Free sample paper for QSO 310 Module 7
Shorter Lines at Month-End: A Service Operations Improvement Plan for Liberty Bell Tag & Title
[Student Name]
Southern New Hampshire University
QSO 310: Management of Service Operations
Project Two: Service Operations Improvement Plan
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Shorter Lines at Month-End: A Service Operations Improvement Plan for Liberty Bell Tag & Title
Introduction
Walk-in service at Liberty Bell performs well most of the month and badly at its end, when registration expirations bring a surge of customers to counters that also process dealer paperwork. Earlier work found that the largest service quality gaps are in responsiveness and reliability and that complaints cluster at month-end. Project One designed a Dealer Title Desk to take dealer packets off the counters. This plan builds on that design with four sets of changes: capacity and staffing, waiting line management, revenue management and the location of a fifteenth office. It closes with measures and an implementation schedule.
Demand Analysis
The queue system records every walk-in arrival. At Norristown, the busiest office, a typical mid-month weekday brings about 260 walk-ins over its nine open hours, peaking at 32 an hour around noon. On the last three business days of the month, walk-ins rise to about 520 a day, peaking at 64 an hour across the late-morning and lunch stretch. Saturdays bring about 300 walk-ins in a shorter day. Average service time for a walk-in, across the mix of renewals and title transfers, is about 9.5 minutes. The chain-wide pattern is similar: the month's closing three working days carry 31 percent of monthly walk-ins.
Capacity and Staffing
At 64 arrivals an hour and 9.5 minutes each, Norristown's month-end peak requires about 10.1 clerk-hours of service every hour. The office has nine windows, but on a typical month-end day about two clerks' worth of time goes to dealer packets, leaving seven for walk-ins, a utilization of about 144 percent. A queue in that condition grows all afternoon, which is exactly what the data show: the 90th-percentile wait reaches 68 minutes.
The plan adds capacity and shifts demand in four steps. Moving dealer packets to the Dealer Title Desk returns the two clerks to walk-ins, giving nine. Adding two part-time clerks for those closing days, working a five-hour midday shift, gives eleven at the peak. Opening an hour earlier and closing two hours later on those days spreads arrivals into hours that are now unused. And text-ahead queueing, described below, is expected to move about 15 percent of peak arrivals to quieter hours, lowering the peak to about 54 an hour. With 54 arrivals and eleven clerks, peak utilization falls to about 78 percent, a level at which waits stay short and stable. The added part-time cost across all 14 offices is about $190,000 a year.
Waiting Line Management
Three changes address waiting. Customers will be able to join the line by text or online and receive a message when they are about ten customers away, so they can wait at home, in a car or nearby. Every office will show its live wait on a screen by the entrance and on the website, updated every five minutes. And dealer runners will no longer use the public counters, ending the appearance of line cutting. The drive-thru demand model of Allon et al. (2011) put a high dollar value on each minute customers do not spend in line, which suggests that cutting month-end waits will protect market share against both the state and rival agents.
Revenue Management
Liberty Bell's capacity is perishable: an idle clerk's mid-month hour cannot be saved for month-end. Two pricing changes would use that. First, renewals and title transfers completed in the first two weeks of the month would receive a $5 discount from the standard fee, promoted by text to customers whose registrations expire in the coming month. In the restaurant study by Kimes and Wirtz (2003), lunch-versus-dinner and time-of-day price gaps drew little objection from respondents, and the same gap presented as money off the regular price drew even less. A discount for early visits, rather than a surcharge for late ones, applies that result. Second, dealer packets would be offered in two tiers through the Dealer Title Desk: the standard $18 fee for 24-hour turnaround and a $30 fee for same-day completion, which lets dealers who value speed pay for it and smooths the desk's workload.
Site Selection
Liberty Bell plans one new office in 2027. Kimes and Fitzsimmons (1990) built a model for La Quinta Motor Inns that predicted a site's profitability from competitive, demographic, physical, market awareness and demand generator variables, and validated it on new sites. A simpler scoring model, using factors suited to a registration office, was applied to three candidate towns.
Site scores for a fifteenth office (1 = weak, 5 = strong; weights in parentheses)
| Factor | Phoenixville | Quakertown | Royersford |
|---|---|---|---|
| Registered vehicles within a 15-minute drive (30%) | 5 | 4 | 4 |
| Distance to nearest state center or rival agent (25%) | 4 | 5 | 2 |
| Car dealers within 10 miles (15%) | 4 | 3 | 4 |
| Rent per square foot (15%) | 3 | 4 | 4 |
| Parking and road access (15%) | 4 | 3 | 4 |
| Total, weighted | 4.15 | 3.95 | 3.50 |
Phoenixville scores highest, mainly because of the number of vehicles nearby and its distance from competitors. Quakertown is a close second and a reasonable choice for 2028. Royersford sits too near a rival agent's office.
Measures and Targets
Measures for the improvement plan
| Measure | Level in 2025 | Target for December 2026 |
|---|---|---|
| Share of walk-ins served within 25 minutes, month-end | 52 percent | 85 percent |
| 90th-percentile wait, month-end, Norristown | 68 minutes | 30 minutes |
| First-visit completion, title transfers | 83 percent | 92 percent |
| Share of walk-ins arriving by text-ahead | None | 30 percent |
| Responsiveness gap score | -1.4 | -0.5 |
| Dealer packets returned by the state | 6 percent | 2 percent |
Implementation
The Dealer Title Desk opens in the first quarter of 2026. Text-ahead queueing and posted waits launch at Norristown in the second quarter and at all offices by the third. Part-time month-end staffing and extended hours begin in April. The early-visit discount begins in July after the queue system can track it. Site selection proceeds in parallel, with a lease decision by the end of 2026.
Conclusion
Liberty Bell's month-end problem is a capacity problem made worse by mixing back-office work into the front office and by customers' uncertainty about waits. The plan frees capacity, shifts demand fairly, makes waits visible and grows the network where demand is strongest.
References
Allon, G., Federgruen, A., & Pierson, M. (2011). How much is a reduction of your customers' wait worth? An empirical study of the fast-food drive-thru industry based on structural estimation methods. Manufacturing & Service Operations Management, 13(4), 489-507. https://doi.org/10.1287/msom.1110.0343
Kimes, S. E., & Fitzsimmons, J. A. (1990). Selecting profitable hotel sites at La Quinta Motor Inns. Interfaces, 20(2), 12-20. https://doi.org/10.1287/inte.20.2.12
Kimes, S. E., & Wirtz, J. (2003). Has revenue management become acceptable? Findings from an international study on the perceived fairness of rate fences. Journal of Service Research, 6(2), 125-135. https://doi.org/10.1177/1094670503257038
What the QSO 310 Module 7 instructions ask for
The closing QSO 310 project pulls the course together into one improvement plan for a service operation. Expect to analyze demand patterns and capacity, propose changes to staffing or scheduling, address waiting line management, consider yield or revenue management where capacity is perishable and, in many versions, evaluate a location decision. The plan should include measures of success and an implementation outline. Strong plans quantify demand and capacity rather than describing them, show the arithmetic behind staffing and waiting estimates, consider customers' perceptions of pricing and waiting as well as efficiency and build on the service design from Project One. Each recommendation should state its expected effect and cost.
How this QSO 310 Module 7 project two example is built
The plan improves walk-in service at Liberty Bell Tag & Title, a fictional chain of 14 registration offices. An hourly demand profile shows Norristown receiving up to 64 walk-ins an hour at month-end, a load of about ten clerk-equivalents, while only seven of nine clerks are free from dealer work. Moving dealer packets to the Project One desk, adding two part-time month-end clerks, extending month-end hours and spreading arrivals with text-ahead queueing bring peak utilization below 80 percent. Off-peak discounts and dealer service tiers apply the fence research of Kimes and Wirtz, waits are valued with Allon, Federgruen and Pierson and a scored comparison modeled on Kimes and Fitzsimmons picks Phoenixville for a fifteenth office.
Where the QSO 310 Module 7 rubric puts the points
Instructors scoring QSO 310 Project Two weigh the depth of the demand and capacity analysis, the soundness of staffing and scheduling changes, the treatment of waiting lines and customer perceptions, the logic of any revenue management proposal, the quality of the location analysis where required, the clarity of measures and the link to Project One. Plans that score highest show their arithmetic, estimate effects and costs, consider fairness and customer reactions and set measurable targets. Credit drops when plans rely on adding staff without analysis, ignore peaks, propose pricing changes without considering fairness or offer location choices without criteria. APA style and a readable structure complete the rubric.
QSO 310 Module 7 help: the mistakes that cost points
Start with demand by hour and day for at least one location, since averages hide the peaks that cause long waits. Compare demand with the capacity actually available, counting only staff free to serve customers. Use a simple rule, such as keeping utilization below about 80 to 85 percent at peak, to estimate how many servers you need, and propose ways to add capacity or shift demand. For waiting, address both length and experience. If you propose demand-based pricing, frame it carefully and consider how customers will judge its fairness. For a location decision, list the factors that drive success and score each candidate. A common mistake is a list of good ideas without numbers; another is ignoring what each change costs. Finish with measures and a schedule.
Get QSO 310 Module 7 written to your instructions
Send the final QSO 310 project instructions, your blueprint from Project One and whatever demand or wait data you hold. A writer analyzes demand by hour and day, plans capacity and staffing, designs waiting line changes, proposes fair revenue management, compares locations if needed and sets measures, each tied to service operations research. Your first QSO 310 Project Two is free and usually returns in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 310 papers and related BS Operations Management samples
- QSO 310 Module 1 Discussion: What Makes a Tag Office a Service?
- QSO 310 Module 2 Service Strategy Assignment: Competing With a Free State Website
- QSO 310 Module 3 Project One: Blueprinting a Dealer Title Desk
- QSO 310 Module 4 Discussion: Where the Complaints Come From
- QSO 310 Module 5 Service Quality Assignment: Measuring the Gaps at Three Offices
- QSO 310 Module 6 Discussion: Why the Month-End Line Feels Longer
- QSO 310 Module 8 Discussion: Is a Month-End Surcharge Fair?
- QSO 325 Module 1 Discussion: Continuous Improvement on a Playground Line
- FIN 460 Module 6 Milestone Two: Retirement Accounts and Charitable Planning
- QSO 455 Module 7 Project Two: The Integrated Supply Chain Plan
- OL 125 Module 2 Communication Analysis Assignment: Communication Breakdown at Shift Change
QSO 310 Module 7 questions, answered
Where can I find a free QSO 310 Module 7 Project Two sample?
This page holds the complete QSO 310 Project Two: an improvement plan for an invented registration chain covering month-end capacity, queues, pricing and a new office site.
How do you match service capacity to demand?
Measure demand by hour and day, calculate the server time it requires, compare it with staff actually available and adjust staffing, hours or demand so peak utilization stays below about 80 to 85 percent.
What is revenue management in services?
Using price and capacity controls to match demand to perishable capacity, such as off-peak discounts or priority tiers, while protecting customers' sense of fairness.
What is a rate fence?
A rule that separates customers who pay different prices, such as time of day or speed of service, so that demand-based pricing feels fair rather than arbitrary.
How do service firms choose a new location?
By identifying the factors that drive a site's success, such as local demand, competition, accessibility and cost, and scoring or modeling candidate sites against them.