HRM 425 Module 3 Milestone One Example

Reviewed by Portia Lambrick, MBA

This HRM 425 Module 3 Milestone One sample designs the recruitment and selection stage of the employee life cycle for one hard-to-fill job. In SNHU HRM 425 (HRM-425), BS Human Resource Management students use the first milestone to show how an organization attracts and chooses people who will stay and succeed. For Holston Electric Company, a composite Knoxville electrical contractor losing many first-year apprentices, the paper analyzes the job, reviews current recruiting results by source, proposes a realistic job preview and new sources, builds a selection sequence from validated methods, checks it for fairness and sets measures that link hiring choices to first-year retention.

CourseHRM 425 Employee Life Cycle Management
ModuleModule 3
Paper typeundergraduate milestone presenting a recruitment and selection strategy
LengthAbout 1,060 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Human Resource Management
UpdatedOctober 2026

Free sample paper for HRM 425 Module 3

1

Cold Mornings on Camera: A Recruitment and Selection Strategy for Holston Electric's Apprentices

[Student Name]

Southern New Hampshire University

HRM 425: Employee Life Cycle Management

Milestone One: Recruitment and Selection Strategy

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingHolston Electric Company and its recruiting figures are an invented teaching case.
2

Cold Mornings on Camera: A Recruitment and Selection Strategy for Holston Electric's Apprentices

Introduction

Holston Electric Company needs about 30 new apprentices a year to meet its five-year workforce plan, and it needs far more of them to finish the four-year program. Today 45 percent do not. Many quit within the first two years, often citing pay, but earlier analysis suggests that a misleading job ad, a selection process that never showed applicants the work and a weak first week set those quits in motion. This milestone redesigns how Holston recruits and selects apprentices, beginning with the job, then recruiting sources and messages, the selection sequence, fairness checks and measures linked to first-year retention.

What this page is doingHiring for the second year.
3

The Job

Interviews with eight foremen and twelve second-year apprentices, and two days of shadowing on a warehouse project, produced a clear picture. First-year apprentices spend most of their time on rough-in: carrying and bending conduit, pulling wire, mounting boxes and cleaning up, often outdoors or in unheated buildings, starting at 6:30 a.m. They attend evening classes two nights a week at the regional training center. They need basic applied math, safe work habits, physical stamina, reliability and willingness to take direction. Apprentice pay starts at $18.50 an hour and rises every six months with completed hours and classes, reaching about $29 in the fourth year.

What this page is doingWhat a first-year apprentice really does.
4

Current Recruiting

Apprentices hired in the past three years, by source

SourceHiresStill employed after 24 months
Online job board4152 percent
Walk-in or company website2258 percent
Referral by current employee1979 percent
High school career program978 percent

Breaugh (2008), reviewing recruitment research, notes that employee referrals often produce hires who stay longer, partly because referrers give candidates accurate information about the job. Holston's data fit that pattern: referred apprentices stayed at far higher rates than job board hires, yet the company spent most of its recruiting budget on job boards.

What this page is doingWhat the data show.
5

Recruiting Message

Holston's current ad shows a clean panel room. The new message will be a three-minute realistic job preview video filmed on a January rough-in site, with two apprentices describing cold early starts, evening classes, the physical work and the pay schedule, and a foreman explaining what the trade offers after four years, including the wage of a licensed journeyman and the chance to run a crew. Pooling dozens of studies, Earnest et al. (2011) showed that realistic job previews trim turnover by a modest amount, and that much of the effect works through applicants seeing the employer as honest. Chapman et al. (2005) found that applicants' attraction depends on job and organizational characteristics and on how recruiters treat them, so the video will be paired with a quick, respectful response to every applicant.

What this page is doingTelling the truth about the work.
6

New Sources

Holston will shift its budget toward sources that produce apprentices who stay. It will pay current apprentices and journeymen a $750 referral bonus, half at hire and half after twelve months. It will partner with two Knox County high school career academies, offering job shadow days and summer helper jobs to juniors and seniors. And it will join a regional veterans' transition program, since many service members leave with mechanical experience and work habits suited to the trade. Job board spending will be cut by half.

What this page is doingWhere to look.
7

Selection Sequence

The current process uses a short math test and an unstructured interview with the operations manager. The new process has three steps. First, an applied math screen using trade problems such as conduit fill and measurement, with the passing score set from the performance of current successful apprentices. Second, a paid half-day work sample on a training site, where candidates bend conduit, pull wire and mount boxes under a foreman's observation, rated on a checklist for safety, following directions and effort. Third, a structured interview scored by two foremen using the same questions and anchored rating scales, asking about past examples of reliability, working in bad conditions and learning from mistakes. In the long review by Schmidt and Hunter (1998), tryouts of the real work and interviews run from a fixed script both forecast later job performance much better than a free-form chat with a manager.

What this page is doingThree steps with evidence behind them.
8

Fairness and Legal Review

Each step will be reviewed for adverse impact. HR will compare pass rates by sex, race and ethnicity, and age every six months, and whenever one group's pass share drops under four-fifths of the top group's share, HR will examine whether the step is job related and whether an alternative with less impact exists. The math screen will use trade content only, and candidates will receive a practice set in advance. The work sample will allow reasonable accommodations, and the checklist will be reviewed by HR to remove items that measure strength beyond what the job requires. The structured interview's questions will be reviewed by HR and the company's employment counsel.

What this page is doingChecking for adverse impact.
9

Cost

The new process costs more per hire but less per apprentice who stays. The job preview video costs about $6,000 to film once and will be reused for three years. Referral bonuses at $750 for perhaps twelve hires a year come to $9,000. The paid work sample costs about $90 per candidate in wages plus a foreman's half day, roughly $14,000 a year for 60 candidates. Career academy shadow days and summer helper jobs cost about $20,000. Halving job board spending saves about $11,000. Counting the video over three years, the net added cost of roughly $34,000 a year looks modest next to the roughly $18,000 in wages and fees sunk into a second-year apprentice who walks off; keeping just three more apprentices a year pays for the program.

What this page is doingWhat the new process requires.
10

Measures

Holston will track, by source and by selection score: the share of applicants who withdraw after the job preview, which is a healthy sign if it rises; time to fill; first-year retention; foreman ratings at six and twelve months; and completion of the first year of classes. The goal is for four in five new apprentices, up from about three in five, to still be on the payroll two years after hire, within three years, which the workforce plan requires.

What this page is doingLinking hiring to who stays.
11

Conclusion

Holston's apprentice problem begins before day one. An honest message, sources that bring people who stay, and a selection sequence that lets applicants try the work give the company a better chance of hiring apprentices who reach their second and third years. The next stage, the first ninety days, will decide whether those gains hold.

What this page is doingHiring people who will stay.
12

References

Breaugh, J. A. (2008). Employee recruitment: Current knowledge and important areas for future research. Human Resource Management Review, 18(3), 103-118. https://doi.org/10.1016/j.hrmr.2008.07.003

Chapman, D. S., Uggerslev, K. L., Carroll, S. A., Piasentin, K. A., & Jones, D. A. (2005). Applicant attraction to organizations and job choice: A meta-analytic review of the correlates of recruiting outcomes. Journal of Applied Psychology, 90(5), 928-944. https://doi.org/10.1037/0021-9010.90.5.928

Earnest, D. R., Allen, D. G., & Landis, R. S. (2011). Mechanisms linking realistic job previews with turnover: A meta-analytic path analysis. Personnel Psychology, 64(4), 865-897. https://doi.org/10.1111/j.1744-6570.2011.01230.x

Schmidt, F. L., & Hunter, J. E. (1998). The validity and utility of selection methods in personnel psychology: Practical and theoretical implications of 85 years of research findings. Psychological Bulletin, 124(2), 262-274. https://doi.org/10.1037/0033-2909.124.2.262

What the HRM 425 Module 3 instructions ask for

Milestone One in HRM 425 usually asks for a recruitment and selection strategy for an organization or a key job. Expect to describe the job and its requirements, evaluate current recruiting sources, propose recruiting methods and messages, design a selection process, address legal and fairness considerations and explain how you will measure results. Some versions ask you to connect the strategy to workforce planning from an earlier module. A strong milestone starts with what the job really demands, uses data on where good hires come from, chooses selection tools for their evidence of validity, tests them for adverse impact and measures success by how hires perform and how long they stay rather than by how fast seats are filled.

How this HRM 425 Module 3 milestone one example is built

The sample shows that Holston Electric Company's apprentices hired through a job board left at twice the rate of those referred by current employees. It proposes a realistic job preview, a three-minute video filmed on a January rough-in site with apprentices describing cold mornings and their pay schedule, and new sources: two high school career academies, a regional veterans' transition program and paid referrals from current apprentices. Selection becomes an applied math screen, a half-day paid work sample bending conduit and pulling wire under a foreman's eye and a structured interview scored by two foremen. The paper checks pass rates by group and tracks first-year retention by source. A cost section shows the new process adds about $34,000 a year, which three extra apprentices kept would repay.

Where the HRM 425 Module 3 rubric puts the points

Milestone One rubrics commonly score the job analysis, the evaluation of recruitment sources and methods, the design of the selection process, legal and ethical considerations, measurement of results and writing with APA citations. Exemplary work grounds recruitment choices in data, explains why each selection tool is valid for the job, plans a fair process and links measures to later life cycle outcomes. Papers lose points for recruiting plans that list channels without evidence, for selection tools chosen by habit, for ignoring adverse impact and for success measures limited to time to fill or cost per hire with no attention to quality or retention.

HRM 425 Module 3 help: the mistakes that cost points

Begin with the job itself: shadow it, read the duties and ask what separates people who succeed from those who quit in the first year. Then look at your recruiting data by source, since referrals and some school partnerships often bring people who stay longer. Write the message honestly, including the hard parts of the work; a realistic preview lets the wrong applicants opt out early. Choose selection tools with evidence behind them, such as work samples and structured interviews, and explain why each fits the job. Check pass rates by group for adverse impact. Finish with measures that follow hires into their first year, not just the hiring calendar.

Get HRM 425 Module 3 written to your instructions

Upload the HRM 425 Milestone One guidelines and the job you are hiring for. We analyze the role, compare recruiting sources with real numbers, build a selection sequence on validated methods, check it for fairness and add measures tied to who stays. About two days; a first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More HRM 425 papers and related BS Human Resource Management samples

HRM 425 Module 3 questions, answered

Where can I find a free HRM 425 Module 3 Milestone One sample?

This page holds the full HRM 425 Module 3 Milestone One paper, a recruitment and selection strategy for electrical apprentices with a job preview and work sample.

What is a realistic job preview?

Honest information about a job's demands and drawbacks given to applicants before they accept, which helps some opt out and reduces early turnover among those who join.

Which selection methods predict job performance best?

Research by Schmidt and Hunter found work samples, structured interviews and general mental ability tests among the stronger predictors, while unstructured interviews predicted less.

Why measure recruiting by source?

Because sources differ in the quality and retention of the hires they produce, so tracking first-year performance and turnover by source shows where to invest.

What is adverse impact in selection?

A substantially lower selection rate for a protected group, commonly flagged when one group's rate falls below four-fifths of the highest group's rate, which requires review.