QSO 349 Module 2 Make-or-Buy Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 349 Module 2 Make-or-Buy Assignment sample compares make, buy and partial-buy options on cost, risk, capability and transaction costs and recommends one. SNHU QSO 349 (QSO-349) assigns make-or-buy analysis in Module 2, early in a procurement course taken in the BS Operations Management. The decision belongs to the Casco Narrows Ferry District, an invented Maine operator replacing a diesel ferry with a hybrid-electric boat. The analysis prices three ways to get the design done, from hiring naval architects to buying it outright, adds the expected cost of delay, tests the choice against transaction cost theory and recommends a split.

CourseQSO 349 Project Contracting and Procurement
ModuleModule 2
Paper typeundergraduate assignment comparing make, buy and partial-buy options on cost, risk, capability and transaction costs and recommending one
LengthAbout 1,080 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 349 Module 2

1

Hire Two Naval Architects or Buy the Drawings? A Make-or-Buy Analysis for the Casco Narrows Ferry Design

[Student Name]

Southern New Hampshire University

QSO 349: Project Contracting and Procurement

Make-or-Buy Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe options, costs and probabilities for the Casco Narrows Ferry District in this QSO 349 assignment are invented.
2

Hire Two Naval Architects or Buy the Drawings? A Make-or-Buy Analysis for the Casco Narrows Ferry Design

Introduction

The Casco Narrows Ferry District will replace its 1979 diesel ferry with a 149-passenger hybrid-electric boat that charges at the mainland terminal. Before any shipyard can price the boat, someone must design it: the hull form, the general arrangement of cabins and vehicle-free decks, the battery and propulsion system, stability calculations and the drawings and specifications the Coast Guard will review. The district's engineering office has three engineers, none of them naval architects. This assignment decides whether the district should do the design work itself, buy all of it or buy part of it, and recommends a split.

What this page is doingDefines the decision.
3

Scope of the Work

Ship design usually passes through stages. Concept design sets the boat's size, capacity, speed and propulsion. Contract design produces the drawings, specifications and calculations detailed enough for shipyards to bid a fixed price and for the Coast Guard to review the plans. Detail and production design turn those into the shop drawings and cutting files a particular yard uses to build. Construction support covers answering the yard's questions, reviewing its drawings and witnessing trials. To compare options fairly, each covers concept design, contract design, Coast Guard plan approval and construction support. Production design is treated separately, because shipyards normally do it for themselves within their price.

What this page is doingMakes the options comparable.
4

The Options

Cost of the three design options

ItemA. MakeB. Buy allC. Partial buy
Naval architects hired for 20 months$450,000
Software, model tests and tools$110,000
Battery and electrical specialists$160,000
Plan approval consultant$70,000
Naval architecture firm, fixed fee$880,000$560,000
Construction support, cappedIncluded$150,000
Direct cost$790,000$880,000$710,000
Probability of four-month delay40%15%15%
Expected cost of delay at $180,000$72,000$27,000$27,000
Risk-weighted cost$862,000$907,000$737,000

Option A hires two naval architects on 20-month appointments, with salaries and benefits of about $135,000 each a year, buys design software and a tank test of the hull model and contracts specialists for the battery and electrical system and for plan approval. Option B buys concept design, contract design and full detail drawings from a naval architecture firm for a fixed fee of $880,000, including construction support. Option C buys concept and contract design from the same kind of firm for $560,000, leaves detail and production design to the shipyard within its fixed price and buys construction support on a time-and-materials basis capped at $150,000.

A four-month delay in design costs about $180,000: the old ferry needs repairs to survive another season, and the district would charter a backup boat for peak weeks. The 40 percent probability for Option A reflects the district's lack of design experience and the time needed to recruit two naval architects to a small Maine agency. Options B and C carry the 15 percent probability the district's consultant reported for experienced firms on comparable ferries. Both buy options also carry the district's own costs of procurement, writing the request for proposals, evaluating firms and monitoring the contract, estimated at about $40,000, which are the same for both and are not shown.

What this page is doingPrices each way to get the design.
5

Option B Pays for Drawings Twice

Option B looks safe but buys work that the shipyard will repeat. Shipyards prepare their own production drawings to suit their equipment, welding methods and module sizes, so detailed drawings from a naval architect are partly redrawn at the yard's cost and folded into its price. Option C avoids that by stopping the firm's work at the contract design, which is the level of detail a fixed-price bid requires.

What this page is doingExplains why buying everything costs more.
6

Transaction Cost Reasoning

Williamson (1979) argues that the choice between making and buying depends on how often a transaction recurs, how uncertain it is and how specific the assets it requires are to the relationship. Designing a ferry is rare for this district, which replaces a boat roughly every twenty years. Frequency that low cannot justify a permanent design capability: when the boat is designed, the two naval architects in Option A would have nothing to do, and the district would lose what they learned. The design is specific to the route and terminal, but the skills are not, since many firms design passenger ferries. Uncertainty is high, which raises the cost of writing a complete contract, and that argues for keeping a capped, flexible arrangement for construction support rather than a fixed price.

Walker and Weber (1984), studying how a division of a US carmaker chose between building parts itself and buying them, found that differences in production cost between making and buying carried the most weight in the decision, while transaction cost factors such as volume uncertainty mattered mostly where few suppliers competed. Here the supplier market is competitive, with at least six firms that have designed hybrid or electric ferries in the United States, and the cost comparison favors buying. Both strands of evidence point the same way. A public agency adds its own constraint. Thai (2001) notes that public buyers answer for how openly they spend as well as how much, and hiring two specialists for 20 months would mean a public recruitment under civil service rules, a slower and less flexible commitment than a design contract that ends when the work does.

What this page is doingTests the choice against theory.
7

What the District Keeps

Buying the design does not mean handing over the project. The district keeps four things. It writes the owner's requirements, including capacity, route, speed, charging time, accessibility and crew size, which only it can know. It decides on every design trade-off the firm proposes, such as battery size against weight. It reviews the contract design before it goes to shipyards. And it holds the relationship with the Coast Guard and the board. One of the district's three engineers will be assigned to the design half-time for 14 months to do this work, a cost not included in the table because it is the same under every option.

What this page is doingStates what stays in-house.
8

Recommendation

The district should take Option C: buy concept and contract design from a naval architecture firm for a fixed fee, leave production design to the shipyard and buy construction support on a capped time-and-materials basis. It has the lowest risk-weighted cost, about $737,000 against $862,000 for making and $907,000 for buying everything; it avoids paying for drawings twice; and it matches transaction cost reasoning for rare, uncertain work in a competitive market. The district's design budget of $900,000 covers the option with about $160,000 to spare, which will be held for design changes after the Coast Guard's review.

What this page is doingChooses an option and explains it.
9

References

Thai, K. V. (2001). Public procurement re-examined. Journal of Public Procurement, 1(1), 9-50. https://doi.org/10.1108/JOPP-01-01-2001-B001

Walker, G., & Weber, D. (1984). A transaction cost approach to make-or-buy decisions. Administrative Science Quarterly, 29(3), 373-391. https://doi.org/10.2307/2393030

Williamson, O. E. (1979). Transaction-cost economics: The governance of contractual relations. Journal of Law and Economics, 22(2), 233-261. https://doi.org/10.1086/466942

What the QSO 349 Module 2 instructions ask for

The QSO 349 Module 2 assignment usually asks students to decide whether a project should perform a piece of work itself or buy it from an outside seller. Expect to identify the options, including partial buys; estimate the full cost of each, including salaries, overhead, tools and the buyer's cost of managing a contract; consider risk, schedule, quality, capability, control and confidentiality; and recommend an option with a justification. Strong analyses compare options on the same scope, put numbers on risks rather than listing them, account for transaction costs such as writing, awarding and monitoring a contract, explain what the organization gives up and keeps under each option and connect the reasoning to research on make-or-buy decisions.

How this QSO 349 Module 2 make-or-buy assignment example is built

The assignment decides how the Casco Narrows Ferry District, a fictional Maine ferry operator, will get its hybrid-electric ferry designed. Making means hiring two naval architects for 20 months plus specialists, about $790,000, with a 40 percent chance of a four-month delay because the district has never designed a boat. Buying the full design from a naval architecture firm costs $880,000. A partial buy, concept and contract design from a firm for $560,000, production design by the shipyard and construction support capped at $150,000, is lowest at about $737,000 once delay risk is priced. Williamson on frequency and asset specificity and Walker and Weber's evidence on make-or-buy decisions support the recommendation.

Where the QSO 349 Module 2 rubric puts the points

The QSO 349 make-or-buy assignment is commonly scored on identifying realistic options, estimating the full cost of each on a comparable scope, quantifying risk, weighing capability, control and transaction costs, a clear recommendation with justification and correct use of research. The strongest analyses show the arithmetic, include the buyer's own cost of managing the contract and explain what the organization keeps under its control. Credit drops when options cover different scopes, the make option omits overhead or learning time, risks appear only as words, the recommendation follows price alone or the transaction cost reasoning is missing. Tables, clarity and APA citations complete the rubric.

QSO 349 Module 2 help: the mistakes that cost points

Start by defining the work precisely, so that each option covers the same scope. List the options, including a partial buy, then estimate the full cost of each: for making, salaries and benefits, overhead, tools, training and the time it takes people to learn; for buying, the seller's price plus your cost of writing the solicitation, selecting a seller and monitoring the contract. Price the main risks by multiplying probability by cost. Then weigh what money does not show: whether the skill is needed again, whether the work is specific to your organization and how much control you need. A common mistake is comparing salaries with a seller's fee; another is ignoring how often the organization will need the skill again.

Get QSO 349 Module 2 written to your instructions

Share the QSO 349 Module 2 instructions and describe the work you are deciding to make or buy. A writer sets out the options, prices each with direct and hidden costs, adds expected costs of risk, weighs capability, control and transaction costs using research and recommends one with what the organization keeps in-house. Your first QSO 349 make-or-buy paper is free, returned in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 349 papers and related BS Operations Management samples

QSO 349 Module 2 questions, answered

Where can I find a free QSO 349 Module 2 Make-or-Buy Assignment sample?

The complete QSO 349 Module 2 assignment is on this page: a make-or-buy analysis for designing an invented ferry district's hybrid boat.

What is a make-or-buy analysis?

A comparison of performing work within the organization against purchasing it from an outside seller, weighing full costs, risk, capability, control and strategic fit.

What costs belong in the make option?

Salaries and benefits, overhead, tools, software, facilities, training and learning time, plus the cost of delays or errors from inexperience.

What are transaction costs?

The costs of buying beyond the price: searching for sellers, writing and negotiating contracts, monitoring performance and resolving disputes.

When should an organization make rather than buy?

When the work is frequent, specific to the organization, central to its capability or confidential, or when sellers are few and unreliable.