| Course | OL 320 Entrepreneurship |
|---|---|
| Module | Module 3 |
| Paper type | Final project milestone, narrated pitch presentation |
| Length | 7 slides with speaker notes, about 860 words |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 320 Module 3
SeatWell Apparel: Pants Designed for the Way You Sit
[Student Name]
Southern New Hampshire University
OL 320: Entrepreneurship
Module Three Final Project Milestone Two
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Slide 1: The Problem
Ordinary pants are cut for standing bodies.
Seated all day, they slide down at the back, bunch at the hips and press on skin.
81% of surveyed wheelchair users alter or tailor their pants.
Speaker notes: Hello, I'm the founder of SeatWell Apparel. I'm a physical therapist, and every week clients who use wheelchairs tell me the same thing: their pants don't work. Ordinary pants are designed for people who stand. When you sit for eight or ten hours, the waistband slides down at the back, fabric gathers around the hips, and anything bulky at the back, a pocket or a heavy seam, digs into the skin, which is a real concern for pressure injuries. In a survey of 64 full-time wheelchair users I conducted for this project, 81 percent said they alter or tailor their pants just to make them wearable. Published research shows this is widespread; people with mobility impairments report that unsuitable clothing even keeps them from work and social events (Kabel et al., 2017). About 3.6 million Americans use a wheelchair (Taylor, 2018).
Slide 2: The Solution
Pants cut for a seated body.
Higher back, lower front, no back pockets or heavy rear seams.
Magnetic fly and side zips make dressing simpler.
Speaker notes: SeatWell pants are designed from the seat up. The back rise is higher and the front is lower, so the waistband stays where it belongs when you sit. There are no back pockets and no thick rear seams where the body presses against the seat. Side zippers and magnetic closures make dressing easier, especially for people with limited hand strength, and the legs are cut to lie flat on the footplates. We tested prototypes with six wheelchair users for four weeks. Only one of the six still had the waistband creep down, and four told us dressing now took less assistance. Their feedback also changed the design, which I'll come back to.
Slide 3: The Value
Comfort and skin protection all day.
More independence when dressing.
No more tailoring bills or ill-fitting workarounds.
Speaker notes: The value to our customers is practical. First, comfort and skin protection over a long day of sitting. Second, independence: easier closures mean fewer people need help to get dressed in the morning. Third, time and money: most of the people I surveyed already pay a tailor or buy oversized pants and have them altered. That is why 64 percent said they would pay 65 to 85 dollars for pants that solved their main problem. We are not asking customers to spend money they do not already spend; we are asking them to spend it on something that works the first time. For caregivers, easier dressing also saves time every single day. And because the pants are built to last without alteration, the cost per wear ends up lower than the cheap pair that has to be fixed or replaced.
Slide 4: What Makes SeatWell Different
Large retailers now sell adaptive clothing, mostly for easy closures.
SeatWell is designed specifically for full-time seated wear.
Professional looks, not medical wear, co-designed with users.
Speaker notes: Adaptive clothing is no longer unknown. Several large retailers now offer adaptive lines, which tells us the market is real. But most of those products focus on easier closures. They are standard patterns with magnets or hook-and-loop tape added, which helps with dressing but does nothing about how the pants sit. SeatWell's difference is the cut itself, designed for people who sit all day, combined with a clinician's understanding of seating and skin. The second difference is style. In interviews, people told me the adaptive pieces they had bought made them look like patients, and three said they avoid job interviews because they can't find professional-looking pants. Our fit testers all asked for a darker, more formal fabric, so our first collection will include work trousers, not just casual pants. That combination, a seated cut with a professional look, is the opportunity a large retailer's add-on line leaves open (Hisrich et al., 2020).
Slide 5: Next Step
Preorder test: 150 pairs in two styles.
Sold through disability organizations and clinicians.
Goal: learn what people buy, not just what they say.
Speaker notes: Before investing in inventory, our next step is a preorder test, which is the cheapest way to find out whether stated interest becomes real demand. We will offer 150 pairs in two styles, a work trouser and a casual pant, through partner disability organizations and physical and occupational therapists, who are among the most trusted sources of product advice for our customers. If at least 100 pairs sell within six weeks at 75 dollars, we will move to a first production run. If not, we will learn why before spending more. Survey answers tell us what people say they would do; a preorder tells us what they actually do. Everything we learn from the preorder, which styles sell, which sizes are returned and which customers come through clinicians, will shape the first production order and the sizing guide. Thank you for listening. In the next milestone, I will build out the full opportunity analysis for SeatWell.
References
Hisrich, R. D., Peters, M. P., & Shepherd, D. A. (2020). Entrepreneurship (11th ed.). McGraw Hill.
Kabel, A., Dimka, J., & McBee-Black, K. (2017). Clothing-related barriers experienced by people with mobility disabilities and impairments. Applied Ergonomics, 59, 165-169. https://doi.org/10.1016/j.apergo.2016.08.036
Taylor, D. M. (2018). Americans with disabilities: 2014 (Current Population Reports P70-152). U.S. Census Bureau.
What the OL 320 Module 3 instructions ask for
Milestone Two in OL 320 usually asks for a short narrated presentation that introduces your business idea. Prompts commonly limit the length, often five slides or a few minutes, and ask you to cover the problem, the solution, the value to customers, what makes the idea unique and next steps. Some sections require audio narration; others accept speaker notes. Put short citations on any slide that uses a statistic, with full references at the end. Keep each slide to one idea, and let the narration add the detail. Practice the timing before recording. The OL 320 Milestone Two guidelines list the required content and the recording tool your section uses.
How this OL 320 Module 3 final project milestone two presentation example is built
Slide one names the problem in a sentence, pants that ride down and press seams into skin, with one statistic on pressure injuries. Slide two shows the product's three design changes in simple labels and a sketch. Slide three explains value in the customer's terms: less time adjusting, less skin risk and clothes that look like everyday wear. Slide four compares SeatWell with two adaptive brands and a tailor, naming the gap it fills. Slide five states the next step, a preorder campaign with a target number. Evidence and citations from Milestone One sit in the notes under each slide. The narration runs under five minutes.
Where the OL 320 Module 3 rubric puts the points
OL 320 grades the pitch on the clarity of the problem and solution, the value proposition, uniqueness, next steps and presentation quality, and OL 320 marks each on SNHU's four levels. Clarity carries heavy weight; graders reward a problem and solution stated so simply that a listener could repeat them. Value earns credit when stated in the customer's terms. Uniqueness scores well when it names real alternatives. Presentation quality covers slide design, timing and narration, and a clear, unhurried voice matters as much as the slides. Citations on slides are expected. Staying under the time limit is part of the assignment, not an afterthought. A pitch that names a next step with a number, such as 150 preorders, gives the grader something concrete to judge.
OL 320 Module 3 help: the mistakes that cost points
Short pitches often lose points by crowding five slides with paragraphs that cannot be read during narration. Another common gap is describing product features without saying why customers care. Some students claim to have no competitors, which signals the market was not researched. Others run over the time limit. Watch citations; a statistic on a slide needs its source. Rehearse once with a timer before recording, and keep a copy of the notes in case the audio fails. Finally, end with a concrete next step, because an OL 320 grader wants to hear what the founder will test before spending money on inventory, and a preorder goal with a number makes that step clear.
Get OL 320 Module 3 written to your instructions
Share the OL 320 Milestone Two instructions, rubric, idea and your market research. A short slide presentation with a narration script for your idea comes back within 24 to 48 hours; the first one is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 320 papers and related BS Business Administration samples
- OL 320 Module 1 Opportunity Recognition Discussion: A therapist spots an apparel problem
- OL 320 Module 2 Final Project Milestone One Market Research: Market research for adaptive pants
- OL 320 Module 4 Competitive Analysis Assignment: Competitors and value proposition
- OL 320 Module 5 Final Project Milestone Three: Draft opportunity analysis plan
- OL 320 Module 6 Startup Financing Assignment: Financing the first production run
- OL 320 Module 7 Final Opportunity Analysis Plan: Final opportunity analysis plan
- OL 320 Module 8 Entrepreneurial Risk Discussion: If only forty people preorder
- FIN 485 Module 5 Milestone Two: Taxes and an Estate Plan After Divorce
- MKT 400 Module 2 Brand Audit Assignment: Auditing the Ironjacks Brand
- MKT 229 Module 1 Discussion: Five Messages From One Garden
- QSO 345 Module 8 Discussion: A Furniture Vendor's Hockey Tickets
OL 320 Module 3 questions, answered
What does OL 320 Milestone Two require?
Milestone Two is typically a short narrated presentation, often three to five slides and under five minutes, that presents the business idea, the problem it solves or need it meets, its value to customers and what makes it unique. Students usually record narration over the slides or use a similar tool.
How many words belong on a slide in a short pitch?
Very little. A few short lines or a single image per slide lets listeners focus on what the presenter is saying. The detail, evidence and explanation belong in the narration, which should be scripted and timed so the presentation stays within the limit.
How do I explain what makes my idea unique?
Compare the idea directly with what customers use now, including competitors and workarounds, and name the specific difference that matters to the customer. Uniqueness is only persuasive when it solves a problem the alternatives do not.
Where can I find a free OL 320 Module 3 Milestone Two presentation sample?
The full pitch is on this page: five slides with speaker notes presenting SeatWell Apparel's problem, solution, value, difference and next step in under five minutes. Use it to see a short pitch kept clear.
How do I record a narrated presentation for OL 320?
Most sections accept PowerPoint's recording feature or a screen recorder. Write notes for each slide, rehearse once with a timer and record slide by slide so a mistake means redoing one slide, not the whole talk.