QSO 322 Module 5 Inventory and Warehousing Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 322 Module 5 Inventory and Warehousing Assignment sample applies ABC classification, inventory policy and warehouse slotting to reduce inventory cost and improve service. SNHU QSO 322 (QSO-322) assigns this inventory and warehouse work in Module 5 of its BS Operations Management logistics course. The company is Brightmoor Art Supply, an invented paint maker and distributor carrying 8,500 items worth $14.2 million. The paper ranks items by sales, sets safety stock by class, proposes dropping about 1,800 slow items and cutting inventory by $2.6 million while raising fill rates on the items that sell most, and redesigns where fast-moving items sit in the warehouse to shorten picking.

CourseQSO 322 Logistics Management
ModuleModule 5
Paper typeundergraduate assignment applying ABC classification, inventory policy and warehouse slotting to reduce inventory cost and improve service
LengthAbout 1,090 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 322 Module 5

1

Fewer Items, Faster Picks: Inventory Classification and Slotting at Brightmoor Art Supply

[Student Name]

Southern New Hampshire University

QSO 322: Logistics Management

Inventory and Warehousing Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe item counts, inventory values and warehouse figures for Brightmoor in this QSO 322 assignment are invented.
2

Fewer Items, Faster Picks: Inventory Classification and Slotting at Brightmoor Art Supply

Introduction

Brightmoor Art Supply carries about 8,500 items, from tubes of paint to canvases, brushes and paper, and Module 2 put its average stock at roughly four months of sales. Project One found that inventory is too high in slow-selling items and too thin in the fastest ones, which causes partial shipments during the school peak, and that fast-moving items are scattered across the warehouse. This assignment classifies the inventory, recommends policies for each class, identifies items to remove and redesigns where items sit in the warehouse. The analysis uses 2025 sales and inventory data for every item.

What this page is doingStates the purpose and the data.
3

ABC Classification

Items were ranked by annual sales at cost, and cumulative shares were calculated.

ABC classification of Brightmoor's items, 2025 (invented data)

ClassItemsShare of itemsShare of salesShare of inventory valueDays of supply
A1,10013 percent78 percent44 percent67
B2,20026 percent18 percent25 percent171
C5,20061 percent4 percent31 percent900

The pattern is typical but extreme. C items, mostly specialty paint colors, unusual canvas sizes and discontinued brushes, hold almost a third of inventory value for a twenty-fifth of sales and sit on the shelf for more than two years on average. A items, the core colors, standard canvases and student sets, turn quickly but are sometimes short in July and August.

Teunter et al. (2010) showed with three large industrial datasets that the common practice of ranking items by sales value or volume and setting the same service level within each class can be far from cost-optimal, and they proposed a criterion that also weighs each item's shortage cost, holding cost and order size. Brightmoor's data do not yet support that criterion for every item, but its logic is applied in one adjustment: a few B items that are essential parts of school kits, such as a basic brush set, are moved into class A because a shortage of them delays entire school orders.

What this page is doingRanks the items.
4

Inventory Policy by Class

A items will be reviewed weekly with a target line fill rate of 98 percent. Safety stock for each is set from the variability of its weekly demand and its supplier lead time, using the normal approximation for the chosen service level. For the July and August peak, A item targets are raised using last year's peak-week demand rather than the annual average. B items will be reviewed every two weeks with a 95 percent target. C items will be reviewed monthly with a 90 percent target, and many will move to a make-to-order or order-on-demand basis.

Raising the A item target from about 93 percent to 98 percent increases A item safety stock by about $0.6 million, which is the price of fewer school shortages and partial shipments.

What this page is doingSets service levels and safety stock.
5

Items to Remove

About 1,800 C items sold fewer than 20 units in 2025, and 640 of them are paint colors with remaining shelf life of under a year. These items will be discontinued or converted to special order, with remaining stock sold through a clearance channel. Removing them and moving remaining C items to monthly review reduces average inventory by about $3.2 million. Net of the added A item safety stock, inventory falls by about $2.6 million, to about $11.6 million, and carrying cost falls by about $620,000 a year at the 24 percent rate. Obsolescence write-offs, which were $410,000 in 2025, should fall by half.

What this page is doingCuts slow inventory.
6

Warehouse Slotting

Gu et al. (2007) describe storage assignment as a central warehouse decision because it determines how far pickers travel, which is usually the largest part of picking time. At Brightmoor, each new product went wherever an empty bay happened to be on the day it arrived, which is why the quickest sellers ended up spread through every aisle. A sample of 200 pick routes showed pickers walking an average of 410 feet per order line.

The new slotting plan ranks items by pick frequency, not sales value, since a cheap tube of white paint is picked far more often than an expensive easel. The 400 most frequently picked items, which account for about 61 percent of order lines, will move to a forward pick area of 18,000 square feet next to the packing lines, arranged so items often ordered together, such as a school kit's components, sit side by side. Slow items move to upper racks and the back of the building. Simulating last July's orders against the new layout cuts average travel per line to about 220 feet and raises expected peak productivity from under 60 to about 75 lines per worker hour.

What this page is doingMoves fast items near packing.
7

Cycle Counting and Replenishment

Class-based policies only work if the inventory records are right. Brightmoor counts its whole inventory once a year in January, and record accuracy for A items, measured in a sample count in October, was about 92 percent, meaning one location in thirteen showed a different quantity on the shelf than in the system. The plan replaces the annual count with cycle counting: A items counted every month, B items every quarter and C items twice a year, done by two staff during the slow spring months and by one during the peak. The forward pick area will be replenished from reserve storage twice a day in July and August, triggered when a location falls below a set minimum, so pickers never find an empty slot during a school rush. Together these routines are expected to raise A item record accuracy above 98 percent, which matters because a reorder point based on a wrong count orders too late.

What this page is doingKeeps the new policies accurate.
8

Effect on Cost and Service

Estimated effects of the inventory and slotting changes

Measure2025Expected after changes
Average inventory$14.2 million$11.6 million
Inventory carrying cost$3.4 million$2.8 million
Days of supply11896
Line fill rate, school peak88 percent95 percent
Peak pick productivityUnder 60 lines per hourAbout 75 lines per hour
What this page is doingSummarizes the impact.
9

Trade-offs

Ballou (2007) emphasized that logistics decisions involve trade-offs across functions. Dropping 1,800 items will disappoint some loyal artists and stores, so the most requested discontinued colors will remain available as special orders with a two-week lead time. The forward pick area takes space now used for reserve storage, which slightly increases replenishment moves. And higher A item safety stock adds cost in exchange for service at the peak.

What this page is doingNotes what the changes give up.
10

Conclusion

Brightmoor should adopt class-based inventory policies, remove about 1,800 slow items and reorganize the warehouse around pick frequency. These changes cut inventory and carrying cost while improving service where it matters most, and they prepare the warehouse for the network changes in Project Two.

What this page is doingStates the recommendation.
11

References

Ballou, R. H. (2007). The evolution and future of logistics and supply chain management. European Business Review, 19(4), 332-348. https://doi.org/10.1108/09555340710760152

Gu, J., Goetschalckx, M., & McGinnis, L. F. (2007). Research on warehouse operation: A comprehensive review. European Journal of Operational Research, 177(1), 1-21. https://doi.org/10.1016/j.ejor.2006.02.025

Teunter, R. H., Babai, M. Z., & Syntetos, A. A. (2010). ABC classification: Service levels and inventory costs. Production and Operations Management, 19(3), 343-352. https://doi.org/10.1111/j.1937-5956.2009.01098.x

What the QSO 322 Module 5 instructions ask for

The QSO 322 Module 5 assignment usually asks students to analyze inventory management and warehousing in an organization. Expect to classify inventory, often with ABC analysis, recommend inventory policies such as reorder points, order quantities and safety stock, explain how service levels are set and examine warehouse operations, including layout, storage assignment and picking. Many versions ask students to estimate the effect of their recommendations on inventory investment, carrying cost and service. Strong submissions use data on item sales and inventory values, set different policies for different classes, connect warehouse layout to picking productivity and show the trade-off between inventory cost and fill rate rather than reducing inventory blindly.

How this QSO 322 Module 5 inventory and warehousing assignment example is built

The assignment analyzes Brightmoor Art Supply, a fictional company holding $14.2 million of inventory across 8,500 items. An ABC ranking by annual sales puts 1,100 A items behind 78 percent of sales, 2,200 B items behind 18 percent and 5,200 C items behind 4 percent but 31 percent of inventory value. Safety stock is set to a 98 percent service level for A items, 95 for B and 90 for C, and about 1,800 C items, mostly slow paint colors that expire, are proposed for removal, cutting inventory by about $2.6 million. Teunter, Babai and Syntetos on better ABC criteria, the Gu team's warehouse review and Ballou on trade-offs guide a slotting plan that moves the 400 fastest items near the packing lines.

Where the QSO 322 Module 5 rubric puts the points

Marks for the QSO 322 inventory and warehousing assignment generally follow the soundness of the classification, the logic of policies and safety stock by class, attention to the trade-off between inventory investment and service, the quality of the warehouse analysis, estimates of financial and service effects and use of research. Submissions that score highest base every number on item data, set service levels deliberately by class, show how much inventory and carrying cost change and connect slotting to picking time. Credit drops when ABC analysis is described but not applied, one policy is used for all items, inventory is cut without considering stockouts or warehouse recommendations lack measurable effects. Tables and APA citations count as well.

QSO 322 Module 5 help: the mistakes that cost points

Sort every item by annual sales value, from largest to smallest, and calculate the cumulative share of sales; the items making up roughly the first 75 to 80 percent are A items, the next 15 to 20 percent B and the rest C. Then compare each class's share of sales with its share of inventory value, which usually shows too much invested in slow items. Set higher service levels and tighter control for A items and simpler rules for C items, and look for C items that could be dropped or made to order. For the warehouse, place the fastest-moving items closest to packing and shipping. A common mistake is setting the same service level for every item; another is cutting inventory without estimating stockouts.

Get QSO 322 Module 5 written to your instructions

Send the QSO 322 Module 5 instructions and describe your company's inventory and warehouse. A writer ranks items with ABC or a better criterion, sets inventory policy and safety stock by class, identifies items to cut and redesigns slotting for faster picking, with the effect on cost and service estimated. Your first QSO 322 inventory assignment is free, generally two days out. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 322 papers and related BS Operations Management samples

QSO 322 Module 5 questions, answered

Where can I find a free QSO 322 Module 5 Inventory and Warehousing Assignment sample?

This page holds the complete QSO 322 Module 5 assignment: ABC ranking, safety stock and warehouse slotting for an invented art supply company.

What is ABC inventory classification?

Ranking items by annual usage value so that a small number of A items, which make up most of the value, receive the closest control, while many low-value C items are managed simply.

How should safety stock differ by class?

A items usually get higher service levels because stockouts cost the most sales; C items often get lower levels or are made or ordered on demand.

What is slotting in a warehouse?

Deciding where each item is stored, usually placing the fastest-moving items in the most accessible locations near packing to reduce picker travel and time.

Why do slow-moving items cost so much?

They tie up capital and space, risk expiring or becoming obsolete and often make up a large share of inventory value despite a small share of sales.