QSO 322 Module 3 Project One Example

Reviewed by Portia Lambrick, MBA

This QSO 322 Module 3 Project One sample assesses an organization's logistics system, including customer service levels, costs and the problems a redesign must solve. SNHU QSO 322 (QSO-322) collects this assessment in Module 3 of its BS Operations Management logistics course, before any redesign is proposed. The company is Brightmoor Art Supply, an invented Columbus maker and distributor of paints and art materials that ships from a single warehouse. The paper measures service separately for art stores, school districts and online shoppers, then traces the results to the network, transportation, inventory, warehousing and order processing, and ends with five problems for the improvement plan in Project Two.

CourseQSO 322 Logistics Management
ModuleModule 3
Paper typeundergraduate project assessing an organization's logistics system, its customer service levels and costs, and the problems a redesign must solve
LengthAbout 1,080 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Operations Management
UpdatedOctober 2026

Free sample paper for QSO 322 Module 3

1

One Warehouse, Three Customers: A Logistics System Assessment for Brightmoor Art Supply

[Student Name]

Southern New Hampshire University

QSO 322: Logistics Management

Project One: Logistics System Assessment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe service levels, network and operating data for Brightmoor Art Supply in this QSO 322 project are made up.
2

One Warehouse, Three Customers: A Logistics System Assessment for Brightmoor Art Supply

Introduction

Brightmoor Art Supply makes paints in Columbus, Ohio, buys canvases, brushes and paper from suppliers and sells about 8,500 items to three groups of customers from a single warehouse. Module 2 found that its logistics costs, 13.8 percent of sales, are well above its 10 percent target. This project assesses the logistics system as a whole: the service each customer group receives, the functions that produce that service and the problems a redesign must solve. Mentzer et al. (2001) found that logistics service quality has several dimensions and that their importance differs across customer segments, so service is measured separately for each group.

What this page is doingStates the scope of the assessment.
3

Customers and Their Needs

Art stores, about 1,400 independent shops, account for $68 million in sales. They order every two to four weeks, usually by freight, and value complete orders and predictable delivery more than speed. School districts, about 900 customers on annual bids, account for $31 million. Most order in July and August, and their contracts require delivery before classes start, which Brightmoor promises by August 15. Online shoppers, mostly hobbyists and art students, account for $43 million through about 610,000 parcels a year and expect fast delivery at low shipping charges.

What this page is doingDescribes the three segments.
4

Customer Service Results

Logistics service by customer segment, 2025 (invented data)

MeasureArt storesSchool districtsOnline shoppers
Order lines shipped complete91 percent88 percent96 percent
On-time delivery93 percent81 percent by August 1589 percent within promise
Median order-to-delivery time4 business days9 business days at peak2 days East, 5 days West
Damage claims0.8 percent of orders0.6 percent2.1 percent

The school segment is the most poorly served, with nearly one district in five receiving at least part of its order late. Online customers in the West wait more than twice as long as those in the East. Fisher et al. (2019), studying an apparel retailer that opened a new warehouse closer to its western customers, found that online sales rose about 1.45 percent for each business day cut from delivery time, with a spillover to its stores. If anything like that applies to Brightmoor, slow western delivery is costing sales.

What this page is doingMeasures service by segment.
5

The Network

All outbound volume leaves a single Columbus building beside the plant that makes the paint. The location is central for the East and Midwest, where about 69 percent of online orders and most stores and schools are, but it puts every western customer three to five ground transit days away. No other facility holds inventory.

What this page is doingExamines the structure of the system.
6

Transportation

Online orders ship by parcel at an average of $9.20, $12.40 for western parcels. Store and school orders ship by less-than-truckload carriers. In late July, freight capacity tightens and rates rise, and school orders that are picked late wait for trucks. Inbound canvases arrive in ocean containers through East Coast ports and are trucked to Columbus.

What this page is doingExamines how goods move.
7

Inventory

Average inventory is $14.2 million, about 118 days of supply, but it is unevenly distributed. The 1,100 fastest-selling items, mostly core paint colors, standard canvases and student brush sets, account for 78 percent of sales and are sometimes short during the school peak, which explains much of the 88 percent fill rate for schools. The slowest 5,200 items account for only 4 percent of sales but 31 percent of inventory value, and many paint colors among them expire before they sell.

What this page is doingExamines what is held and why.
8

Warehousing

The warehouse is lightly used from January to May and overwhelmed in July and August. Pick productivity averages about 74 order lines per worker hour but falls below 60 at peak, when temporary staff are new and aisles are crowded. Gu et al. (2007) describe how storage assignment affects picker travel; at Brightmoor, fast-moving items are scattered because they were placed where space was free when they were introduced. Online orders are packed at a single packing line, where canvases are boxed in standard large cartons that trigger dimensional weight charges.

What this page is doingExamines the building and its work.
9

How the Functions Interact

The weaknesses are linked. The single warehouse keeps inventory and building costs low but lengthens western delivery and raises parcel costs. The summer peak overwhelms both the warehouse and the freight market at the same moment, so late picking and scarce trucks compound each other. Thin stock of fast-moving items at peak causes partial shipments, which add freight costs when the remainder follows. And the packing line's use of oversized cartons trades a simpler packing process for higher parcel charges. Any fix in one function will move costs elsewhere, so the improvement plan must weigh them together.

What this page is doingShows trade-offs across the system.
10

Benchmarks

Brightmoor's targets, set by its leadership, are a 95 percent line fill rate for all segments, 98 percent on-time delivery for schools by their deadline and three-day delivery for at least 90 percent of online orders nationwide. The company misses all three. Its logistics cost of 13.8 percent of sales compares with a target of 10 percent and with roughly 9 to 11 percent reported by two regional competitors in trade interviews, which suggests the target is realistic. Closing the gaps will require changes to the network and to inventory policy, not only harder work in the existing building.

What this page is doingCompares results with targets.
11

Order Processing

Online orders flow automatically from the website. Store orders arrive through a portal, email and phone. School orders arrive as purchase orders from district systems and are often entered by hand in July, when the customer service team is stretched; errors in hand-entered school orders caused about a quarter of school late deliveries.

What this page is doingExamines how orders enter the system.
12

Data Limits

The assessment relies on the company's order and shipping records, which are reliable for dates, costs and quantities, and on estimates in two places. Damage rates come from claims filed, so they understate damage that customers absorbed without complaint. And pick productivity is measured for the whole warehouse rather than by zone, so the effect of scattered fast movers is estimated from walking distances on a sample of pick routes rather than measured directly. Neither limit changes the direction of the findings.

What this page is doingNotes where the assessment relies on estimates.
13

Problems for the Improvement Plan

Five problems emerge. First, western online customers wait too long and cost too much to serve from Ohio. Second, school orders miss the August 15 deadline too often because of late picking, scarce freight and entry errors at the peak. Third, inventory is too high in slow items and too thin in fast ones. Fourth, canvas packaging triggers dimensional weight charges and higher damage. Fifth, the warehouse layout and staffing do not match the seasonal pattern of demand. Project Two will propose a plan addressing each.

What this page is doingStates what must be solved.
14

References

Fisher, M. L., Gallino, S., & Xu, J. J. (2019). The value of rapid delivery in omnichannel retailing. Journal of Marketing Research, 56(5), 732-748. https://doi.org/10.1177/0022243719849940

Gu, J., Goetschalckx, M., & McGinnis, L. F. (2007). Research on warehouse operation: A comprehensive review. European Journal of Operational Research, 177(1), 1-21. https://doi.org/10.1016/j.ejor.2006.02.025

Mentzer, J. T., Flint, D. J., & Hult, G. T. M. (2001). Logistics service quality as a segment-customized process. Journal of Marketing, 65(4), 82-104. https://doi.org/10.1509/jmkg.65.4.82.18390

What the QSO 322 Module 3 instructions ask for

QSO 322 Project One typically asks students to analyze the logistics system of a chosen organization. Expect to describe the organization and its customers, assess customer service levels, examine each logistics function, such as the distribution network, transportation, inventory management, warehousing and order processing, identify strengths and weaknesses and the trade-offs among functions and summarize the problems that need to be solved. Strong projects measure service with specific metrics such as fill rate, on-time delivery and order cycle time, break results down by customer segment, connect each weakness to its causes in the system and use data rather than impressions. The assessment should prepare the ground for an improvement plan.

How this QSO 322 Module 3 project one example is built

The project assesses the logistics system of Brightmoor Art Supply, a fictional company that ships 8,500 items from one Ohio warehouse to art stores, school districts and online customers. Service is measured by segment: art stores receive 91 percent of order lines complete and wait about four days; only 81 percent of school orders arrive by the August 15 deadline; online customers get parcels in a median of two business days in the East and five in the West. The network, transportation, inventory, warehousing and order processing are examined in turn and linked to these results. Mentzer, Flint and Hult on segment-specific service, the Fisher, Gallino and Xu study of faster delivery and the Gu team's warehouse review support the assessment.

Where the QSO 322 Module 3 rubric puts the points

For QSO 322 Project One, instructors look at whether the organization and its customers are clearly described, service is measured with appropriate metrics by segment, each logistics function is analyzed with evidence, weaknesses are traced to causes, trade-offs among functions are recognized and the problems for the improvement plan are clearly stated. Projects that score highest use data for every claim, show how one function's problem appears in another's results and prioritize the problems. Points fall when service is described in general terms, functions are reviewed in isolation, causes are guessed or the problem list is unfocused. Organization, tables and APA citations complete the rubric.

QSO 322 Module 3 help: the mistakes that cost points

Start with customers: who they are, what they order and what service they expect. Measure service for each group with numbers, such as the share of order lines shipped complete, the share delivered on time and the time from order to delivery. Then work backward through the system: where inventory sits, how orders are picked and packed, how goods move and how orders are taken. For each weakness in service, find the cause in the system, and note where fixing one function would strain another. A common mistake is describing each function as if it stood alone; another is using company averages that hide a struggling segment. End with three to five clearly stated problems, ranked by their effect on customers and cost.

Get QSO 322 Module 3 written to your instructions

Upload the QSO 322 Project One guidelines and describe the company you are assessing. A writer measures its logistics service by customer segment, traces the results to network, transportation, inventory, warehousing and order processing, quantifies costs and identifies the problems your improvement plan should address. The first QSO 322 project is free, delivered within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 322 papers and related BS Operations Management samples

QSO 322 Module 3 questions, answered

Where can I find a free QSO 322 Module 3 Project One sample?

The full QSO 322 Project One is on this page: a logistics system assessment of an invented art supply company's service, network, inventory and warehouse.

What metrics measure logistics customer service?

Fill rate (share of order lines or units shipped complete), on-time delivery, order cycle time from order to delivery, order accuracy and the condition of goods on arrival.

How do you assess a logistics system?

Measure service by customer segment, examine the network, transportation, inventory, warehousing and order processing with data, trace service problems to their causes and note trade-offs between functions.

Does faster delivery increase sales?

Research on an apparel retailer found that each business day cut from online delivery time raised its online sales, with spillover to its physical stores.

Why measure service by customer segment?

Different customers value different aspects of service, and a company average can hide a segment that is poorly served.