| Course | QSO 322 Logistics Management |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment analyzing an organization's total logistics cost by function and explaining the trade-offs among them |
| Length | About 1,050 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 322 Module 2
Where 13.8 Percent of Sales Goes: A Total Logistics Cost Analysis for Brightmoor Art Supply
[Student Name]
Southern New Hampshire University
QSO 322: Logistics Management
Logistics Cost Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Where 13.8 Percent of Sales Goes: A Total Logistics Cost Analysis for Brightmoor Art Supply
Introduction
Brightmoor Art Supply's leadership has set a goal of holding logistics costs to 10 percent of sales. In 2025 they reached 13.8 percent, $19.6 million on $142 million in sales. This assignment breaks that total into its functions, explains the drivers of the largest costs and identifies the trade-offs that a total cost view reveals. Ballou (2007) described how logistics emerged as a field partly through the recognition that transportation, inventory and warehousing costs are linked and should be managed together, and that idea, the total cost concept, frames the analysis.
The Cost Breakdown
Brightmoor Art Supply logistics costs, 2025 (invented figures)
| Category | Cost | Share of sales | Main driver |
|---|---|---|---|
| Outbound parcel | $5.6 million | 3.9 percent | 610,000 online parcels; distance and box size |
| Outbound freight to stores and schools | $3.8 million | 2.7 percent | Less-than-truckload shipments; summer school peak |
| Inbound transportation | $2.1 million | 1.5 percent | Canvas and brush imports; paint raw materials |
| Warehousing | $3.9 million | 2.7 percent | Labor, overtime, building and equipment |
| Inventory carrying | $3.4 million | 2.4 percent | $14.2 million average inventory at 24 percent |
| Order processing | $0.8 million | 0.6 percent | Customer service staff and systems |
| Total | $19.6 million | 13.8 percent |
Outbound transportation, at $9.4 million, is almost half of the total. Inventory carrying cost is the third largest category even though it never arrives as a bill.
Outbound Parcel Cost
Online orders average $70 and cost about $9.20 each to ship. Two drivers raise that cost. The first is distance. About 31 percent of online orders go to customers west of the Rocky Mountains, and those parcels average $12.40 against $7.80 for the rest, because every parcel travels from Ohio. The second is packaging. Canvases ship in large, light boxes, and carriers bill such packages by dimensional weight, a charge based on the box's size rather than its actual weight. In 2025, 23 percent of parcels were billed this way, adding about $1.3 million over what their actual weights would have cost.
Outbound Freight Cost
Art stores order every two to four weeks, and their shipments travel by less-than-truckload carriers at about $70 per order. School districts order mostly in July and August for delivery before classes begin, and their bids require delivery by August 15. To meet that date, Brightmoor ships many school orders in partial loads and pays premium rates in late July, when freight capacity is tight. School freight costs about 40 percent more per pound than store freight.
Warehousing Cost
Warehousing costs $3.9 million, of which labor is about 60 percent. The warehouse runs at about half its capacity from January to May and far beyond it in July and August, when overtime rises to 60 percent of regular hours and temporary staff are hired. Gu et al. (2007), reviewing research on warehouse operations, describe how receiving, storage, picking and shipping interact, and how storage assignment, the placement of items in the building, affects travel time in picking. At Brightmoor, fast-moving paints are scattered across the building, so pickers walk farther than necessary.
Inventory Carrying Cost
Average inventory in 2025 was $14.2 million at cost, about 118 days of supply. Using a carrying rate of 24 percent a year, made up of the cost of capital at 9 percent, storage and handling at 6 percent, insurance and taxes at 2 percent and shrinkage, damage and obsolescence at 7 percent, carrying cost is about $3.4 million. Obsolescence is high because paints have a shelf life and slow-selling colors expire on the shelf.
Costs per Order by Segment
Dividing costs by customer segment gives a sharper picture than the company total. An online order costs about $9.20 to ship, plus roughly $4.10 in picking, packing and order handling, for about $13.30 on an average order of $70, or 19 percent of the order's value. An art store order costs about $70 in freight plus $18 in handling on an average order of about $1,300, under 7 percent. A school order costs about $230 in freight at peak rates plus $40 in handling on an average order of about $4,200, about 6.4 percent, but its late deliveries carry a hidden cost in lost bids. Online orders are therefore the most expensive to serve relative to their value, and the western share of them the most expensive of all. That finding matters because online sales are the fastest-growing segment, up 14 percent in 2025 while store and school sales grew 3 percent.
Trade-offs Revealed
Three trade-offs stand out. First, the single warehouse keeps warehousing and inventory costs lower than a multi-site network would, but it raises western parcel costs and delivery times. A second warehouse in the West would cut parcel costs there but add rent, labor and inventory. Second, shipping school orders in partial loads at peak rates is expensive, but holding them for full loads would miss the August 15 deadline and risk losing the bids. Earlier shipments in June, when freight is cheaper, would lower transport cost but require schools to accept and store orders earlier. Third, smaller boxes would cut dimensional weight charges but could raise damage rates, and every damaged canvas brings a replacement shipment and a refund. Lambert and Cooper (2000) argued that supply chain decisions must consider the effects across functions and companies rather than within one department; each of these trade-offs crosses departmental lines at Brightmoor.
Opportunities Already Visible
The cost breakdown already suggests where savings lie. Cutting dimensional weight charges by half through better canvas packaging would save about $650,000. Moving school shipments from late July into June, when freight is cheaper, could cut school freight costs by perhaps 15 percent, about $200,000, if districts accept early delivery. Reducing average inventory by $2 million, mostly in slow-selling items, would lower carrying cost by about $480,000. Serving western online customers from a closer location would lower parcel costs there by about $4 an order, about $750,000 a year, but would add warehouse and inventory costs that must be estimated. Each of these is examined in Project One and planned in Project Two.
Conclusion
Brightmoor's logistics costs are high mainly because of where its customers are relative to its one warehouse, how it packs canvases and how it handles the school peak. Project One will assess the whole logistics system, including service levels, to decide which trade-offs to change.
References
Ballou, R. H. (2007). The evolution and future of logistics and supply chain management. European Business Review, 19(4), 332-348. https://doi.org/10.1108/09555340710760152
Gu, J., Goetschalckx, M., & McGinnis, L. F. (2007). Research on warehouse operation: A comprehensive review. European Journal of Operational Research, 177(1), 1-21. https://doi.org/10.1016/j.ejor.2006.02.025
Lambert, D. M., & Cooper, M. C. (2000). Issues in supply chain management. Industrial Marketing Management, 29(1), 65-83. https://doi.org/10.1016/S0019-8501(99)00113-3
What the QSO 322 Module 2 instructions ask for
The QSO 322 Module 2 assignment typically asks students to analyze the costs of logistics in an organization. Expect to identify the major cost categories, usually transportation, warehousing, inventory carrying, order processing and administration, estimate or report each one, express the total as a share of sales or per order and explain what drives each cost. Many versions ask about the total cost concept, the idea that logistics decisions should minimize total cost for a given level of service rather than any single cost. Strong submissions use real or realistic figures, calculate inventory carrying cost properly, identify the specific drivers behind the largest costs and give concrete examples of trade-offs between categories.
How this QSO 322 Module 2 logistics cost assignment example is built
The assignment analyzes $19.6 million in logistics costs at Brightmoor Art Supply, a made-up company with $142 million in sales. Outbound transportation is the largest share at $9.4 million, with parcel shipping to online customers at $5.6 million; warehousing costs $3.9 million; inventory carrying cost, at 24 percent of a $14.2 million average inventory, is $3.4 million; inbound shipping is $2.1 million; order processing $0.8 million. Two drivers stand out: western parcels cost a third more than eastern ones because they travel farther from the single Ohio warehouse, and 23 percent of parcels are billed by size rather than weight because canvases ship in oversized boxes. Ballou, Lambert and Cooper and the Gu team's warehouse review frame the trade-offs.
Where the QSO 322 Module 2 rubric puts the points
Scoring of the QSO 322 cost assignment usually follows the completeness of the cost categories, the accuracy of each estimate including inventory carrying cost, a clear account of what drives the largest costs, a correct explanation of the total cost concept with specific trade-offs and use of research or course concepts. The best submissions show costs per order or per unit as well as in total, connect each driver to a decision the company made and explain how changing one cost would move others. Credit drops when inventory carrying cost is omitted or calculated as interest only, when costs are listed without drivers, when trade-offs are described in general or when figures do not add up. Tables and APA citations count too.
QSO 322 Module 2 help: the mistakes that cost points
List every logistics cost category and find a figure or estimate for each: freight bills for transportation, rent, labor and equipment for warehousing, inventory value times a carrying rate for inventory and order-handling labor and systems for order processing. A carrying rate usually includes capital, storage, insurance, shrinkage and obsolescence, often 20 to 30 percent a year. Express the total as a share of sales and per order. Then, for the largest costs, ask what drives them, such as distance, shipment size, packaging, number of items or service promises. A common mistake is treating each cost in isolation; another is ignoring inventory because it does not appear as a bill. Give at least two concrete trade-offs, such as more warehouses lowering freight but raising inventory and rent.
Get QSO 322 Module 2 written to your instructions
Share the QSO 322 Module 2 instructions and what you know of your company's logistics costs. A writer builds a total logistics cost breakdown by function, finds the drivers behind each cost, compares the total with a benchmark or target and explains the trade-offs that a cut in one area would create elsewhere. Your first QSO 322 cost assignment is free and ready in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 322 papers and related BS Operations Management samples
- QSO 322 Module 1 Discussion: What Logistics Means at a Paint Company
- QSO 322 Module 3 Project One: Assessing the One-Warehouse System
- QSO 322 Module 4 Discussion: School Bids, Two-Day Delivery and Their Cost
- QSO 322 Module 5 Inventory and Warehousing Assignment: Ranking 8,500 Items and Slotting the Fast Ones
- QSO 322 Module 6 Discussion: Should a 3PL Run the Western Warehouse?
- QSO 322 Module 7 Project Two: The Logistics Improvement Plan
- QSO 322 Module 8 Discussion: One Warehouse, One Storm
- INT 315 Module 8 Discussion: Overtime in Peak Season
- QSO 489 Module 7 Final Project: The Operations Improvement Plan
- QSO 320 Module 5 Transportation Model Assignment: Shipping From Three Farms to Eight Lots
- ACC 427 Module 4 Project One: Fuel Cards Matched to Truck GPS
QSO 322 Module 2 questions, answered
Where can I find a free QSO 322 Module 2 Logistics Cost Assignment sample?
The complete QSO 322 Module 2 assignment is on this page: an invented art supply company's total logistics cost broken down by function with its trade-offs.
What is the total cost concept in logistics?
The principle that logistics decisions should minimize the combined cost of transportation, inventory, warehousing and order processing for a required service level, rather than minimizing any one cost alone.
How do you calculate inventory carrying cost?
Multiply average inventory value by an annual carrying rate that includes the cost of capital, storage, insurance, taxes, shrinkage and obsolescence, often 20 to 30 percent.
What is dimensional weight in parcel shipping?
A pricing method in which carriers bill large, light packages by their size rather than their actual weight, which raises costs for bulky items such as canvases.
What share of sales do logistics costs usually take?
It varies widely by industry and product; for distributors of bulky or low-value goods it is often in the high single digits to low teens as a percentage of sales.