OL 320 Module 2 Final Project Milestone One Market Research Example

Reviewed by Portia Lambrick, MBA

This OL 320 Module 2 milestone is the market research paper that begins the course's opportunity analysis. SNHU OL 320 (OL-320) builds its BS Business Administration final project, an opportunity analysis plan, across milestones, and this one tests whether the adaptive pants idea has a market. The composite founder, a physical therapist, wants to sell pants designed for full-time wheelchair users. The paper states the idea and the research questions. Secondary research sizes the population with national data and summarizes published studies on clothing needs of wheelchair users. Primary research adds a 64-person survey and interviews with a prototype fit test. A target market is defined, and the market is sized from total to reachable. The paper closes with what the research supports, what it does not and what the next milestone must test.

CourseOL 320 Entrepreneurship
ModuleModule 2
Paper typeFinal project milestone, market research paper
LengthAbout 1,090 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 320 Module 2

1

Milestone One: Market Research for Adaptive Pants Designed for Full-Time Wheelchair Users

[Student Name]

Southern New Hampshire University

OL 320: Entrepreneurship

Module Two Final Project Milestone One

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe title names the milestone, the product and the precise customer, which signals that the research will be specific rather than about clothing in general.
2

Milestone One: Market Research for Adaptive Pants Designed for Full-Time Wheelchair Users

The Idea and the Research Questions

SeatWell Apparel is a composite startup founded by a physical therapist to make pants for people who sit in wheelchairs most of the day. The design uses a higher back rise and lower front rise so the waistband stays in place when seated, removes back pockets and heavy rear seams that can press on skin, adds side zippers and magnetic closures for easier dressing, and cuts the legs to lie flat on footplates. Before investing in production, the founder needs answers to four questions: How large is the population who might buy? What clothing problems do they face, and how serious are they? Would they pay a premium for a solution, and how much? Where do they shop?

Secondary Research: The Population

National data confirm a sizable population. In the 2016 Behavioral Risk Factor Surveillance System, about one in four U.S. adults reported some disability, and mobility disability, serious difficulty walking or climbing stairs, was the most common type among middle-aged and older adults (Okoro et al., 2018). A narrower figure matters more for this product. Census survey data show that about 3.6 million Americans aged 15 and older used a wheelchair in 2014 (Taylor, 2018). Not all use one full time, and full-time users, the founder's intended customers, are a subset of that number.

Secondary Research: The Need

Published research supports the need. Kabel et al. (2017) surveyed 113 respondents with mobility impairments, or the caregivers of such people, online; they reported unmet clothing needs, and for some, unsuitable clothing meant staying away from social events, employment and ordinary activities. Focus groups with people with disabilities, caregivers and health providers identified functional, cultural and sensory barriers related to clothing and called for innovation in the design, production, distribution and sale of adaptive apparel (Kabel et al., 2016). The research shows that the problem the founder sees in her clinic is widely experienced, not limited to her clients.

Primary Research: Survey

The founder distributed an online survey through two independent living centers, a spinal cord injury support group and two rehabilitation clinics, receiving 64 responses from adults who use a wheelchair at least six hours a day. Table 1 summarizes the key results.

Table 1

Survey of Full-Time Wheelchair Users on Clothing Needs

QuestionResult (n = 64)
Alter or tailor pants to make them wearable seated52 (81%)
Most common problem: waistband slides down at back46 (72%)
Concern about seams or pockets and skin pressure38 (59%)
Need help dressing because of fasteners27 (42%)
Have bought adaptive clothing before19 (30%)
Would pay $65 to $85 for pants that solved their main problem41 (64%)
Prefer to buy clothing online46 (72%)

Note. Composite survey data for illustration. Respondents could report more than one problem.

What this page is doingSurvey results are presented as counts and percentages of a stated sample, so the reader can judge their weight. Noting that respondents came through disability organizations prepares the limitations discussion.
3

Primary Research: Interviews and Fit Test

Eight follow-up interviews added detail that the survey could not. Several respondents described buying pants two sizes too large and having them taken in, and three said they avoid job interviews or events because they cannot find clothing that looks professional while seated. Two said adaptive clothing they had tried looked like medical wear. The market is asking for clothing that works when seated and still looks like ordinary clothing, not for medical products.

Six participants then wore prototype pants for four weeks. Five of six said the waistband stayed in place, and four said they could dress with less help. All six asked for a darker, more formal fabric option, and two found the side zippers hard to reach from one side, which will change the design.

Target Market

The research points to a specific first customer: adults aged 25 to 64 who use a manual or power wheelchair full time, work or are active in their communities, shop online and want clothing that looks professional. A secondary segment is caregivers and parents who buy for someone they support. Older adults in long-term care are a real need but a harder segment to reach, because purchasing often runs through facilities and families, and they are left for later.

Estimating the Market

The estimate is built in three layers, each with a stated assumption. Total addressable market: if roughly 1.6 million of the 3.6 million wheelchair users are adults who use one full time, and each buys two pairs of pants a year at 75 dollars, the market for such pants is about 240 million dollars a year. Serviceable available market: if 72 percent shop online, as in the survey, about 173 million dollars is reachable through an online brand. Serviceable obtainable market: a new brand might realistically capture 0.3 percent of that by its third year, about 520,000 dollars in annual sales. These figures are estimates, not measurements, and the full-time share in particular should be refined with better data (Hisrich et al., 2020).

What the Research Says About Price and Channel

Two findings shape how the product should be sold. On price, most respondents accepted a range of 65 to 85 dollars, well above the 30 to 45 dollars many pay for ordinary pants, but several interviewees tied that willingness to durability: they already spend money on tailoring, and a pair that lasts a year without alteration is worth more to them than a cheaper pair that does not fit. That suggests the brand should emphasize saved tailoring costs and time rather than luxury. On channel, 72 percent prefer to buy online, largely because stores are hard to navigate in a wheelchair and fitting rooms are often too small. Online sales, however, raise the risk of returns when fit is uncertain, so a detailed seated-size guide, free exchanges and videos showing how the closures work will be essential. The interviews also revealed that occupational and physical therapists are trusted sources of product advice, which points to clinicians as a referral channel alongside online advertising.

Limitations and Next Steps

The research has clear limits. The survey reached people connected to disability organizations and clinics, who may be more engaged and more willing to try new products than wheelchair users generally. A sample of 64 cannot represent every type of disability or body shape. Stated willingness to pay often exceeds actual purchases, so the 64 percent figure is an upper bound. The next step is a preorder test, which measures what people do rather than what they say. Even with these limits, the evidence supports the conclusion that the need is real, that ordinary retail does not meet it and that a well-designed product can command a moderate premium. Milestone Two will present the idea, its value and its uniqueness.

References

Hisrich, R. D., Peters, M. P., & Shepherd, D. A. (2020). Entrepreneurship (11th ed.). McGraw Hill.

Kabel, A., Dimka, J., & McBee-Black, K. (2017). Clothing-related barriers experienced by people with mobility disabilities and impairments. Applied Ergonomics, 59, 165-169. https://doi.org/10.1016/j.apergo.2016.08.036

Kabel, A., McBee-Black, K., & Dimka, J. (2016). Apparel-related participation barriers: Ability, adaptation and engagement. Disability and Rehabilitation, 38(22), 2184-2192. https://doi.org/10.3109/09638288.2015.1123309

Okoro, C. A., Hollis, N. D., Cyrus, A. C., & Griffin-Blake, S. (2018). Prevalence of disabilities and health care access by disability status and type among adults: United States, 2016. Morbidity and Mortality Weekly Report, 67(32), 882-887. https://doi.org/10.15585/mmwr.mm6732a3

Taylor, D. M. (2018). Americans with disabilities: 2014 (Current Population Reports P70-152). U.S. Census Bureau.

What the OL 320 Module 2 instructions ask for

Milestone One in OL 320 usually asks for market research on your business idea. Prompts commonly ask for research questions, secondary research on the industry and customers, primary research such as surveys or interviews, a defined target market and an estimate of market size. Some sections ask for TAM, SAM and SOM. The OL 320 milestone runs a few pages, with tables for the survey results and market size. Primary research can be small but should be described honestly, including how people were reached and how many declined. Quote two or three survey or interview answers to show what customers said in their own words. Keep respondents anonymous. The OL 320 final project guidelines explain how this research feeds the opportunity analysis plan, so choose questions the plan will need answered.

How this OL 320 Module 2 final project milestone one market research example is built

The opening states the idea in one sentence and three research questions: how many people have the need, how badly current pants serve them and whether they would pay a premium. The population section cites national estimates of full-time wheelchair users. The need section summarizes published studies on pressure injuries and clothing. The survey section reports 64 responses from online groups, with the share frustrated by current pants and the price range they would accept. The interview section describes five conversations and a fit test with three prototypes. The target market is defined by age and need. The sizing section moves from total to serviceable to obtainable market.

Where the OL 320 Module 2 rubric puts the points

OL 320 grades Milestone One on the research questions, the secondary research, the primary research, the target market and the market size estimate, with each OL 320 row on SNHU's four levels. Primary research carries heavy weight; graders reward honest description of how data were collected and what the sample can support. Secondary research earns credit when sources are credible and recent. The target market should be specific. Market sizing scores well when assumptions are stated at each step, from all wheelchair users down to those the founder could actually reach online in the first year. Admitting what the research cannot show is a sign of judgment that graders credit in this milestone, especially the gap between survey interest and real purchases.

OL 320 Module 2 help: the mistakes that cost points

Market research papers often lose points by presenting a small online survey as proof that thousands will buy. Another common gap is a target market described as everyone who might need the product. Some students size the market with one large national number and never narrow it. Others leave out how survey respondents were found, which hides bias. Watch the difference between interest and purchase intent, since people who like an idea often do not buy. Finally, end with what to test next, because an OL 320 grader reads Milestone One as the start of a plan and wants the research to point to the next question, such as a preorder test. State a target number for that test.

Get OL 320 Module 2 written to your instructions

Send your OL 320 Milestone One guidelines and rubric with your business idea. A market research paper that tests your idea with sourced data and a clear target market comes back within 24 to 48 hours; your first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 320 papers and related BS Business Administration samples

OL 320 Module 2 questions, answered

What does OL 320 Milestone One require?

Milestone One of the entrepreneurship final project is usually a market research paper on the student's business idea. It typically includes secondary research on the industry and market, primary research such as surveys or interviews where possible, a description of the target customer and conclusions about whether demand exists.

What is the difference between primary and secondary research?

Secondary research uses information others have already collected, such as government statistics, industry reports and published studies. Primary research collects new information directly from potential customers through surveys, interviews, observation or product tests, and answers questions specific to the business idea.

What do TAM, SAM and SOM mean?

Total addressable market is the whole demand for a type of product. Serviceable available market is the part a business can realistically reach with its product and channels. Serviceable obtainable market is the share it can expect to win in the near term, given competition and resources.

Where can I find a free OL 320 Module 2 Milestone One example?

The complete milestone is above: market research for adaptive pants with national data, published studies, a 64-person survey and a prototype fit test, a target market and market size. Use it as a model.

How large should a survey be for OL 320 market research?

There is no fixed size, and a few dozen responses can be acceptable for a course project if you describe how people were reached and do not overstate what the results prove. Interviews can add depth a small survey lacks.