) minus $2,500 = $60,000 x 0.893 minus $2,500 = $53,571 minus $2,500 = about $51,100.
Had the dwelling limit been at least $448,000, the payment would have been $60,000 minus $2,500, or $57,500. The shortfall of about $6,400 is the penalty for underinsurance, on top of the deductible.
A total loss is worse. The policy would pay at most its $400,000 limit, leaving about $160,000 of rebuilding cost uncovered, plus any higher costs for current building codes, which a standard policy covers only partly. Kunreuther and Pauly (2004) note that people rarely revisit coverage for rare events; this is the result.
The Casita and the Pool
Renting the casita to a graduate student for $1,100 a month is a business use. Standard homeowners forms are written for owner-occupied homes and may limit or exclude coverage for property rented to others and for liability arising from rental activity. If the tenant tripped on a broken step and sued, the insurer could dispute coverage. The Haskells need either a landlord endorsement on their homeowners policy or a separate dwelling fire policy for the casita with landlord liability coverage, and the tenant should carry renters insurance.
The pool increases the chance of a severe injury claim. The Haskells have reduced the risk with a fence and a self-closing gate, and they should add a pool alarm. But a single serious injury could produce a judgment well above their $300,000 personal liability limit.
Personal Property and Loss of Use
Personal property is covered at $200,000, half the dwelling limit, which is the policy's default. A quick inventory suggests the Haskells' furniture, clothing, tools and electronics would cost about $150,000 to replace, so the limit is adequate, but the policy pays actual cash value on contents unless a replacement cost endorsement is added. On a 12-year-old sofa or a five-year-old laptop, depreciation could cut a claim by half, so the endorsement is worth its modest cost. Paul's surveying equipment, including a GPS receiver and a total station worth about $45,000, is business property that a homeowners policy covers only to a small sublimit, often $2,500 at home; it belongs on a business inland marine policy. Loss of use at $80,000 would cover about a year of rental housing in Tucson while the house is rebuilt, which is reasonable, though the rent from the casita would stop at the same time.
Auto Coverage
The auto policy's 100/300/100 limits pay up to $100,000 per injured person, $300,000 per accident and $100,000 for property damage. For a household with $855,000 of savings, a paid-off car and Paul's ongoing business income, a serious accident could easily exceed those limits. Meanwhile, the $500 deductibles cover small losses the Haskells could easily pay themselves.
Disaster Exposure
A standard homeowners policy excludes flood. Tucson's monsoon season brings flash floods that can damage homes near washes. Kousky (2019) notes that many households outside mapped flood zones go without flood coverage and recover more slowly after disasters, often relying on loans. The Haskells' home sits above a wash but outside a mapped flood zone, so a low-cost flood policy is worth pricing.
Recommendations
Recommended changes
| Item | Current | Recommended | Reason |
|---|---|---|---|
| Dwelling coverage | $400,000 | $560,000, with extended replacement cost of 25% | Meet the 80% condition and cover building cost spikes |
| Ordinance or law coverage | Basic | 25% of dwelling | Pay for code upgrades after a loss |
| Casita | Under homeowners form | Landlord policy with liability; tenant renters insurance | Rental use outside a standard form |
| Personal liability | $300,000 | $500,000 (to qualify for umbrella) | Pool and tenant exposure |
| Auto liability | 100/300/100 | 250/500/100 | Protect assets; umbrella requirement |
| Auto deductibles | $500 | $1,000 | Retain small losses; offset premium |
| Umbrella | None | $2 million | Protect savings and future income |
| Flood | None | Price a policy | Monsoon flash flooding near a wash |
Raising the dwelling limit and adding an umbrella will raise premiums, but higher deductibles on the cars and home offset part of the increase. Rothschild and Stiglitz (1976) explain why insurers price these choices differently: buyers who choose higher deductibles signal confidence in their own low risk, and insurers reward it.
Conclusion
The Haskells' biggest property gap is not a missing policy but an outdated limit: at $400,000, their home fails the 80 percent condition, which cuts partial-loss payments and leaves a large hole after a total loss. Updating the dwelling limit, covering the casita properly and adding higher liability limits with an umbrella closes the gaps that matter most.
References
Kousky, C. (2019). The role of natural disaster insurance in recovery and risk reduction. Annual Review of Resource Economics, 11, 399-418. https://doi.org/10.1146/annurev-resource-100518-094028
Kunreuther, H., & Pauly, M. (2004). Neglecting disaster: Why don't people insure against large losses? Journal of Risk and Uncertainty, 28(1), 5-21. https://doi.org/10.1023/B:RISK.0000009433.25126.87
Rothschild, M., & Stiglitz, J. (1976). Equilibrium in competitive insurance markets: An essay on the economics of imperfect information. The Quarterly Journal of Economics, 90(4), 629-649. https://doi.org/10.2307/1885326
What the FIN 355 Module 2 instructions ask for
The FIN 355 Module Two assignment commonly asks you to analyze property and liability insurance for a household, often homeowners and auto policies. Expect to explain policy sections such as dwelling, other structures, personal property, loss of use and personal liability; to apply provisions such as deductibles, replacement cost versus actual cash value and the coinsurance or insurance-to-value condition; and to evaluate auto liability limits and coverages. Directions may provide a loss scenario and ask how much the policy would pay. A strong submission reads the client's actual coverage, works the numbers for at least one loss, identifies gaps and recommends specific changes with reasons rather than general advice to buy more insurance.
How this FIN 355 Module 2 property insurance assignment example is built
The sample examines the composite Haskells' HO-3 policy, which insures their Tucson home for $400,000 when rebuilding would cost about $560,000. Because $400,000 is below 80 percent of replacement cost, a $60,000 kitchen fire would be paid at $400,000 divided by $448,000 of the loss, minus the $2,500 deductible, or about $51,100 rather than $57,500, and a total loss would leave about $160,000 uncovered. The paper finds that renting the casita creates exposures the homeowners policy may not cover, notes the pool's liability risk, compares 100/300/100 auto limits with $855,000 of savings and recommends higher dwelling coverage, a landlord policy, higher auto limits with higher deductibles and a $2 million umbrella.
Where the FIN 355 Module 2 rubric puts the points
Grading for this assignment usually centers on accurate explanation of policy coverages and provisions, correct calculation of a loss settlement, identification of coverage gaps, appropriateness of recommendations and clear writing with sources. High marks go to papers that apply the insurance-to-value condition correctly, distinguish replacement cost from actual cash value, link liability limits to the client's assets and recommend specific limits. Papers lose points for calculation errors, for confusing the dwelling limit with the home's market value, for ignoring rental or business use of the property and for vague recommendations. Tables of current and recommended coverage are helpful and often expected. Some instructors also look for a note on how the recommendations change the premium, since a plan the client cannot afford will not be followed.
FIN 355 Module 2 help: the mistakes that cost points
Watch the difference between market value and rebuilding cost; a home's sale price includes land, which does not burn, while rebuilding costs depend on construction prices. Insurance-to-value calculations use rebuilding cost. When you apply the condition, show the fraction, the loss and the deductible in order. Look for uses of the property the policy may not expect, such as rentals or home businesses, since they often fall outside a standard homeowners form. Compare liability limits with what the client could lose in a lawsuit, not with what neighbors carry. Finally, consider raising small deductibles to pay for higher limits, which usually improves protection without raising the total premium much. Keep each recommendation tied to the gap it closes.
Get FIN 355 Module 2 written to your instructions
Send the FIN 355 Module 2 directions and the policy details in your case. We read the declarations and conditions, calculate what a loss would pay, find the gaps and recommend specific limits and deductibles. About two days; your first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 355 papers and related BS Finance samples
- FIN 355 Module 1 Discussion: Naming the Risks in One Household
- FIN 355 Module 3 Milestone One: Contract Provisions, Liability and Life Insurance
- FIN 355 Module 4 Life Insurance Policy Assignment: Keep, Convert or Surrender a 1995 Whole Life Policy
- FIN 355 Module 5 Milestone Two, Part A: Health, Disability and Long-Term Care
- FIN 355 Module 6 Milestone Two, Part B: Social Security, Medicare and Medicaid
- FIN 355 Module 7 Final Project: The Haskells' Insurance Plan
- FIN 355 Module 8 Discussion: What a Parent's Memory Care Taught the Family
- MKT 432 Module 2 Market Analysis Assignment: Environmental Scan and Market Analysis
- FIN 330 Module 4 Project One: Estimating the Cost of Capital
- QSO 420 Module 2 Budgeting Assignment: Control Accounts, Contingency and Reserve
- QSO 360 Module 1 Discussion: What Six Sigma Means in a Custom Orthotics Lab
FIN 355 Module 2 questions, answered
Where can I find a free FIN 355 Module 2 Property Insurance sample?
The full FIN 355 Module 2 paper is here: a homeowners policy tested against the 80 percent replacement cost condition, with auto limits, a rented casita and recommended changes.
What is the 80 percent rule in homeowners insurance?
If dwelling coverage is at least 80 percent of the home's replacement cost, partial losses are paid at replacement cost up to the limit; if it is lower, payment is reduced in proportion.
What is the difference between replacement cost and actual cash value?
Replacement cost pays to repair or rebuild with new materials of like kind and quality; actual cash value subtracts depreciation, paying less for older items.
Does homeowners insurance cover a rented unit on the property?
Often not fully. Renting part of a property can create exposures outside a standard homeowners form, so many owners need a landlord policy or endorsement.
How high should auto liability limits be?
High enough, together with an umbrella policy, to protect the household's assets and future income from a serious lawsuit, which for many families means far above state minimums.